HomeMy WebLinkAboutPR 19992: TEXAS COMMISSION ON ENVIRONMENTAL QUALITY, FEES/PERMITS City of
ort rthu
Texas
INTEROFFICE MEMORANDUM
DATE: November 13, 2017
TO: The Honorable Mayor and City Council
THROUGH: Brian McDougal, City Manager
FROM: Jimmie Johnson, Ph.D., Assistant City Manager
RE: PR 19992 --Texas Commission on Environmental Quality, Fees/Permits
Introduction:
The intent of this Agenda Item is to obtain City Council's support for City Manager to approve payment
to Texas Commission on Environmental Quality,totaling$95,227.11 for permit fees pertaining to City
of Port Arthur Main Wastewater Treatment Plant ($74,307.10/Invoice # CWQ0053044), Port Acres
WWTP and Sabine Pass WWTP ($20,920.01/Invoices CWQ0053046 and CWQ0053045).
Background:
Senate Bill 818 requires a comprehensive water quality assessment(evaluation) in each river basin in
Texas(Texas Water Code§26.0135). Senate Bill 818 requires the TCEQ to recover the reasonable costs
of the assessment program from wastewater and water use permit holders. City of Port Arthur holds
three(3)permits--for the Main,Port Acres,and Sabine Pass Sewer WWTP.The permitted daily average
flow and maximum pollutant loading are used as the basis for calculating these fees.
Budget Impact:
Funds are budgeted and available in the Utility Operations Department,Wastewater Treatment Division,
Account No. 410-1256-532.59-01. [Staff is not affected.]
Recommendation:
It is recommended that City Council approve P.R.No. 19992, which approves payment of these State
mandated fees, as billed by TCEQ.
"Remember, we are here to serve the Citizens of Port Arthur"
P.R. No. 19992
11/13/17 to
RESOLUTION NO.
A RESOLUTION APPROVING PAYMENT IN THE
NOT TO EXCEED AMOUNT OF$95,227.11 FOR THE
TCEQ ANNUAL CONSOLIDATED WATER QUALITY
ASSESSMENT FEES FOR ALL THREE (3)
WASTEWATER TREATMENT FACILITIES IN THE
CITY OF PORT ARTHUR. UTILITY OPERATIONS
DEPARTMENT, WASTEWATER TREATMENT
DIVISION,ACCOUNT NO. 410-1256-532.59-01.
WHEREAS,the Texas Commission on Environmental Quality(TCEQ),in accordance
with Section 26.0135 of the Texas Water Code, requires a comprehensive water quality
assessment(evaluation)in each river basin in Texas. Section 26.0135 of the Texas Water Code
requires TCEQ to recover the reasonable costs of the assessment program from wastewater
permit and water use permit holders. This fee is based on the permitted flow limits (daily
average flow)and traditional pollutant limits,without regard to the actual amount or quality of
any discharge for the permitted facility. This total fee also consolidates the annual wastewater
inspection fees. The total fee (Exhibit A) is $95,227.11 for all three (3) wastewater treatment
facilities in the City of Port Arthur; and,
WHEREAS, the Mayor and City Council of the City of Port Arthur are requested to
authorize payment of funds for the Consolidated Water Quality Assessment Fees totaling
$95,227.11, payable to Texas Commission on Environmental Quality(TCEQ), as billed;
NOW THEREFORE,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR:
THAT,the facts and opinions in the preamble are true and correct; and,
THAT, the Mayor and City Council approve payment for a total of $95,227.11 as
required by the Texas Commission on Environmental Quality(TCEQ)as delineated in Exhibit
"A"; and,
P. R. No. 19992
11/13/2014 to
Page 2 of 3
THAT a copy of the caption of this resolution be spread upon the minutes of the City
Council.
READ, ADOPTED, AND APPROVED THIS day of A.D.,
2017 at a Regular Meeting of the City Council of the City of Port Arthur,Texas,by the following vote:
AYES: Mayor
Councilmembers:
NOES:
Derrick Freeman
Mayor
ATTEST:
Sherri Bellard
City Secretary
APPROVED AS TO FORM:
t ' AleriA
v. Tizeno W `i
City Attorney ,
APPROVED FOR ADMINISTRATION:
Brian McDougal
City Manager
P. R. No. 19992
11/13/2014 to
Page 3 of 3
Jimmie Johnson, Ph.D.
Asst. City Manager
APPROVED FOR THE AVALABILITY OF FUNDS:
Cli 'en Williams, CPPB
Purchasing Manager
(,..2... : y,/
Andrew asquez, C A
Director of Finance
EXHIBIT A
(Invoice& Fee Assessments for Main, Port Acres, and Sabine Pass Plants)
TEXAS COMMISSION ON INVOICE COMPANY: CITY OF PORT ARTHUR
`= ENVIRONMENTAL QUALITY ACCOUNT: 23006479
DETACH BOTTOM PORTION AND RETURN ORIGINAL COUPON WITH PAYMENT PAGE 1
ACCOUNT NO. INCLUDES PAYMENTS THROUGH: COLL COST RECOVERY LATE FEES BALANCE DUE
23006479 OCT11 ,17 0.00 0.00 74,307.10
INVOICE DATE INVOICE NO. DESCRIPTION AMOUNT BALANCE
OCT31 , 17 CWQ0053044 PERMIT 0010364001 FY18 74,307. 10 74,307. 10
PERMIT
, 61
= CITY Or PORT A:-
f"(
:-
f`r OPERA
RECEIVES W4TrR/SEV
UTtLtTY OPERAi)I
OCT 3 1 i7
R
NOV 2 7017 Admin.-CityHTIaH ECEIe P
SERVICE CEN=H-'� ,s
UTILITY OPERATIONS
Admin.-City Hall
Please return the original coupon with payment. For questions concerning 74,307.10
calculations or site location, please call 512-239-4671 .
See REVERSE SIDE for Explanation of Charges and TCEQ Contact Telephone Numbers. PLEASE PAY THIS AMOUNT T T t
INCLUDE ACCOUNT NUMBER ON CHECK
TCEQ VIPP Form AR41A 02-17-2011
OCT1 1 , 17 ACCOUNT NO. BALANCE DUE
DETACH THIS PORTION AND RETURN WITH
CHECK OR MONEY ORDER PAYABLE TO: 23006479 74,307. 10
TEXAS COMMISSION ON CHECK HERE IF YOUR ADDRESS HAS CHANGED.
ENVIRONMENTAL QUALITY PLEASE INDICATE ADDRESS CHANGE ON BACK
INVOICES NOT PAID WITHIN
30 DAYS OF INVOICE DATE WILL
ACCRUE PENALTIES
CITY OF PORT ARTHUR
LUCY LANE/DONALD STANTON-UTL
PO BOX 1089
0023006479 1533360 00074307101130171
PORT ARTHUR TX 77641 -1089
PAYMENT INFORMATION
► I INVOICES NOT PAID BY DUE DATE WILL ACCRUE PENALTIES I
DETACH PAYMENT COUPON FROM BOTTOM OF FORM AND RETURN WITH PAYMENT IN THE ENVELOPE ENCLOSED.
Your check,certified check or money order should be made payable to the Texas Commission on Environmental Quality. Please include your
account number on your check to ensure that payment is properly credited.You may also pay this account in full by credit card or electronic check
using the following internet address: www.tceq.texas.gov/epay/
If you think your billing is wrong,or if you need more information about a transaction,please address your questions to:
Texas Commission on Environmental Quality
Financial Administration Division,MC-214
P.O.Box 13088
Austin,Texas 78711-3088
In your correspondence,please give us the following information:
1.Your name and account number 3.The date and reference number of the transaction(s)in question
2.The dollar amount of the suspected error 4.Description of the suspected error
The payment due date is 30 days from the invoice date.Penalty and interest charges assessed will be adjusted for fees not due.Failure to
pay by the due date may result in return or denial of applications for licenses,permits,registrations, and certifications.
*** For technical questions,please call the telephone number on the front of bill.For accounting questions,please call: ***
Petroleum Storage Tank Fees (UST&AST) 512/239-0366
(VCP,ILP,RLA,FTA) 512/239-0548
(HW G,NWG,HWF,NWF) 512/239-0343
Waste Fees (SWD,WMS,SWM) 512/239-0366
(WMB,BLP,SDP,WTR) 512/239-0366
(TOX) 512/239-0366
(GPS,GPW,PHS) 512/239-0355
Water Fees (BWM,CRW,RGR,STX) 512/239-0355
(CWQ,WQA,WWI,WWIR,EAP) 512/239-0355
(WUF) 512/239-0366
Air Fees (AEF,EIF) 512/239-0366
Admin Penalties (CAV,DCP,WDV,WQV,QWV) 512/239-0548
Dry Cleaning Fees (DCR) 512/239-0343
TCEQ VIPP FORM AR41A1 02-17-2011
EXPLANATION OF CHARGES
The basis for each charge is identified by the facility,permit,application or other appropriate activity. The state fiscal year(FY)and the quarter of the
year(QTR)to which the payment will be credited are shown where applicable. Delinquent fees are subject to a penalty of 5%per month for the first
two months after the due date,after which an interest charge for CY 2017 of 4.75%per annum will be assessed. Delinquent administrative penalties
are assessed interest charges at a rate of 6%per annum beginning 30 days after the due date.
In accordance with Government Code 2107.003(d),collection costs up to 30%may be assessed.
TCEQ understands the account party may be a debtor in a pending bankruptcy proceeding.The portion of this invoice,if any,that represents pre-petition
fees due is sent for informational purposes only and is not an attempt to recover a claim against the debtor.TCEQ will file an appropriate proof of claim
with the bankruptcy court for such pre-petition fees.Any post-petition fees due and owing as shown on this invoice should be paid in accordance with
this invoice.
IMPORTANT: TO CHANGE A PLEASE INDICATE BILLING ADDRESS CHANGE BELOW
BILLING ADDRESS FOR A GPS
OR GPW FEE(SEE INVOICE Address:
DESCRIPTION ON FRONT SIDE),
CALL 512/239-4671 FOR GPW& City:
CALL 512/239-3700 OR EMAIL
SWPERMIT@TCEQ.TEXAS.GOV State&Zip Code:
FOR GPS
Phone: ( ) FAX:
( Note:TO CHANGE ACCOUNT NAME,
( A CORE DATA FORM MUST BE SUBMITTED.)
TEXAS COMMISSION ON
ENVIRONMENTAL QUALITY
PO BOX 13089
AUSTIN TX 78711-3089
1111111111.1111111.11111111111.11111111111111111111111111.1111
AP-
Account
Account Receivable No.: 23006479
Billing Customer: CITY OF PORT ARTHUR
Permit/Registration No.: WQoo1o364001
Customer Name: CITY OF PORT ARTHUR
Facility/Site Name: CITY OF PORT ARTHUR MAIN WWTP
Authorization Type: PUB DOM WW
Flow:
Sum of Contaminated Flow Limit: 9.2
Sum of Uncontaminated Flow Limit: 0
Total Flow Assessment: $7820
Pollutants:
Sum of Oxygen Demand(lbs/day): 1535
Sum of Suspended Solids (lbs/day): 1535
Sum of Ammonia(lbs/day): o
Sum of Heat (temperature): o
Total Pollutants Fee Assessment: $46050
Facility Indicators used to determine the total assessment:
Aquaculture: NO
Stormwater Only: NO 0
Stormwater Fee: NO o
EPA Facility Classification: MAJOR 2000
Facility Toxic Rating:
Facility Disposal Method: DISCHARGE 0% Reduction ?..,
Facility Operational Status: ACTIVE o% Reduction
Multiplier: 1.33
Total Permit Fee: $74307.1
Extension data used to determine the fee assessment:
Extension Name Uncontam Flow Contam Flow Oxygen Demand TSS Ammonia Heat
0 0 0 0 0 0
12428 OTFL 001 TPDES o 9.2 1535 1535 0 0
Total Assessment: $74307.1
2662
Fro m:G=rayson Armature Works 409 882 9287 10/05/2017 09:-11 #231 P-004/004
• Balance rotor
• Reassemble motor using customer furnished bearings nd seals
• Record final megger test on stator windings
• Bolt motor to a vibration-isolated test bed for testing
• Test run motor at full voltage - Observe and document thecllowing:
• Phase current
• Voltage
• RPM and rotation
• Vibration at both bearing hcsusurrgs in the horizontal, verticz and axial planes
• Bearing temperatures
• Spray paint exterior of motor and prepare motor for shipment
• Transport motor to customer site
• Provide report of inspections and tests
Additional work scope:
Replace bearings with new
Straight Time Repair Price — $3,719.00
Delivery — 7 to8 working days ARO
Overtime Repair Price -- $5,052.00
Delivery— 5 to 6 days ARO
In the event that any additional electrical and/or mechanical defects ar- discovered
during the course of repairs, these repairs will be quoted in addition to the above quoted
price.
Thank you for the opportunity to quote these repairs. I look forward to favorable
response and would welcome the opportunity to work with you on thee' motors. If I can
be of further service, please call. t!
Sincerely,
Sandy Jones
409-882-9112
GRAYsti ti
This propos-al is made i}'4 accord rrce with' =.utts'r`3,ayS0il'iris�5'i e i rrm:anti Conditions ;•'-
1
/ q1? z
WWI
E = TEXAS COMMISSION ONINVOICE\ /O' COMPANY: CITY OF PORT ARTHUR
1111116,4* ENVIRONMENTAL QUALITY V ACCOUNT: 23001924
DETACH BOTTOM PORTION AND RETURN ORIGINAL COUPON WITH PAYMENT PAGE 1
ACCOUN r NO. INCLUDES PAYMENTS THROUGH: COLL COST RECOVERY LATE FEES BALANCE DUE
23001924 OCT11 ,17 0.00 0.00 20,920.01
INVOICE DATE INVOICE NO. DESCRIPTION AMOUNT BALANCE
OCT31 , 17 CWQ0053046 PERMIT 0010364010 FY18 2, 335 . 75 2,335.75
PERMIT
OCT31 , 17 CW00053045 PERMIT 0010364002 FY18 18,584.26 20,920.01
PERMIT
•
RECEIVED
OCT 2 5 2-7
I,
UTILITY OPERATIONS 1.00-
Admin.-City Hao
CITY OF PORTA, 7"-.
UTILITY OPEFATIONS
RECEIVED WATER/ -r
OCT 2 6 2017
RECEIVED
SERVICE C71\11 _R
UTILITY OPERATIONS
Admin.-City Hall
Please return the original coupon with payment. For questions concerning 20,920.01
calculations or site location, please call 512-239-4671 .
LeLIEZRSE SIDE for Explanation of Charges and TCEQ Contact Telephone Numbers. I
PLEASE PAY THIS AMOUNT T t?
iNCLU)E ACCOU:"'T NUMBER ON CHECK
TCEQ VIPP Form AR41A 02-17-2011
OCT1 1 , 17 ACCOUNT NO. BALANCE DUE
DETACH THIS PORTION AND RETURN WITH
CHECK OR MONEY ORDER PAYABLE TO: 23001924 20,920. 01
TEXAS COMMISSION ON 111CHECK HERE IF YOUR ADDRESS HAS CHANGED.
ENVIRONMENTAL QUALITY PLEASE INDICATE ADDRESS CHANGE ON BACK
`. INVOICES NOT PAID WITHIN
30 DAYS OF INVOICE DATE WILL
ACCRUE PENALTIES
CITY OF PORT ARTHUR
PO BOX 1089
0023001924 1533360 00020920011130177
PORT ARTHUR TX 77641 -1089
PAYMENT INFORMATION
I I INVOICES NOT PAID BY DUE DATE WILL ACCRUE PENALTIES I
DETACH PAYMENT COUPON FROM BOTTOM OF FORM AND RETURN WITH PAYMENT IN THE ENVELOPE ENCLOSED.
Your check,certified check or money order should be made payable to the Texas Commission on Environmental Quality.Please include your
account number on your check to ensure that payment is properly credited.You may also pay this account in full by credit card orralectronic,check
using the following internet address: www.tceq.texas.gov/epay/
If you think your billing is wrong,or if you need more information about a transaction,please address your questions to: '!
Texas Commission on Environmental Quality
Financial Administration Division,MC-214
P.O.Box 13088
Austin,Texas 78711-3088
In your correspondence,please give us the following information:
1.Your name and account number 3.The date and reference number of the transaction(s)in question
2.The dollar amount of the suspected error 4.Description of the suspected error
The payment due date is 30 days from the invoice date.Penalty and interest charges assessed will be adjusted for fees not due.Failure to
pay by the due date may result in return or denial of applications for licenses,permits,registrations, and certifications.
*** For technical questions,please call the telephone number on the front of bill.For accounting questions,please call: ***
Petroleum Storage Tank Fees (UST&AST) 512/239-0366
(VCP,ILP,RLA,FTA) 512/239-0548
(HWG,NWG,HWF,NWF) 512/239-0343
Waste Fees (SWD,WMS,SWM) 512/239-0366
(WMB,BLP,SDP,WTR) 512/239-0366
(TOX) 512/239-0366
(GPS,GPW,PHS) 512/239-0355
Water Fees (BWM,CRW,RGR,STX) 512/239-0355
(CWQ,WQA,WWI,WWIR,EAP) 512/239-0355
(W U F) 512/239-0366
Air Fees (AEF,EIF) 512/239-0366
Admin Penalties (CAV,DCP,WDV,WQV,QWV) 512/239-0548
Dry Cleaning Fees (DCR) 512/239-0343
TCEQ VIPP FORM AR41A1 02-17-2011
EXPLANATION OF CHARGES
The basis for each charge is identified by the facility,permit,application or other appropriate activity. The state fiscal year(FY)and the quarter of the
year(QTR)to which the payment will be credited are shown where applicable. Delinquent fees are subject to a penalty of 5%per month for the first
two months after the due date,after which an interest charge for CY 2017 of 4.75%per annum will be assessed. Delinquent administrative penalties
are assessed interest charges at a rate of 6%per annum beginning 30 days after the due date.
In accordance with Government Code 2107.003(d),collection costs up to 30%may be assessed.
TCEQ understands the account party may be a debtor in a pending bankruptcy proceeding.The portion of this invoice,if any,that represents pre-petition
fees due is sent for informational purposes only and is not an attempt to recover a claim against the debtor.TCEQ will file an appropriate proof of claim
with the bankruptcy court for such pre-petition fees.Any post-petition fees due and owing as shown on this invoice should be paid in accordance with
this invoice.
IMPORTANT: TO CHANGE A PLEASE INDICATE BILLING ADDRESS CHANGE BELOW
BILLING ADDRESS FOR A GPS
OR GPW FEE(SEE INVOICE Address:
DESCRIPTION ON FRONT SIDE),
CALL 512/239-4671 FOR GPW& City:
CALL 512/239-3700 OR EMAIL
SWPERMIT@TCEQ.TEXAS.GOV State&Zip Code:
FOR GPS
Phone: ( ) FAX:
( Note:TO CHANGE ACCOUNT NAME,
( A CORE DATA FORM MUST BE SUBMITTED.)
TEXAS COMMISSION ON
ENVIRONMENTAL QUALITY
PO BOX 13089
AUSTIN TX 78711-3089
IIIIIIIIII11.11I1111111111111111111111111111111.11111111111111
Account Receivable No.: 23001924
Billing Cusiomer:1CITY OF PORT ARTHUR
Permit/Registration No.: WQoo10364002
Customer Name: CITY OF PORT ARTHUR
Facility/Site Name: PORT ACRES WWTP
Authorization Type: PUB DOM WW
Flow:
Sum of Contaminated Flow Limit: 2.75
Sum of Uncontaminated Flow Limit: o
Total Flow Assessment: $2337.5
Pollutants:
Sum of Oxygen Demand (lbs/day): 229.35
Sum of Suspended Solids (lbs/day): 344.02533
Sum of Ammonia (lbs/day): 69
Sum of Heat(temperature): o
Total Pollutants Fee Assessment: $9635.63
Facility Indicators used to determine the total assessment:
Aquaculture: NO
Stormwater Only: NO o
CITY OF PORT,lF2Tt MLR
Stormwater Fee: NO 0 UTILITY OPERATIONS
EPA Facility Classification: MAJOR 2000 WATER/SEWER
Facility Toxic Rating: o 0 OCT 2 6 2017
Facility Disposal Method: DISCHARGE o% Reduction
Facility Operational Status: ACTIVE o% Reduction RECEIVED
Multiplier: 1.33 SERVICE CENTER
Total Permit Fee: $18584.26
Extension data used to determine the fee assessment:
Extension Name Uncontam Flow Contam Flow Oxygen Demand TSS Ammonia Heat
0 0 0 0 0 0
12221 OTFL 001 TPDES o 2.75 229.35 344.02533 69 0
Total Assessment: $18584.26
530
Account Receivable No.: 23001924
Billing Customer? CITY OF PORT ARTHUR
Permit/Registration No.: WQoo10364010
Customer Name: CITY OF PORT ARTHUR
Facility/Site Name: SABINE PASS WWTP
Authorization Type: PUB DOM WW
Flow:
Sum of Contaminated Flow Limit: 0.3
Sum of Uncontaminated Flow Limit: o
Total Flow Assessment: $255
Pollutants:
Sum of Oxygen Demand(lbs/day): 50.04
Sum of Suspended Solids (lbs/day): 50.04
Sum of Ammonia (lbs/day): o
Sum of Heat(temperature): o
Total Pollutants Fee Assessment: $1501.2
Facility Indicators used to determine the total assessment:
Aquaculture: NO
Stormwater Only: NO o
Stormwater Fee: NO o CITY
EPA Facility Classification: MINOR o tmLINO,Rra•Rta.it.ip,
e
j3'�Qv
.
wATEh?�
Facility Toxic Rating: o o srlivE
Facility Disposal Method: DISCHARGE o% Reduction OCT 2 6
Facility Operational Status: ACTIVE o% Reduction 2017
Multiplier: 1.33 RECE!VEE
Total Permit Fee: $2335.75 SERA/ CENTEr
Extension data used to determine the fee assessment:
Extension Name Uncontam Flow Contam Flow Oxygen Demand TSS Ammonia Heat
0 0 0 0 0 0
12709 OTFL 001 TPDES 0 0.3 50.04 50.04 0 0
Total Assessment: $2335.75
531
1:11X Ur YVK1 HttLr1UX tv.Lo—cv i uvLaa:.i
DETAIL EXPENDITURES - BY DIVISION
ADOPTED
ACCOUNT NUMBER ACCOUNT DESCRIPTION 16-17
ADPT PHOTO EDITING (2 COMPUTERS) 500
500
Mt-1256-532.59-01 REGULATORY FEES 90,9 t J30 4 Over
LEVEL TEXT Ti XT AMT
ADPT MAIN PLANT, PORT ACRES, AND SABINE REG FEES 90, 923
90, 923
410-1256-532.61-01 ELECTRICITY 290, 000
LEVEL TEXT Ti XT AMT
ADPT MAIN PLANT, PORT ACRES, AND SABINE ELECTRICAL BILL 290, 000
290, 000
410-1256-532 .61-03 COMMUNICATIONS 6, 000
LEVEL TEXT IXT AMT
ADPT AT&T PHONE, VERIZON PHONE, VERIZON HOTSPOT 6, 000
6, 000
* Contractual Services 490, 923
410-1256-532 .92-00 EQUIPMENT 333, 800
LEVEL TEXT EXT AMT
ADPT URGENT REBUILD OF PORT ACRES CENTRIFUGE 60, 000
REBUILD M.P. TRICKLING FILTER PUMPS (2) 30, 000
SUPPLIES NEEDED TO RESTART ONSITE LABORATORY
INCLUDING N.E.L.A.C. ACCREDITATION AND LAB TECH 70, 000
MAIN DRIVE MOTOR FOR M.P. CENTRIFUGE 8,200
ROTATING ASSYMBLY FOR M.P. CENTRIFUGE (SPARE) 190, 000
FORD DUMP TRUCK-FREIGHTLINER 12YD (REPLACE #1405) 99, 600
FORD F150 (REPLACE #1428) 26, 000
BOTH UNITS ARE COSTING A GREAT DEAL OF REPAIR
EXPENSE AND DOWNTIME. BOTH ARE 2001 MODEL
CM DECISION - REDUCTION. 150, 000-
333, 800
* Capital Outlay 333,800
** WASTEWATER TREATMENT 2,229,305