Loading...
HomeMy WebLinkAboutPR 19417: TO REJECT ALL BIDS FOR STORM SEWER IMPROVEMENTS 4 City of %_'� c., --, vr rt rthu Texan INTEROFFICE MEMORANDUM PUBLIC WORKS DEPARTMENT-ADMINISTRATION DIV. To: Brian McDougal, City Manager From: Rawetts Baaheth, Sr., Interim Public Works Director Date: June 13, 2016 RE: Proposed Resolution No. 19417 RECOMMENDATION It is recommended that the City Council approve Proposed Resolution No. 19417 rejecting all bids for Storm Sewer Improvements along Woodworth Blvd. from Thomas Blvd. to 7th Street in Port Arthur, Texas. Due to all bids received for the project exceeded the funds allocated from the Disaster Recovery Fund (GLO) account, this project will be re-evaluated, re-designed and re-bid in order to meet the available budget. BACKGROUND On March 9, 2016 the City of Port Arthur received four (4) bids for construction of Storm Sewer Improvements along Woodworth Blvd. from Thomas Blvd. to 7th Street in Port Arthur, Texas. The lowest bid was received from DezTex Industrial in the amount of$ 998,995.00 and the highest bid received by Allco Construction in the amount of $ 1,703,760.00. Listed below are the prospected bidders and their estimated bid amounts: Bidder Name Bid Amount DezTex Industrial Services, LLC $ 998,995.00 BDS Constructors dba MK Constructors $ 1,273,164.00 Excavators & Constructors, LLC $ 1,347,891.13 Allco $ 1,703,760.00 BUDGET/FISCAL EFFECT Funding available in the Disaster Recovery Fund (GLO) account no. 145-1201-532.59-00.✓ STAFFING/EMPLOYEE EFFECT None "Remember we are here to serve the Citizens of Port Arthur" P.R. 19417 06/22/16 rtb RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO REJECT ALL BIDS FOR STORM SEWER IMPROVEMENTS ALONG WOODWORTH BLVD. FROM THOMAS BLVD. TO 7TH STREET IN PORT ARTHUR, TEXAS,AND TO REBID THE PROJECT. WHEREAS, the City of Port Arthur Engineering Division solicited bids and received four (4) bids, as shown on the attached Exhibit "A", for the Storm Sewer Improvements along Woodworth Blvd. from Thomas Blvd. to 7th Street; and, WHEREAS,the lowest bid in the amount of$998,995.00 exceeded the budgeted amount allocated in the Disaster Recovery Fund (GLO) account no. 145-1201-532.59-00 (see attachment "A"); and WHEREAS, the project engineer, Arseneaux, Wilson & Cole has recommended that the bids be rejected and that the project be rebidded to include necessary changes in scope and technical specifications; and, WHEREAS, §271.027 of the Texas Local Government Code grants the governing body authority to reject any and all bids submitted for a contract which competitive is required; and, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT,the facts and opinions in the preamble are true and correct; and, THAT, the City Council authorizes the rejection of the four(4) bids for the Storm Sewer Improvements along Woodworth Blvd. from Thomas Blvd. to 7th Street and authorizes the re- bidding of the same with the changes in scope and technical specification changes. and, THAT, a copy of the caption of this Resolution be spread upon the Minutes of the City Council. P. R. 19417 Page 2 READ, ADOPTED AND APPROVED this the day of , A.D. 2016 at a meeting of the City of Port Arthur, Texas by the following vote: Ayes: Mayor: Councilmembers: Noes: Mayor Debris "Bobbie"Prince Attest: City Secretary Sherri Bellard APPROVED AS 0 FORM: APPROVED FOR ADMINISTRATION: �i lANP Valecia o Brian McDougal City Attorney • City Manager APPROVED AS FOR AVAILABILITY OF FUNDS: Sly - Jerry Dale, CPA, GFOA Director of Finance R etts T. Baaheth, Sr. Interim Director of Public Works elft 41kr/, Clifton illiams, CPPB Acting Purchasing Director EXHIBIT A AI,1 ARCENEAUX WILSON&COLE RECEIVE® enyinee'iny I au,veyinn y ptuniny April 25, 2016 APR 2 7 2016 Rawetts Baaheth, Sr Cityof Port Arthur PUBLIC WORKS Admin.-City Hall 444 4th Street Port Arthur, TX 77642 Re: Strom Sewer Improvements along Woodworth Blvd. from Thomas Blvd. to 7th Street AWC Job No. CPA-855 Dear Mr. Baaheth: On March 9, 2016 the City of Port Arthur received four (4) sealed bids for Storm Sewer Improvements Along Woodworth Blvd. from Thomas Blvd. to 7th Street in Port Arthur, Texas. The bids were opened at 3:15 pm and the results read aloud in the public bid opening. The bids were checked for errors and tabulated. All Bidders acknowledged receipt of Addendum No.1, Addendum No. 2, Addendum No. 3, Addendum No. 4 and submitted proof of Bid Surety. No substitutions were submitted. It was found that Deztex Industrial Services of Port Arthur, Texas submitted the lowest responsive Total Amount Bid in the amount of$998,995.00. A copy of the certified Bid Tabulation is enclosed for your information. Due to the lowest responsive bid exceeding the funds allocated for this project it is our recommendation that the bid is not accepted. Therefore, changes to the project scope and technical specifications will be performed and the project will be bid again. Sincerely, Keestan Cole, PE Enclosure: Certified Bid Tab cc: Hassan Shomalzadeh, PE Mary Essex Sherry Tarrant DezTex Industrial Services Alico Mk Constructors Excavation & Construction 409.724.7888 2901 Turtle Creek Dr.,Suite 320 Port Arthur,TX 77642 Engineering Surveying awceng.com F-16194 10194049 /D_ • f, T" ARCENEAUX WILSON&COLE BID TABULATION eng,reenng 1 surveying I..^',.ng For The STORM SEWER SYSTEM IMPROVEMENTS ALONG WOODWORTH BLVD. FROM THOMAS BLVD.TO 7TH ST. To Serve The City of Port Arthur Job No.:CPA-855 BIDS OPENED:March 9,2016 at 3:00 PM DexTex Industrial Services,LLC BDS Constructors dba Excavation&Construction LLC Allco Port Arthur,TX MK Constructors Port Arthur,TX Beaumont,TX Vidor,TX Base Bid items QTY. Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount 1 Mobilization 1 $ 43,000.00 $ 43,000.00 $ 42,000.00 $ 42,000.00 $ 126,750.00 $• 126,750.00 $ 100,000.00 $ 100,000.00 2 Traffic Control 1 $ 20,000.00 $ 20,000.00 $ 20,500.00 $ 20,500.00 $ 84,691.04 $ 84,691.04 $ 114,800.00 $ 114,800.00 3 Seeding 0.48 $ 1,500.00 $ 720.00 $ 1,800.00 $ 864.00 $ 735.63 $ 353.10 $ 4,000.00 $ 1,920.00 4 Remove Type"C"Curb Inlets 37 $ 2,000.00 $ 74,000.00 $ 1,035.00 $ 38,295.00 $ 423.26 $ 15,660.62 $ 1,500.00 $ 55,500.00 5 Remove Type"C"Storm Manhole 13 $ 2,000.00 $ 26,000.00 $ 850.00 $ 11,050.00 $ 4,505.79 $ 58,575.27 $ 1,900.00 $ 24,700.00 6 Remove Grate Inlet 1 $ 2,000.00 $ 2,000.00 $ 1,035.00 $ 1,035.00 $ 487.39 $ 487.39 $ 1,300.00 $ 1,300.00 7 Brick both Ends of Exisitng Pipe 1 $ 3,000.00 $ 3,000.00 $ 8,200.00 $ 8,200.00 $ 2,924.36 $ 2,924.36 $ 6,500.00 $ 6,500.00 8 Remove 12-Inch Clay Pipe 185 $ 20.00 $ 3,700.00 $ 15.00 $ 2,775.00 $ 66.26 $ 12,258.10 $ 55.00 $ 10,175.00 9 Remove 12-Inch RCP 190 $ 20.00 $ 3,800.00 $ 15.00 $ 2,850.00 $ 65.63 $ 12,469.70 $ 50.00 $ 9,500.00 10 Remove 15-Inch RCP 560 $ 20.00 $ 11,200.00 $ 15.00 $ 8,400.00 $ 65.76 $ 36,825.60 $ 44.00 $ 24,640.00 11 Remove 24-Inch RCP 125 $ 20.00 $ 2,500.00_$ 15.00 $ 1,875.00 $ 83.06 $ 10,382.50 $ 58.00 $ 7,250.00 12 Remove Concrete Curb&Gutter 1025 $ 2.00 $ 2,050.00 _$ 5.00 $ 5,125.00 $ 14.34 $ 14,698.50 $ 10.00 $ 10,250.00 13 Remove Concrete Sidewalk 150 $ 5.00 $ 750.00 _$ 9.00 $ 1,350.00 $ 4.43 $ 664.50 $ 37.00 $ 5,550.00 14 Remove Concrete Base _ 2,145 $ 5.00 $ 10,725.00 $ 26.00 $ 55,770.00 $ 13.63 $ 29,236.35 $ 60.00 $ 128,700.00 15 Remove Concrete Drive _ 300 $ 5.00 $ 1,500.00 $ 8.00 $ 2,400.00 $ 5.42 $ 1,626.00 $ 38.00 $ 11,400.00 16 Remove and Replace Chain Link Fence 65 $ 20.00 $ 1,300.00 $ 43.00 $ 2,795.00 $ 12.18 $ 791.70 $ 30.00 $ 1,950.00 17 Remove and Replace Rod Iron Fence 25 $ 20.00 $ 500.00 $ 110.00 $ 2,750.00 $ 13.54 $ 338.50 $ 40.00 $ 1,000.00 18 Remove,Al Depths of Existing Hot Mix 7025 $ 6.00 $ 42,150.00 $ 11.00 $ 77,275.00 $ 2.68 $ 20,232.00 $ 17.00 $ 119,425.00 19 Adjust Existing Manhole 5 $ 200.00 $ 1,000.00 $ 850.00 $ 4,250.00 $ 304.62 $ 1,523.10 $ 305.00 $ 1,525.00 20 Type"C'Curb Inlet 32 $ 5,100.00 $ 163,200.00 $ 3,830.00 $ 122,560.00 $ 3,241.38 $ 103,724.16 $ 4,600.00 $ 147,200.00 21 Type"C"Modified Inlet 1 $ 5,200.00 $ 5,200.00 $ 5,500.00 $ 5,500.00 $ 3,127.67 $ 3,127.67 $ 6,500.00 $ 6,500.00 22 Type"C"Storrs Manhole 11 $ 3,600.00 $ 39,600.00 $ 4,800.00 $ 52,800.00 $ 4,401.06 $ 48,411.66 $ 5,000.00 $ 55,000.00 23 Grate Inlet - 2 $ 5,000.00 $ 10,000.00 $ 3,800.00 $ 7,600.00 $ 2,657.14 $ 5,314.28 $ 3,200.00 $ 6,400.00 24 Type"B"Curb Inlet _ 2 $ 5,100.00 $ 10,200.00 $ 3,600.00 $ 7,200.00 $ 3,659.00 $ 7,318.00 $ 4,600.00 $ 9,200.00 25 18-Inch RCP 750 $ 60.00 $ 45,000.00 $ 88.00 $ 66,000.00 $ 103.81 $ 77,857.50 $ 135.00 $ 101,250.00 26 24-Inch RCP 835 $ 70.00 $ 58,450.00 $ 108.00 $ 90,180.00 $ 113.57 $ 94,830.95 $ 142.00 $ 118,570.00 27 Concrete Curb&Gutter 1,050 $ 10.00 $ 10,500.00 $ 36.00 $ 37,800.00 $ 30.55 $ 32,077.50 $ 32.00 $ 33,600.00 28 Concrete Handicap Ramps 24 $ 3,000.00 $ 72,000.00 $ 2,500.00 $ 60,000.00 $ 1,327.94 $ 31,870.56 $ 2,100.00 $ 50,400.00 29 Concrete Sidewalks 300 $ 23.00 $ 6,900.00 $ 60.00 $ 18,000.00 $ 31.64 $ 9,492.00 $ 70.00 $ 21,000.00 30 Concrete Drive 350 $ 25.00 $ 8,750.00 $ 73.00 $ 25,550.00 $ 66.98 $ 23,443.00 $ 80.00 $ 28,000.00 31 Concrete Curb 200 $ 7.00 $ 1,400.00 $ 8.00 $ 1,600.00 $ 4.12 $ 824.00 $ 22.00 $ 4,400.00 32 Type"D"Hot Mix Asphalt 6,850 $ 15.00 $ 102,750.00 $ 39.00 $ 267,150.00 $ 46.66 $ 319,621.00 $ 25.00 $ 171,250.00 33 6-Inch Concrete Base 2,050 $ 75.00 $ 153,750.00 $ 79.00 $ 161,950.00 $ 45.85 $ 93,992.50 $ 115.00 $ 235,750.00 34 Inlet Protection 1 $ 2,000.00 $ 2,000.00 $ 2,500.00 $ 2,500.00 $ 1,315.89 $ 1,315.89 $ 15,000.00 $ 15,000.00 35 Remove Inlet Protection 1 $ 1,200.00 $ 1,200.00 $ 1,500.00 $ 1,500.00 $ 294.25 $ 294.25 $ 1,000.00 $ 1,000.00 36 Restore all Existing Signage 1 $ 3,000.00 _$ 3,000.00 $ 3,800.00 $ 3,800.00 $ 2,436.97 $ 2,436.97 $ 1,000.00 $ 1,000.00 37 Design of Trench Safety System 1 $ 1,500.00 $ 1,500.00 $ 1,500.00 $ 1,500.00 $ 1,294.70 $ 1,294.70 $ 1,000.00 $ 1,000.00 38 Trench Safety System,All Depths 1,540 $ 5.00 $ 7,700.00 $ 1.00 $ 1,540.00 $ 3.82 $ 5,882.80 $ 0.75 $ 1,155.00 39 Remove and Replace Guard Rail 1 $ 2,000.00 $ 2,000.00 $ 925.00 $ 925.00 $ 1,912.63 $ 1,912.63 $ 10,000.00 $ 10,000.00 40 Replace Asphalt Bike Trail 1 $ 2,000.00 $ 2,000.00 $ 2,750.00 $ 2,750.00 $ 2,976.43 $ 2,976.43 $ 7,000.00 $ 7,000.00 41 6"Thick Min.Flexible Base Ramps 1 $ 5,000.00 $ 5,000.00 $ 8,200.00 $ 8,200.00 $ 12,384.35 $ 12,384.35 $ 6,000.00 $ 6,000.00 Subtotal Base Bid Items $ 961,995.00 $ 1,236,164.00 $ 1,310,891.13 $ 1,666,760.00 Supplemental Items QTY. 42 Contingency Allowance 1 $ 37,000.00 I $ 37,000.00 $ 37,000.00 I $ 37,000.00 $ 37,000.00 $ 37,000.00 $ 37,000.00 $ 37,000.00 Subtotal Supplemental Items $ 37,000.00 $ 37,000.00 $ 37,000.00 $ 37,000.00 TOTAL AMOUNT BID $ 998,995.00 $ 1,273,164.00 $ 1,347,891.13 $ 1,703,760.00 ARCENEAUX WILSON & COLE LLC ..^^ '( ,.2 :,� TEXAS REGISTERED ENGINEERING FIRM r.�'�r'r 4�$1 r 1k °� 11; is t.� * 16194 * 1* I ee» �+`�f r�•KEESTAN X. COLE �0 � It 0040 ..�.... 1142225 n^ `: EESTAN C LE, E `4801gM.ar''�~