HomeMy WebLinkAboutPR 19796: CHANGE ORDER NO. 1 4TH STREET IMPROVEMENTS PROJECT ( (t r,r e,, -' ort rt 'C"' '"---........--- www.PortArthurTx.gov INTEROFFICE MEMORANDUM Date: May 26, 2017 To: The Honorable Mayor and City Council Through: Brian McDougal, City Manager From: Armando Gutierrez, Jr., P.E., Director of Public Works RE: P.R. 19796 —(CDBG) 4th Street Improvements Project, Change Order#1 Introduction: Acceptance of Change Order No. 1 for the 4th Street Improvements Project from Stadium Road to Duff Drive. Background: Proposed Change Order No. 1 is for implementing two (2) new bid items, Type "C" Inlet (3' x 6') and ninety-one linear feet (91') of fifteen inch (15") diameter High Density Polyethylene (HDPE) Pipe and increasing existing bid items associated with the installation of these new bid items. The project limits at the Duff Drive intersection ended at the beginning of the curb radius on 4th Street. During construction, it was discovered that the proposed concrete curb & gutter flowline would not match the existing curb & gutter flowline, maintaining continuity to the inlet at the end of curb radius. Also, the drainage system at the intersection needed to be reconstructed due to damaged storm sewer and inlets which caused flooding during rain events. Budget Impact: Funds are available in the following account: 105-1431-552.86-01 CDBG, Project No. 4THST1 "Remember,we are here to serve the Citizens of Port Arthur" P.O. Box 1089 x Port Arthur.Texas 77641-1089 x 409.983.8101 x FAX 409.982.6743 Recommendation: Since it was discovered that the proposed concrete curb & gutter flowline would not match the existing concrete curb & gutter flowline, maintaining continuity, damaged inlets and pipe, it is recommended that P. R. No. 19796 be approved authorizing the City Manager to execute Change Order No. 1 to the contract with Excavation and Construction Co., Inc. for the 4th Street Improvements Project increasing the contract amount by $26,929.70 to a new contract amount of $915,542.44 and increasing the contract term by 15 days to a new contract term of 165 days. "Remember. we are here to serve the Citizens of Port Arthus P.O.Box 1089 x Port Arthur,Texas 77641-1089 x 409.983.8101 x FAX 409.982.6743 P.R. 19796 06/01/17 rtb RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDER NO. 01 TO THE CONTRACT BETWEEN THE CITY OF PORT ARTHUR AND EXCAVATION AND CONSTRUCTION, LLC OF NEDERLAND, TEXAS FOR THE 4TH STREET IMPROVEMENTS PROJECT, INCREASING THE CONTRACT AMOUNT BY $26,929.70 TO A NEW CONTRACT AMOUNT OF $915,542.44 AND INCREASING THE CONTRACT TERM BY 15 DAYS TO A NEW TOTAL OF 165 DAYS. PROJECT NO. 4THST1, ACCOUNT NO. 105-1431- 552.86-01 CDBG. WHEREAS, per Resolution No. 16-351, the City Council awarded a contract for the 4th Street Improvements project from Stadium Road to Duff Drive to Excavation and Construction, LLC, of Port Arthur, Texas in the projected budgetary impact amount of $888,612.74 and a contract term of 150 calendar days; and, WHEREAS, proposed Change Order No. 01 is for two additional bid items, Type "C" Inlet (3' x 6') and ninety-one feet of 15 inch HDPE Pipe and increasing bid items including concrete curb & gutter and asphalt, increasing the contract price by $26,929.70 to a new contract amount of $915,542.44, and increasing the contract term by 15 days to a new contract term of 165 days, attached hereto as Exhibit "A"; and, WHEREAS, approval of Change Order No. 01 will increase the contract amount by $26,929.70 to a new total of $915,542.44 herein deemed an appropriate action; now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT, the facts and opinions in the preamble are true and correct; and, P. R. 19796 Page 2 THAT, Change Order No. 01 is herein approved and the City Manager is authorized to execute said Change Order No. 01 (attached as Exhibit "A") to the contract between the City of Port Arthur and Excavation and Construction, LLC, of Port Arthur, Texas; and, THAT, Change Order No. 01 increases the contract amount by $26,929.70 to new contract amount of $915,542.44 and increases the contract term by 15 days to a new total of 165 days; and, THAT, a copy of the caption of this Resolution No. be spread upon the Minutes of the City Council. READ, ADOPTED AND APPROVED this the day of , A.D. 2017 at a meeting of the City of Port Arthur, Texas by the following vote: Ayes: Mayor: Council members: Noes: Derrick Ford Freeman Mayor Attest: City Secretary Sherri Bellard P.R. 19796 Page 3 APPROVED AS TO FORM: APPROVED FOR ADMINISTRATION: \ICJ ,)4.7)Thrl/ Valecia Tizeno Brian McDougal City Attorney City Manager APPROVED AS FOR AVAILABILITY OF FUNDS: Rosie Vela, CPA/GFOA-Cc2 Fo Interim Director of Finance Armando Gutierrez, Jr., P.E. Director of Publt Works C i on Williams, CPPB Acting Purchasing Manager EXHIBIT A CHANGE ORDER NO. 01 DATE: May 17,2017 ORIGINAL AGREEMENT DATE: February 6, 2017 EXCAVATION AND CONSTRUCTION,LLC PROJECT DESCRIPTION: 4th Street Improvements (Stadium Road to Duff Drive) CHANGE TO CONTRACT TERM: ORIGINAL CONTRACT term: 150 Days CURRENT CONTRACT TERM (adjusted by previous CHANGE ORDER): N/A The Contract Term due to this CHANGE ORDER will be (increased/decreased) by: 15 Days The new CONTRACT TERM including the CHANGE ORDER will be: 165 Days CHANGE TO CONTRACT AMOUNT: ORIGINAL CONTRACT amount: $888,612.74 CURRENT CONTRACT PRICE (adjusted by previous CHANGE ORDER): N/A The Contract Amount due to this CHANGE ORDER will be (increased/decreased)by: $26,929.70 The new CONTRACT AMOUNT including the CHANGE ORDER will be: $915,542.44 Excavation and Construction, Co., Inc.: Signature Eric Gilchriest - General Manager Printed Name CITY OF PORT ARTHUR Brian McDougal City Manager CITY OF PORT ARTHUR DATE: 18 MAY 2017 PROJECT: 4th STREET IMPROVEMENTS(STADIUM RD.TO DUFF DR.) OWNER: CITY OF PORT ARTHUR CONTRACTOR: EXCAVATION AND CONSTRUCTION,LLC. CHANGE ORDER NO.: 01 THE FOLLOWING CHANGES IN THE PLANS AND/OR SPECIFICATIONS ARE HEREBY MADE: Add/Deduct Construction Items and/or quantities to the Contract: Item Item Original New Unit No. Code Description Unit Quantity Quantity Difference Amount Price PAVING AND DRAINAGE ADDITION: 3 105 REMOVE&DISPOSE EXIST CURB LF 4840 4902.00 62.00 $9.93 $615.66 7 340 DENSE GRADED HOT MIX ASPH(1-1/2")(TY D) SY 6300 6588.00 288.00 $13.28 $3,824.64 8 529 FURNISH&INSTL CURB&GUTTER LF 4840 4902.00 62.00 $24.40 $1,512.80 10 465 CONNECT ANY SIZE PIPE TO PROP.OR EXIST.INLETS EA 12 13.00 1.00 $575.00 $575.00 11 465 FURNISH&INSTALL STD.TY C INLETS EA 11 14.00 3.00 $3,565.00 $10,695.00 11A 465 FURNISH&INSTALL STD.TY C INLETS(3'x6'Inside) EA - 1.00 1.00 $4,500.00 $4,500.00 (Sta 23+10 RT)(Incl Pipe Tie-ins)(Comp in P1) 12A 464 15"HDPE PIPE,INCL.CEM STAB SAND BKFL)(1-1/2 SK/CY) LF - 91.00 91.00 S42.84 $3,898.44 20 400 CEM STAB SAND BKFL(1-1/2 SK/CY) CY 300 307.00 7.00 S186.88 $1,308.16 TOTAL AMOUNT ADDED $26,929.70 CHANGE ORDER TOTAL AMOUNT ADDED $26,929.70 NOTE: ALL ITEMS SHALL BE IN ACCORDANCE WITH PLANS&SPECIFICATIONS ORIGINAL CONTRACT AMOUNT: $888,612.74 NET FROM PREVIOUS CHANGE ORDERS: $0.00 TOTAL AMOUNT OF THIS CHANGE ORDER: $26,929.70 PERCENT OF THIS CHANGE ORDER: 3.03% TOTAL PERCENT CHANGE ORDER TO DATE: 3.03% NEW CONTRACT AMOUNT: $915,542.44 15 CALENDAR DAY. HAVE BEEN ADDED IN THE CONTRACT BY THIS CHANGE ORDER ACCEPTED BY: ry PREPARED BY• i (Co actor,Officer or Owner) ' • FAEL G.MIRAND EXCAVATION&CONSTRUCTION, PROJECT MANAGER LLC ...."APPROVED BY4� - 0,zsd / / / ._4e.,ARMANDO GU IERREZ,P.E. RAWETTS T.i.:AAHETH,SR., .I.T. /CO PUBLIC WORKS DIRECTOR ASST.CITY ENGINEER ATTEST D BY: t,, I'1, y BRIAN McDOUGAL CLIFTON WILLIAMS,CPPB CITY MANAGER ACTING PURCHASING MANAGER