Loading...
HomeSearchMy WebLinkAboutPR 24091: EL VISTA DRAINAGE IMPROVEMENT PROJECT, CHANGE ORDER NO. 2 (152 CALENDAR DAYS)PR 24178: PROFESSIONAL ENGINEERING SERVICES AGREEMENT WITH SOUTEX SURVEYORS & ENGINEERS, 9TH AVE. PAVING AND DRAINGAGE PROJECT FROM 36TH ST. TO EVERGREEN DR.PR 24179: PROFESSIONAL ENGINEERING SERVICES AGREEMENT WITH S&R CONSULTING AND CONSTRUCTION, LLC, DESIGN OF THE ROADWAY REHABILITATIONPR 24180: AGREEMENT WITH AWC FOR THE DESIGN OF THE THOMAS BOULEVARD IMPROVEMENT PROJECTPR 24181: FITTZ AND SHIPMAN, INC, DESIGN OF JADE AVE, HO MILLS TO FM ROAD 365, $311,450.00PR 24214: RENEWAL OF CONTRACT WITH ARDURRA GROUP, LLCPR 24221: TO RENEW FLOOD INSURANCE POLICIES FOR VARIOUS LOCATIONS WITH WRIGHT NATIONAL FLOOD INSURANCEPR 24237: RATIFICATION OF EMERGENCY 16" WATER MAIN LEAK REPAIR