Loading...
HomeMy WebLinkAboutPR 11777: CHANGE ORDERSPUBL]*C WORKS DEPARTMENT COUNC]'L ACT/ON MEMO TO: FROM: SUBIECT: DATE: Steve Fitzgibbons, City Manager Leslie E. McMahen, P.E., Director of Public Works P.R. #11777 May 9, 2002 RECOM MEN DATZON: It is recommended that the City Council approve Proposed Resolution No. 11777 authorizing the Mayor and City Manager to execute Change Orders No. 1, 2, 3, 4, 5 and 6/Final to the contract dated August 27, 2001 between the City of Port Arthur and Elliott Equipment & Construction of Groves, Texas for construction of Cells 44A, 44B and 45 at the City's Landfill Site increasing the contract amount by $9,974.35 f~om $898,459 to a new contract total of $908,433.35, authorizing the City Manager to execute a Certificate of Acceptance for the work and authorizing payment of Invoice No. 9 in the amount of $75,041.22 and Invoice No. 10/Final in the amount of $45,421.67. Funding available from FY2002 Budget Account No. 301-1601-591.89-00, CIP 203. BACKGROUND: Advertisements for Bids were published on .lune 17, 2001, .lune 24, 2001 and .luly 2, 2001, with the contract being awarded to Elliott Equipment and Construction on .luly 24, 2001 in the amount of $898,459 for Option B. Change Order No. 1 has been issued for an addition of 3000 gallon tanks at Cell No. 43 as well as new cells, for a contract increase of $4,360.02 to a new contract amount of $902,8:].9.62. Change Order No. 2 has been issued for additional work in sump areas due to excessive groundwater for a contract increase of $2,595 for a new contract amount of $905,414.02. Change Order No. 3 has been issued for a time extension of 87.5 days for lost work days due to weather delays, for a new completion date of March 22, 2002. Change Order No. 4 has been issued for a time extension of 30.8 days for lost work due to weather delays, for a new completion date of April 23, 2002. Change Order No. 5 has been issued for additional work in sump area for Cell No. 44A to remove excessive groundwater for a contract increase of $],367.74 for a new contract amount of $906,782.36. P.R. No. 11777 Page #2 Change Order No. 6/Final has been issued to adjust line item quantities to actual amounts used for a contract increase of $1,650.99 for a new contract amount of $908,433.35. A Certificate of Substantial Completion was issued on April 25, 2002 by .lack C. Und of T&N Laboratories, Inc. The project is now complete, EIliott Equipment & Construction has submitted Invoice No. 9 in the amount of $75,041.22 and Invoice No. 10/Final in the amount of $45,421.67. BUDGETARY/FzSCAL EFFECT: Funding is available in FY 2002 Account No. 301-1601-591.89-00, CIP 203. EMPLOYEE/STAFF EFFECT: Acceptance of this recommendation will have no effect on staffing levels at this time. SUMMARY: It is recommended that the City Council approve Proposed Resolution No. 11777 authorizing the Mayor and City Manager to execute Change Orders No. 1, 2, 3, 4, 5 and 6/Final to the contract dated August 27, 2001 between the City of Port Arthur and Elliott Equipment & Construction of Groves, Texas for construction of Cells 44A, 448 and 45 at the City's Landfill Site increasing the contract amount by $9,974.35 from $898,459 to a new contract total of $908,433.35, authorizing the City Manager to execute a Certificate of Acceptance for the work and authorizing payment of Invoice No. 9 in the amount of $75,041.22 and Invoice No. 10/Final in the amount of $45,421.67. Funding available from FY2002 Budget Account No. 301-1601-591.89-00, CTP 203. Leslie E. McMahen, P.E. Director of Public Works LEM/vkl c:\word\ca ms\ellioL~::loseout~andl~ll P,R. No. 11777 05/09/02 -vkl RESOLUTION NO, A RESOLUTION AUTHORIZING THE blAYOR AND CITY MANAGER TO EXECUTE CHANGE ORDERS NO, 1, 2, 3, 4, 5 AND 61FINAL TO THE CONTRACT DATED AUGUST 27, 2001 BETWEEN THE CITY OF PORT ARTHUR AND ELLIOTT EQUIPMENT & CONSTRUCTION OF GROVES, TEXAS FOR THE CONSTRUCTION OF CELLS 44A, 44B AND 45 AT THE CITY'S LANDFILL SITE, INCREASING THE CONTRACT AMOUNT BY $9,974.35 FROM $898,459 TO A NEW CONTRACT TOTAL OF $908,433.35, AUTHORIZING THE CITY MANAGER TO EXECUTE A CERTIFICATE OF ACCEPTANCE FOR THE WORK AND AUTHORIZING FINAL PAYMENT OF INVOICE NO. 9 IN THE AMOUNT OF $75,041.22 AND INVOICE NO. 101FINAL IN THE AMOUNT OF $45,421.67; FUNDING BEING AVAILABLE IN FY 2002 ACCOUNT NO. 301-1601-591.89-00 CIP 203. WHEREAS, T&N Laboratories, Inc. has issued a Certificate of Substantial Completion stating that the construction of Cells 44A, 44B and 45 at the City's Landfill Site has been completed, copy attached hereto and made a part hereof as Exhibit "A", together with the Contractor's Certificate and Release, copy attached and made a part hereof as Exhibit "B", and Contractor's Certificate of Guarantee, copy attached and made a part hereof as Exhibit "C', both having been executed on behalf of Elliott Equipment & Construction of Groves, Texas by Jerry Youngblood, President; and, WHEREAS, the original Contract amount was $898,459; and, WHEREAS, Change Order No. 1 dated November 12, 2001 increased the contract amount by $4,360.62, Change Order No. 2 dated December 26, 2001 increased the contract amount by $2,595, Change Order No. 3 dated December 28, 2001 increased the contract time by eighty-seven and one-half days (87.5) days, Change Order No. 4 dated March 27, 2002 increased the contract time by thirty and 8/10 (30.8) days and the amount P.R. No. 11777 Page by $3,927, Change Order No. 5 dated April 24, 2002 increased the contract amount by $1,367.74 and Change Order No. 6/Final dated May 9, 2002 increased the contract amount by $1,650.99, as shown in Exhibit "D" attached hereto and made a part hereof by reference a complete copy of which is available for review in the City Secretary's office; and, WHEREAS, the date of Substantial Completion for the work was April 25, 2002; and, WHEREAS, construction under said Contract is now complete; now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT the City Manager be and he is hereby authorized to execute Change Orders No. 1, 2, 3, 4, 5 and 6/Final which collectively increased the original contract amount of $898,459 to the final contract amount of $908,433.35, and increased the contract completion date by one-hundred, eighteen and 3/10 (118.3) days to a new completion date of April 23, 2002, as outlined in detail in said Change Orders; and, THAT the City Manager be and he is hereby authorized to execute on behalf of the City of Port Arthur a Certificate of Acceptance for the construction of Ceils 44A, 44B and 45 at the City's Landfill Site in the City of Port Arthur, attached hereto and made a part hereof as Exhibit "E"; and, THAT the Substantial Completion date being April 25, 2002; and, THAT the Final Contract Amount for the subject contract is $908,433.35; and, THAT Invoice No. 9 in the amount of $75,041.22 and Invoice No. 10 and Final in the amount of $45,421.67 from the Contractor be and is hereby approved; copy attached P.R. No. 11777 Page #3 hereto as Exhibit "F"; and THAT funding is available in FY2002 Budget Account No. 301-1601-591.89-00, CIP 203; and, THAT a copy of this Resolution be sent to the Contractor along with the check in FINAL payment; and, THAT a copy of the caption of this Resolution be spread upon the Minutes of the City Council. READ, ADOPTED, AND APPROVED this day of A.D., 2002, at a Meeting of the City Council of the City of Port Arthur, Texas, by the following vote: AYES: Mayor. Coucilmembers NOES: ATTEST: Acting City Secretary APPROVED AS TO FORM: City Attorney Mayor P.R. No. 11777 Page#4 APPROVED FOR ADMINISTRATION: Steve Fitzgibbons City Manager Leslie E. McMahen, P.E. Director of Public Works /A~PROVED AS TO AVAILABILITY OF FUNDS: Rebecca Underhill Finance Director file c:Ves~elliottconscloseoutlandflll Exhibit "A" T.A:BOILTI'I'OIU:ES, Ig FC. P.R. No. ,77 5020 JERRY WARE DR. (S.ET. REGIONAL AIRPORT) BEAUMONT, TX 77705 PHONE: (409) 727-6291 / FAX: (409) 722-6961 May 9, 2002 Mr. Leslie E. McMahen, P.E. Director of Public Works P. O. Box 1089 Port Arthur, Texas 77641-1089 RE: Certificate of Completion, Construction of Cell Nos. 44A, 44B & 45, City of Port Arthur Landfill Dear Mr. McMahen: This letter is provided to serve as a Certificate of Completion for the above referenced project. Based on the final inspection conducted on April 23, 2002 and submittal of final reports to the Texas Natural Resource Conservation Commission (TNRCC), excluding final acceptance and approval from TNRCC, I hereby certify that the project has been completed. Any revisions to the final reports required through TNRCC comments will be promptly provided as necessary. If you have any questions, please do not hesitate to contact our office. As in the past, it is always a pleasure to be of service to the City of Port Arthttr.t Thanks ['or your continued support! Sincerely, ?~.~..~.. T & N LABO~TO~ES, INC. ¢! .................................... j~p~~~ ~ JACK C. kIND ::,%~ 79555 Vice President/Engineering Manager .... ..... MAY-- 1 0--E)2 CONTRACTOR'S CERTIFICATE AND RELEASE Exhibit "B" ~No. 11777 1 of 2 FROM: TO:' REFERENCE CONTKACT NO. CPA-073 ELLIOTT EQUIPMENT AND CONSTRUCTION CO. (Name of CITY OF PORT ARTHUR, TEXAS (Local Public Agent) ENTERED INTO THE 24th DAY OF July, 2001 , BETWEEN THE CITY OF PORT ARTHUR OF JEFFERSON COUNTY, TEXAS AND ELLIOTT EQUIPMENT AND CONSTRUCTION CO. OF Groves, Texas (CITY) (STATE) FOR THE CONSTRUCTION (Name of Operations) OF THE LANDFILL LINER ON CELL NOS. 44A,44B, & (Name of Project) OF NORTH LEVEE AND DITCHES LOCATED IN THE CITY OF PORT ARTHUR, TEXAS. 45 AND RESHAPING/REGRADIN( (Pr'~3%ct No.) CPA-073 KNOW ALL }~N BY ~HESE PRESENTS: '1. The undersigned hereby certifies that there is due from and payable by the Local Public Agency to the Contractor under the contract and duly approved Change Orders and modifications the balance of One hundred twenty thousand four hundred sixty.~.two ($ 120,462.89 ). dollars and eighty nine cents (Estimate ~9 & 10) 2. The undersigned further certifies that in addition to the amount set forth in paragraph 1, there are outstanding and unsettled the following items which he claims are just and due and owing by the City to the Contractor~ (a) NONE (b) (c) (d) (Itemize claims and amounts due)(if none, so state 3. The undersigned further certifies that all work required under this contract including work required under change orders numbered 1, 2, 3, 4, 5, and 6 has been performed in accordance with the' ~rms the~'~of',""and that there are no unpaid claims for materials, supplies or equipment and no claims of laborers or mechanics for unpaid wages arising out of the performance of 5his contract, and that the wage rates paid by the Contractor and all Subcontractors were in conformity with the contract provisions relating to said wage rates. g~ Except for the amounts stated under paragraphs 1 and 2 hereof, the undersigned has received from the City of Port Arthur all ~s of money payable to the undersigned under or pursuant to the above mentioned con%tact or any modification or change thereof. 5. That in consideration of the payment of the amount stated E~iblt"B" in paragraph 1 hereof t.he undersigned does hereby release the 2of2 City of Port Arthur from any and all claims arising under or by virtue of this contract, except the amount listed in paragraph 2 hereof; provided, however, that if for any reason the City of Port Arthur does not ~ay in full the amount stated in paragraph 1 hereof, said deductzon shall not affect the validity of this release, b.ut the amount so deducted shall be automatically included under paragraph 2 as an amount which the Contractor has not released but will release upon payment thereof. The Contractor further certifies that upon the payment of the amount listed in paragraph 2 hereof, and of any amount which may be deducted from paragraph 1 hereof, he will release the City of Port Arthur from any and all claims of any nature whatsoever arising out of said contract or modification thereof, and will execute such further releases or assurances as the City of Port Arthur may request. IN WITNESS WHEREOF, the undersigned has signed and sealed this instrument this 10th day of May ,X~92002. Jerry Youngblood (Affiant) ELLIOTT EQUIPMENT AND CONSTRUCTION(~A] (Contractor) of fficer> Jffrry Y~x~n~lood - Vice President , being first duly sworn on oath, deposes and says, first, that he is the of the ELLIOTT EQUIPMENT AND CONSTRUCTION CO. (Name oY Company) that he has read the second, subscribed as vice President ' '(Tl't'le) the ELLIOTT EQUIPMENT AND CONSTRUCTION CO. (Name of Company) Affiant further herein are true. , Subscribed and sworn My com.mision expires Vice President (Title) foregoing certificate by him of states that the matters and things stated COFFfRACTOR'S U~iTIFICATE OF G%I~RAh'fEE Exhibit "C" P.IL No. 11777 1 of 2 FROM: ELLIOTT EQUIPMENT AND CONSTRUCTION CO. (Name Of ~6ntractor) CITY OF PORT ARTHUR, TEXAS · ' fLocal Public Age~'cy) R~'~CE ~r ~. CPA-073 · ENTERED INT0 THE 24th DAY OF ...~uly, 2001 CITY OF POR~ AR~3R OF J~I.'~'~i~SON COU~fY, TEXAS ELLIOTT EQUIPMENT AND CONSTRUCTION CO. (N~n~ of Contracto'~) OF Groves, Texas Construction FOR THE (N~n~ of Oper~at'ions) OF THE Landfill Liner on Cell Nos. 44A, 44B & .~5 and Reshapinq/ (Namaof Pro~)'" Regrading of North Lev~Per~t~hes LOCA~o IN THE CITY OF PORT ARYHUP,, T~iAS. ALL ~N BY THESE PPZSS~TS: CPA-( 1. ELLIOTT EQUIPMENT AND .C.QNSTRUCTION CO. does hereby guarantee all of the work done under the above referenced contract to be free frc~ faulty t~aterials in every particular, a~.d free from improper work~a~ship, ~d against injury, from proper and usual wear; and agrees to replace or re-execute wlthou[ cost to the O~,/%er such %~rk as may be found r~ be improper or ~.~perfect, e.~d to mmk~ good all damage caused to other work or materials, due to such required replac~rent or re-execution. 2. This gumrantee shall cover a period of one (1) year from the date of acceptance of all work ~nder this Contract, as evidm~ced by the City of Port Arthur's Engineer's final certificate. 3. This Certificate is given in connection of the final paym~t under the contrac~ betwaen the City of Port ~rthur and ELLIOTT EQUIPMENT AND CONSTRUCTION COMPANY ~d with the knowledge that it w-ill be relied upon in r~ ~'~ch payment a.nd that such pa}vne~t ~uld no~ be made except upon the truth of the ma[ter contained in ~his affidavit. IN WIT~F~SS WF~7{EOF, the undersigned has 'signed and sealed rJ~is instrurmm~t this 10th day of May, 2002 Page Two Contractor's Certificate of ~rantee Exhibit "C" P.R. No. 11777 2 of 2 ELLIO~T EQUIPmeNT AND CONSTRUCTION(SEAL) (Contractor) COMPANY Jerry Youngblood (Affiant) Jerry Youngblood - Vice President .. , being first duly ~worn on oath, deposes and says, first, that he is the Vice President (Title) of the ELLI~OTT EQUIPMENT AND CONSTRUCTION CONPANY (Name of C~i~any) second, that he has read the foregoing certificate by hL~. subscribed as Vice President of (Title) the ELLIOTT EQUIPMENT AND CONSTRUCTION CO. (lqan~~ Affiant further states t/nat the matters and things stated herein are true. Subscribed and >efore ~.m this 10tbday of May , 20O2 . (Notary) Exhibit 'D" P.R. No. 11777 COPIES OF EXHIBIT "D" ARE AVAILABLE FOR REVIEW IN THE CITY SECRETARY'S OFFICE CERTIFICATE OF ACCEPTANCE FOP, THE CONSTRUCTION OF CELLS 44A, 44B AND 45 AT THE CITY'S LANDFILL SITE IN THE CITY OF PORT ARTHUR Exhibit "E" P.R. No. 11777 TO: Jerry Youngblood, President Elliott Equipment & Construction Dear Mr. Youngblood: This is to certify that the City of Port Arthur, Texas, accepts the construction of Cells 44A, 44B and 45 at the City's Landfill Site in the City of Port Arthur as being completed on the basis of the Certificate of Completion. Steve Fitzgibbons City Manager Date CITY OF PORT ARTHUR LANDFILL LINER SYSTEM FOR CELL NOS. 44A, 44B, & 45, AS WELL AS, RESHAPING/REGRADING OF NORTH LEVEE/DITCH SYSTEM AT CITy OF PORT ARTHUR LANDFILL LOCATED ON HIGHWAY 73-- OPTION B CONTRACT: 238.3 CALENDAR DAYS CALENDAR DAYS USED: 206 Exhibit P.R. No. 11777 1 of 2 DATE: 4-25-02 ESTIMATE NO. 9 DESCRIPTION QUANTITY QUANTITI'Y PR/CE 1. Mobilization/Demobilization 1 LS I 15,000.00 15,000.00 2. Subgrade Excavation/ Backfill & Grading (including abandonment/removal of existing drain pipe & inter- mediates containment berm) 15,000 C¥ 100% 7.50 112,500.00 2A. West Levee Reconstruction ILS 100% 20,000.00 20,000.00 3. North Levee/Ditch Reshap- ing/ Regrading (including insta/atlon of new drain pipe) 1 LS 100% 52,500.00 52,500.00 4. Geosynthetic Clay Liner CO :0 501,000 SF 501,928 0.362 181,697.94 5. Geomembrane Lin~)~ {5A) Smooth 406,000 SF 403,489 0.322 129,923.46 {EB) Textured ~U~6 95,000 SF 102,918 0.353 36,330.05 6. 6" Diameter, Perforated, Schedule 80 PVC Leachate Collection Pipes (including proper connections, elbows, etc.) 2,280 LF 2,280 10.00 22,800.00 7. Leachate Collection Sump w/th 12" and 6' Diameter PVC Pipes and Caps 1 LS 1 14,000.00 14,000.00 8. Gravel Backfill for Collection Sump and Trenches including 12 oz/s¥ geotextile) 420 CY 4:20 42.00 17,640.00 9. Leachate Drainage Layer Geocomposite on Floor & Slopes C0~6 501,000 SF 498,834 0.31C 154,638.54 10. Protective Cover Soil (2) 37,200 C¥ 37,200 2.30 85,560.00 11. Leachate Chimneys (3) 2,280 LF 2,280 9.01 20,520.00 12. Leachate Removal/Storage System (including ail pumps & tubing, electrical, tank, etc. 1 LS 1 36,000.00 36,000.00 13. Nliscellane GUS Appu r ten- ances (including guard posts, tank pad, etc.) 1 LEI 1 1,000.00 1,000.00 CHANGE ORDER #1 4,360.69 CHANGE ORDER #2 2,595.00 TOTAL CONTRACT AMOUNT: 908,433.35 TOTAL BILLABLE TO DATE: MATERIALS ON HAND: LESS 5%3 RETAINAGE AMOUNT: LESS PREVIOUS BILLINGS: TOTAL ANIOUNT DUE THIS INVOICE: 908,433.35 0.00 45,421.67 787,970.46 75,041.22 CITY OF PORT ARTHUR E~ib~t LANDFILL LINER SYSTEM FOR CELL NOS. 4.4A, 44B, & 45, P.R. No. 11777 AS WELL AS, RESHAPING/REGRADING OF NORTH LEVEE~DITCH SYSTEM 2 ol' 2 AT CITY OF PORT ARTHUR LANDFILL LOCATED ON HIGHWAY 73 - OPTION B CONTRACT: 238.3 CALENDAR DAYS CALENDAR DAYS USED: 206 DATE: 4-25-02 ESTIMATE NO. 10-FINAL ESTIMATED I COMPLETED UNITI AMOUNT DESCRIPTION (~UANTITY (~UANTITIY PRICE 1. Mobilization/Demobilization[ 1 LS 15,000.00 15,000.00 2. S ubgrade Excavation/ Backfill & Grading (includ ng abandonment/removal of existing drain pipe & inter- mediates containment bern 15,000 CY 100% 7.50 112,500.00 2A. West Levee Reconstruction 1 LS 100% 20,000.00 20,000.00 3. North Levee/Ditch Reshap- ing/ Regrading (including instalation of new drain pip ILS 100% 52,500.00 52,500.00 4. Geosynthetic Clay Liner CC ~:6 501,000 SF 501,928 0.362 181,697.94 5. Geomembrane Liner (5A) Smooth C0~:6 406,000 SF 403,489 0.32,~ 129,923.46 (SB) Textured C0:~6 95,000 SF 102,918 0.353 36,330.05 6. 6' Diameter, Perforated, Schedule 80 PVC Leachate Collection Pipes (including proper connections, elbows, etc.) 2,280 LF 2,280 10.00 22,800.00 7. Leachate Collection Sump with 12" and 6" Diameter PVC Pipes and Caps ILS I 14,000.00 14,000.00 8. Gravel Backfill for Collection Sump and Trenches (including 12 oz/sy geotextile) 420 CY 420 42.00 17,640.00 9. Leachate Drainage Layer Geocomposite on Floor & Slopes C0~6 501,000 SF 498,834 0.310 154,638.54 10. Protective Cover Soil (2) 37,200 CY 37,200 2.30 85,560.00 11. Leachate Chimneys (3) 2,280 LF 2,280 9.00 20,520.0C 12. Leachate RemovE/Storage System (including all pumps & tubing, electrical, tank, etc. ILS 1~ 36,000.00 36,000.00 13. Miscellaneous Appurten- ances (including guard posts, tank pad, etc.) 1 LS 1 1,000.00 1,000.00 CHANGE ORDER # 1 4,360.69 TOTAL CONTRACT AMOUNT: 908,433.35 JACt~ LIND i~ /O~ TOTAL BILLABLE TO DATE: MATERIALS ON HAND: LESS 5% RETAINAGE AMOUNT: LESS PREVIOUS BILLINGS: TOTAL AMOUNT DUE THIS INVOICE: 908,433.35 0.00 0.00 863,011.68 45,421.67