Loading...
HomeMy WebLinkAboutPR 19414: ERGONOMICS TRANSPORTATION SOLUTIONS, INC., ENGINERING DESIGN FOR A TRAFFIC SIGNAL City of - 16M7 nrt rtltttr 7exus INTEROFFICE MEMORANDUM PUBLIC WORKS DEPARTMENT-ADMINISTRATION DIV. Date: June 8, 2016 To: Brian McDougal, City Manager From: Rawetts Baaheth, Sr., Interim Director of Public Works jK /2 RE: Proposed Resolution No. 19414 RECOMMENDATION I recommend that the City Council approve P. R. No. 19414 authorizing a third contract extension with Ergonomic Transportation Solutions, Inc. (ETSI) from June 9, 2016 to June 8, 2017, to perform the engineering design for a traffic signal at the intersection of 9th Avenue and Lake Arthur Drive for no additional cost. BACKGROUND Per Resolution 13-531, the City of Port Arthur entered into a contract with Ergonomic Transportation Solutions, Inc. (ETSI) which ended March 9, 2014. Per Resolution 14-126, a contract extension was accepted to continue the performance of engineering services. Per Resolution 15-223, a second contract extension was accepted to continue the performance of engineering services. A third extension is needed to continue a contract with Ergonomic Transportation Solutions, Inc. (ETSI) to perform the engineering design for a traffic signal at the intersection of 9th Avenue and Lake Arthur Drive for no additional cost. BUDGET/FISCAL EFFECT Funds are available in account Professional Services 001-1202-531.54-00.x' STAFFING/EMPLOYEE EFFECT None SUMMARY I recommend that the City Council approve P. R. No. 19414 authorizing a third contract extension with Ergonomic Transportation Solutions, Inc. (ETSI) from June 9, 2016 to June 8, 2017, to perform the engineering design for a traffic signal at the intersection of 9th Avenue and Lake Arthur Drive for no additional cost. "Remember we are here to serve the Citizens of Port Arthur" P.R. 19414 06/08/16 rtb RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE A CONTRACT EXTENSION FOR PROFESSIONAL SERVICES BETWEEN THE CITY OF PORT ARTHUR AND ERGONOMICS TRANSPORTATION SOLUTIONS, INC. OF HOUSTON, TEXAS TO PROVIDE THE ENGINEERING DESIGN FOR A TRAFFIC SIGNAL AT 9TH AVENUE AND LAKE ARTHUR DRIVE FOR NO ADDITIONAL COST. WHEREAS, per Resolution 13-531 the City of Port Arthur entered into a contract with Ergonomic Transportation Solutions, Inc. to provide engineering design services for a traffic signal at 9th Avenue and Lake Arthur Drive due to Police Department's request from December, 9, 2013 to March 9, 2014; and, WHEREAS, per Resolution 14-126 the City of Port Arthur authorized a contract extension for professional services for a traffic signal at 9th Avenue and Lake Arthur Drive from March 10, 2014 to June 8, 2015; and, WHEREAS, per Resolution 15-223 the City of Port Arthur authorized a 2nd contract extension for professional services for a traffic signal at 9th Avenue and Lake Arthur Drive from June 9, 2015 to June 8, 2016; and, WHEREAS, a third contract extension from June 9, 2016 to June 8, 2017 is needed to continue the engineering design services for this project; and, WHEREAS, funding is available in account number 001-1202-531.54-00; now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT, the facts and opinions in the preamble are true and correct; and, P.R. 19414 Page 2 THAT, the City Manager is hereby authorized to execute a contract extension with Ergonomic Transportation Solutions, Inc. for engineering services for a traffic signal at 9th Avenue and Lake Arthur Drive for no additional cost, funding being available in account 001-1202-531.54-00 in substantially the same form as Exhibit "A"; and, THAT, a copy of the caption of this Resolution be spread upon the Minutes of the City Council. READ, ADOPTED AND APPROVED this the day of , A.D. 2016 at a meeting of the City of Port Arthur, Texas by the following vote: Ayes: Mayor: Councilmembers: Noes: Mayor P.R. 19414 06/08/16 rtb Attest: APPROVED AS TO AVAILABILITY OF FUNDS: x , • r Cg tip72.5/(PA Sherri Bellard Jerry Dale, CPA, GFOA City Secretary Director of Finance AP'• 0 ED . 0 FORM: 'u,(/):1- / , ':1t Clifton Williams, CPP9 'Alt& _ Actin rchasing Manager Valecia Tizeno / City Attorney / ` ,`A.�/ A•awetts T. Baaheth;Sr. Interim Director of Public Works APPROVED FOR ADMINISTRATION: Brian McDougal City Manager EXHIBIT A THIRD CONTRACT EXTENSION FOR TRAFFIC SIGNAL DESIGN: 9TH AVENUE AT LAKE ARTHUR DRIVE IN PORT ARTHUR, TEXAS THIS AGREEMENT, made this day of June , 2016, by and between the City of Port Arthur, a municipal corporation organized under the laws of the State of Texas, hereinafter called "OWNER" or "CITY", and Ergonomic Transportation Solutions, Inc. a(n) Corporation herein acting by and Individual, firm, partnership, or corporation through Harry C. Simeonidis, P.E., Principal hereinafter called "CONTRACTOR". WITNESSETH: That for and in consideration of the payment terms, conditions, and agreements set forth herein, OWNER and CONTRACTOR agree as follows: 1. The term of this Contract extension shall be for a period of 365 days from the date of execution. 2. During the term of this Contract, the CONTRACTOR will furnish at his own expense all of the materials, supplies, tools, equipment, labor, and other services necessary to connection therewith, excepting those supplies specifically not required of CONTRACTOR in the Specifications. 3. The CONTRACTOR agrees to perform all the work described in the Specifications and Contract Documents and comply with the terms therein for the prices as stated in the attached proposal for the amount of $39,638.72. 4. The term "Contract Documents" means and includes the following: (A) Agreement (B) Advertisement for Bids (C) General Information (D) Specifications (E) Bid Extension Memo (F) Bidder's Information Sheet (G) Notice to Proceed 5. This Agreement shall be binding upon all parties hereto and their respective heirs, executors, administrators, successors, and assigns. 6. The CONTRACTOR will provide performance and payment bonds as required. Page 1 7. IN WITNESS WHEREOF, the parties hereto have executed, or caused to be executed by their duly authorized officials, this Agreement in two (2) copies, each of which shall be deemed an original on the date first written above. OWNER CONTRACTOR Ergonomics Transportation Solutions BY: BY: Brian McDougal Harry C. Simeonidis, P.E. City Manager Principal Page 2 ERGONOMIC TRANSPORTATION SOLUTIONS, INC. 5300 Hollister, Suite 220 Houston, Texas 77040 Tel. (713) 956-9601 Fax: (713) 956-9667 June 8, 2016 Mr. Rawetts Baaheth City of Port Arthur P.O. Box 1089 444 4th Street Port Arthur, Texas 77641 Re: Engineering Design for Traffic Signal at 9th Avenue and Lake Arthur Drive, in Port Arthur, Texas Dear Mr. Baaheth: This is a request to extend our contract from June 9th, 2016 to June 8th, 2017. Thank you for giving us the opportunity to assist you. Sincerely, Harry Simeonidis, P.E. President