INTEROFFICE MEMORANDUM
Date: February 15, 2018
To: The Honorable Mayor and City Council
Through: Harvey Robinson, Interim City Manager
From: Larry D. Richard, Fire Chief
RE: PR 20120, HVAC Station 8 and Station 5 Harvey Repair
Introduction:
The intent of this Agenda Item is to seek the City Council's approval of Proposed Resolution
20120 authorizing the repair and replacement of the HVAC Systems at Fire Station Number 5
and Fire Station Number 8 by CAT 5 Resources located in Nederland, Texas in the amount of
$39,257.18.
Background:
Fire Stations 8 and 5 suffered damage from the flooding associated with Hurricane Harvey.
The HVAC systems including some of the ductwork will need to be replaced. The cost for
Fire Station 5 is $15,229.68 and Fire Station 8 is $24,027.50. The City has received funds to
settle the claim for building damage from NFIP in the amount of$230,669.87 for Fire Station
Number 5 and$246,362.69 for Fire Station Number 8, an additional $40,000 per fire station
was received for contents. The Purchasing and Fire Department contacted several vendors
with two responsive quotes. CAT 5 was the lowest and best responsive quote.
Budget Impact:
Funds available in Hurricane Harvey Account No. 147-2300-901.32-00, Project 082617.
Recommendation:
The Fire Department recommends approval of this resolution.
"Remember,we are here to serve the Citizens of Port Arthur"
P.O.Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8101 X FAX 409.982.6743
P.R. No. 20120
2/15/18 ldr
RESOLUTION NO.
A RESOLUTION AUTHORIZING THE REPAIR AND REPLACEMENT
OF THE HVAC SYSTEMS AT FIRE STATION NUMBER 5 AND
FIRE STATION NUMBER 8 FROM CAT 5 RESOURCES OF
NEDERLAND, TEXAS, IN THE AMOUNT OF $39, 257 . 18;
FUNDING AVAILABLE IN HURRICANE HARVEY ACCOUNT NO.
147-2300-901. 32-00, PROJECT 082617
WHEREAS, the Fire Department' s Fire Stations Number 8
and 5 received extensive damage due to flooding associated
with Hurricane Harvey; and
WHEREAS, NFIP has settled the claim for Fire Station
Number 8 ' s building damage for $246 , 362 . 69 plus $40 , 000 for
contents; and
WHEREAS, National Flood Insurance Protection (NFIP) has
settled the claim for Fire Station Number 5 ' s building damage
for $230, 669 . 87 plus $40 , 000 for contents; and
WHEREAS, the Fire Department and Purchasing Department
solicited quotes from numerous vendors and received two
responsive quotes; and
WHEREAS, CAT 5 Resources of Nederland, Texas was the
lowest responsive quote (see Quote Tabulation attached hereto
as Exhibit "A" ) ; and
WHEREAS, a copy of the quote is attached as Exhibit "B" ;
and
WHEREAS, funds are available for this purchase in
Hurricane Harvey Account Number 147-2300-901 . 32-00, Project
082617 .
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF PORT ARTHUR:
Section 1. That the facts and opinions in the preamble
are true and correct .
Section 2 . That the City Council authorize the repair
and replacement of the HVAC systems at Fire Station Number 5
and Fire Station Number 8 from CAT 5 Resources of Nederland,
Texas, in the amount of $39, 257 . 18 .
Section 3 . That a copy of the Resolution shall be spread
upon the Minutes of the City Council .
READ, ADOPTED AND APPROVED on this day of ,
A.D . , 2018, at a Regular Meeting of the City Council of the
City of Port Arthur, Texas, by the following vote :
AYES:
Mayor:
Councilmembers : ,
NOES : .
Derrick Freeman, Mayor
ATTEST:
Sherri Bellard
City Secretary
APPROVED AS TO FORM:
74) j/1,/,1
Va Tizeno
City Attorney
APPROVED FOR ADMINISTRATION:
Harvey Robinson
Interim City Manager
Larry D Richard
Fire Chief
APPROVED AS TO AVAILABILITY OF FUNDS:
0,\LL
Andrew Vasquez
Director of Finance
/
tedheAk.
I /
Clifton Williams
Purchasing Manager
EXHIBIT "A"
Quote Tabulation
Fire Station 8 and 5 HVAC Repair and Replacement
CATS Nance
Location
Station 5 $ 15,229.68 $ 15,203.69
Station 8 $ 24,027.50 $ 24,682.46
Total $ 39,257.18 $ 39,886.15
EXHIBIT "B"
a
C .1211111k, Tr QUOTE
RESOURCES
To: City of Port Arthur
D• '' November 21.2017
5n, Station 5
Cat 5 80441
Station#5
Bunk House•HVAC 1
-Remove existing S ton air handler and condenser
Install new 5 ton air handler,tie into existing duct and electrica.
Install new S ton condenser with new slab/windstorm anchors ano 3/4'mectncal whip
-Re-insulate copper:rne sets where needed
Kitchen/training HVAC 2
Remove existing air handler and condenser
-Install new 4 ton air handler.tie into existing ducts and electrical
New 1/1 T stat
SALESPERSON Customer Contact information Purchase Order#
mruckeracat5res 409-241-8072 ext
Cats (. Malone Rucker
ources.com 135
QUANTITY DESCRIPTION UNIT PRICE LINE TOTAL
I OC 59,829.68 5
72.00 Labor 5 75.00 $ 5,400.00
TOTAL $ 15,229.68
Quota:an prepareo tri
CatS Res).reel,LLC wetrus tS s Poet Quote as a roc•a is est,esate earre0 woe tf•e cefniptro,of services:o oe rendered is rep ese-tee b's the
CATS QUOTE
RESOURCES
To:C1ty of Port Arthur
Cat.,ID- 80442
Site ID: Station8
DATE .or'
Station #8
Bunk House-HVAC 1
-Remove existing 3 ton air handler and condenser and delete dual staging duct system.Existing
duct work is sized for 8-10 tonsof air. Units were twinned at one time,but only wants to go
back with one 5 ton unit so duct will need to be removed and re-sized. It is extremelyover sized
at the moment.
-Install new 5 ton air handler with 15 KW heat strips,new deck,drain pan,and drains.
-Install new duct 1.5"duct board supply plenum and trunk linc with new flex and drop in grills.
-Add return jumpers for better return air flow.
-New 1/1 T-stat
-New condenser with slab/windstom anchors and electrical whip
-Mastic all tape scams
Kitchen-HVAC 2
-Remove existing 4 ton air handler and condenser
-Build new stand/ add return grill
-Install new 5 ton air handler
-Inspect and repair electrical
-Tie to existing duct work
-Rework drain and tie in rigid to existing 2"in slab
-Add return jumpers for better return air flow
-New 1/1 T-stat
-New condenser with slab/windstorm anchors and electrical whip
-Mastic all tape seams
Captain Malone's Office-HVAC 3
-Remove existing 2.5 ton air handler
-Rework existing stand and add return grill
-Add return jumpers for better air flow
-Tie to existing air duct
-New 1/1 T-stat
-New condenser with slab/windstorm anchors and electrical whip
SALESPERSON CUSTOMER CONTACT INFORMATION
Matt Truett Name:Rich Malone Phone.409-540 Lmail.rmalone@portarthur.com
073;
QUANTITY DESCRIPTION UNIT PRICE UNE TOTAL
1.00 Matenals 13,977.50 s 13977.50
134.00 Labor 75.00 s 10,050.00
TOTAL s 24,027.50