HomeMy WebLinkAboutPR 19916: EMERGENCY EVALUATION, INSPECTIONS AND SITE ASSESSMENT OF SANITARY SEWER LIFT City of 4)lelz Tet'nc INTEROFFICE MEMORANDUM Date: September 21, 2017 To: The Honorable Mayor and City Council Through: Brian McDougal, City Manager From: Jimmie Johnson, Ph.D., Assistant City Manager RE: PR 19916—Emergency Evaluation, Inspection, and Site Assessment of Sanitary Sewer Electrical Control Panels and SCADA system Introduction: The intent of this Agenda Item is to seek the City Council approve PR No. 19916 enabling the City Manager to enter into a contract with Epic Engineering, of Orange, Texas, for the evaluation, inspection,and site assessments of all 57 sewer lift station control panels and SCADA system. Background: Due to the massive flood caused by Hurricane Harvey, all of our sanitary lift station control panels are believed to have varying amounts of water damage. This damage has already begun showing in lift station control panels as failures. When a lift station control panel fails, pumps cannot turn on and the sewer begins backing up into the collection system, eventually resulting in sanitary sewer overflows. These sewer overflows present a major health hazard. The evaluation will produce a scope of work and repairs necessary, as well as a ranking of damages to each station's electrical system. This is an emergency request needed to protect the public health and safety of our citizen due poor sanitation. Budget Impact: This is an emergency request. The evaluation is directly related to Hurricane Harvey. The evaluation is estimated to cost$175,000 and will be charged to the account#147-2300-901.54-00. "Remember,we are here to serve the Citizens of Port Arthur" P. R. No. 19916 09/21/17 ds/ht RESOLUTION NO. A RESOLUTION AUTHORIZING THE EVALUATION, INSPECTION, AND SITE ASSESSMENT OF SANITARY SEWER LIFT STATION CONTROL PANELS AND SCADA SYSTEM IN ALL 57 STATIONS BY EPIC ENGINEERING, OF ORANGE, TEXAS FOR THE PROJECTED BUDGETARY IMPACT AMOUNT OF $175,000.00; FUNDS AVAILABLE IN HURRICANE ACCOUNT NO. 147-2300-901.54-00, CONTRACT #082617. WHEREAS, the Utility Operations Department maintains and operates and maintains 57 sanitary lift stations at various locations all over the city of Port Arthur for the collection and conveyance of sanitary sewer; and, WHEREAS, Hurricane Harvey caused flooding throughout the City at such a level that the control panels of these lift stations were partially submerged, making eventual failure imminent; and, WHEREAS,pursuant to Section 252.022(a)(2)of the Texas Local Government Code,this procurement is authorized because of the public calamity that requires the immediate appropriation of money to relieve the necessity of the municipality's residents or to preserve the property of the municipality; and, WHEREAS, is it further authorized pursuant to Section 252.022(a)(3) because of unforeseen damage to public machinery, equipment, or property; and, WHEREAS, an Evaluation, Inspection, and Site Assessment of Sanitary Sewer Lift Station Electrical Control Panels and SCADA system by a qualified Electrical Engineer is the first step toward rehabilitation of the lift stations and insuring their continuous operation, thereby protecting public health and safety; and P. R. No. 19916 09/21/17 ds/ht WHEREAS, Epic Engineering, of Orange, Texas is an electrical engineering firm with proven lift station controls and SCADA experience that submitted an estimated cost of $175,000.00; NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT,the facts and opinions in the preamble are true and correct; and, THAT,in order to protect the health and safety of our citizens,the City Council of the City of Port Arthur is hereby authorized the contract, in substantially the same form attached hereto as Exhibit "A", between the City of Port Arthur and Epic Engineering, of Orange, TX, with a projected budgetary impact of$175,000.00, for the Evaluation, Inspection, and Site Assessment of Sanitary Sewer Lift Stations Electrical Control Panels and SCADA system; and, THAT, the City can terminate this contract at its convenience with ten (10) days written notice; and, THAT a copy of the caption of this resolution be spread upon the minutes of the City Council. READ,ADOPTED AND APPROVED THIS day of , 2017 at a Regular Meeting of the City Council of the City of Port Arthur, Texas, by the following vote: AYES: Mayor ; Councilmembers: NOES: P. R. No. 19916 09/21/17 ds/ht Mayor Derrick Freeman ATTEST: APPROVED FOR ADMINISTRATION: Sherri Bellard, City Secretary Brian McDougal, City Manager Jimmie Johnson, Ph.D. APPROVED AS TO FORM: Vt;rq) e)/L--(1-(A,Ae Valecia Tize o, City Attorney APPROVED AS TO AVAILABILITY OF FUNDS: 1 Rosie Vela Clifton Williams, Director of Finance Purchasing Manager P. R. No. 19916 09/21/17 ds/ht Exhibit "A" (Professional Services Contract) (Will be presented at or before the Council Meeting)