Loading...
HomeMy WebLinkAboutPR 19349: ALLCO EMERGENCY REPAIR OF SEWER FORCE MAIN CONTRACT Ir E^agy --. _ . City of Cir)' w ort rthIIr Texas INTEROFFICE MEMORANDUM WATER UTILITIES DEPARTMENT-ADMINISTRATION TO: Brian McDougal, City Manager FROM: Jimmie Johnson, Ph.D., Director of Water Utilities DATE: Friday, April 01, 2016 RE: Proposed Resolution No 19349 Nature of Request: I recommend City Council approve Proposed Resolution No. 19349 requesting the ratification of the emergency repairs to a 24" sewer force main at the North Plant Lift Station by ALLCO LLC, of Beaumont, Texas, with a projected budgetary impact of$150,000.00. Staff Analysis/Considerations: A 24" sewer force main broke on March 28th at North Plant Lift Station located at 6439 North Twin City Highway. Damage to 24 inch sewer main is extensive and cause damage to the surrounding area posing an immediate health and safety risk. The damage to the sewer main will have to be repaired to meet City and TCEQ standards. The City Manager approved proceeding with these emergency repairs ASAP. BUDGET/FISCAL EFFECT Funds are available in account#410-1251-532.54-00. STAFFING/EMPLOYEE EFFECT Existing City staff will coordinate the operation of lift station and bypassing in order to assist the Contractor. SUMMARY I recommend City Council approve Proposed Resolution No. 19349 ratifying emergency repairs to a 24" sewer force main at the North Plant Lift Station by ALLCO LLC, of Beaumont, Texas, with a projected budgetary impact of$150,000.00. P. R. No. 19349 03/30/2016 jj RESOLUTION NO. A RESOLUTION REQUESTING RATIFICATION OF EMERGENCY REPAIRS TO A 24" SEWER FORCE MAIN AT THE NORTH LIFT STATION, LOCATED AT 6439 NORTH TWIN CITY HIGHWAY, BY ALLCO LLC, OF BEAUMONT, TEXAS, WITH A PROJECTED BUDGETARY IMPACT OF $150,000.00. FUNDS AVAILABLE IN ACCOUNT NO. 410-1251-532.54-00 WHEREAS, there is a 24" sewer force main failure at the North Lift Station, located at 6439 North Twin City Highway, causing an immediate danger to public health and safety; and, WHEREAS, this sewer force main cannot be shut down for an extended period of time in our collection system due to sewer collection services and volume; and, WHEREAS, pursuant to Section 252.022(a)(1) this purchase is authorized because of significant damage to the North Plant Lift Station, which requires the immediate appropriation of money to preserve the property of the municipality; and, WHEREAS, pursuant to Section 252.022(a)(2), this procurement is necessary to preserve or protect the public health or safety of the municipality's residents; and, WHEREAS, it is further authorized pursuant to Section 252.022(a)(3) because of unforeseen damage to public machinery, equipment, or other property; and, WHEREAS, City staff received a proposed cost letter to perform the necessary repairs on an emergency basis from ALLCO LLC (Exhibit"A"); and, WHEREAS, the City Manager, has approved proceeding with the repairs on an emergency basis due to the severity of the immediate danger to public health and safety. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT, in order to protect the health and safety of our citizens, the City Council hereby authorizes emergency repairs to a 24" sewer force main failure at the North Plant Lift Station by ALLCO LLC,with a projected budgetary impact of$150,000.00. THAT,the City Manager is authorized to enter into a contract with ALLCO LLC, for the repairs to the 24" sewer force main failure at the North Plant Lift Station, with a projected budgetary impact of$150,000.00. THAT, a copy of the caption of this resolution be spread upon the minutes of the City Council. P. R. No.19349 03/30/16 Page 2 of 2 READ, ADOPTED AND APPROVED THIS day of 2016 at a Regular Meeting of the City Council of the City of Port Arthur, Texas, by the following vote: AYES: Mayor • Councilmembers: NOES: Deloris Prince Mayor ATTEST: APPROVED AS TO FORM: aeJoivi% 0 Sherr Bellard Valecia Tizeno City Secretary City Attorney APPROVED: FOR ADMINISTRATION: APPROVED AS TO AVAILABILITY OF FUNDS: 1) 47'‘A4-.4 eo1167;ea//<•:e Brian McDougal Jerry Dale City Manager Director of Finance Account No.: 410-1251-532.54-00 tAtetif Dr. Jimmie Johnson Clifton Williams Assistant City Manager Interim Purchasing Manager EXHIBIT "A" (Estimate from Allco) • A DESIGN MIJILD UC TIN CONSTH TION UILDMENT GENERAL CONTRACTOR P.0.Box 3684,Beaumont,Texas 77704 Phone:409-860-4459 Fax:409-860-3857 Email:a11coaPallco.com March 30,2016 Attn: Mr.Bonnie Stanton City of Port Arthur P.C). Box 1089 Port Arthur,Texas 77640 Re: 24"Force Main Repair-North Lift Station • Dear Mr.Stanton: Please let this letter confirm,our phone conversation from this morning on the above referenced emergency repair. A conservative budget cost of$150.000 should be adequate for the repair barring an unusual circumstance. This unusual circumstance could involve bypass pumping of the lift station,which would be a substantial undertaking considering the size of the lift station. While any cost figure at this point is an educated guess.since the line has not been excavated and evaluated,we feel the$150.000 cost would be a good budget. Hopefully the repair will not be a major undertaking involving bypass pumping of the lift station, and the cost will fall under the budget. Let me know if you have any questions. Sincerely. ALLCO LLC Keith Burrell