HomeMy WebLinkAboutPR 20120: HVAC STATION 8 AND STATION 5 HARVEY REPAIR Ciry of `4 /41 n l'I r t h f(l' Teras www.PortArthurTx.gov INTEROFFICE MEMORANDUM Date: February 15, 2018 To: The Honorable Mayor and City Council Through: Harvey Robinson, Interim City Manager From: Larry D. Richard, Fire Chief RE: PR 20120, HVAC Station 8 and Station 5 Harvey Repair Introduction: The intent of this Agenda Item is to seek the City Council's approval of Proposed Resolution 20120 authorizing the repair and replacement of the HVAC Systems at Fire Station Number 5 and Fire Station Number 8 by CAT 5 Resources located in Nederland, Texas in the amount of $39,257.18. Background: Fire Stations 8 and 5 suffered damage from the flooding associated with Hurricane Harvey. The HVAC systems including some of the ductwork will need to be replaced. The cost for Fire Station 5 is $15,229.68 and Fire Station 8 is $24,027.50. The City has received funds to settle the claim for building damage from NFIP in the amount of$230,669.87 for Fire Station Number 5 and$246,362.69 for Fire Station Number 8, an additional $40,000 per fire station was received for contents. The Purchasing and Fire Department contacted several vendors with two responsive quotes. CAT 5 was the lowest and best responsive quote. Budget Impact: Funds available in Hurricane Harvey Account No. 147-2300-901.32-00, Project 082617. Recommendation: The Fire Department recommends approval of this resolution. "Remember,we are here to serve the Citizens of Port Arthur" P.O.Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8101 X FAX 409.982.6743 P.R. No. 20120 2/15/18 ldr RESOLUTION NO. A RESOLUTION AUTHORIZING THE REPAIR AND REPLACEMENT OF THE HVAC SYSTEMS AT FIRE STATION NUMBER 5 AND FIRE STATION NUMBER 8 FROM CAT 5 RESOURCES OF NEDERLAND, TEXAS, IN THE AMOUNT OF $39, 257 . 18; FUNDING AVAILABLE IN HURRICANE HARVEY ACCOUNT NO. 147-2300-901. 32-00, PROJECT 082617 WHEREAS, the Fire Department' s Fire Stations Number 8 and 5 received extensive damage due to flooding associated with Hurricane Harvey; and WHEREAS, NFIP has settled the claim for Fire Station Number 8 ' s building damage for $246 , 362 . 69 plus $40 , 000 for contents; and WHEREAS, National Flood Insurance Protection (NFIP) has settled the claim for Fire Station Number 5 ' s building damage for $230, 669 . 87 plus $40 , 000 for contents; and WHEREAS, the Fire Department and Purchasing Department solicited quotes from numerous vendors and received two responsive quotes; and WHEREAS, CAT 5 Resources of Nederland, Texas was the lowest responsive quote (see Quote Tabulation attached hereto as Exhibit "A" ) ; and WHEREAS, a copy of the quote is attached as Exhibit "B" ; and WHEREAS, funds are available for this purchase in Hurricane Harvey Account Number 147-2300-901 . 32-00, Project 082617 . NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: Section 1. That the facts and opinions in the preamble are true and correct . Section 2 . That the City Council authorize the repair and replacement of the HVAC systems at Fire Station Number 5 and Fire Station Number 8 from CAT 5 Resources of Nederland, Texas, in the amount of $39, 257 . 18 . Section 3 . That a copy of the Resolution shall be spread upon the Minutes of the City Council . READ, ADOPTED AND APPROVED on this day of , A.D . , 2018, at a Regular Meeting of the City Council of the City of Port Arthur, Texas, by the following vote : AYES: Mayor: Councilmembers : , NOES : . Derrick Freeman, Mayor ATTEST: Sherri Bellard City Secretary APPROVED AS TO FORM: 74) j/1,/,1 Va Tizeno City Attorney APPROVED FOR ADMINISTRATION: Harvey Robinson Interim City Manager Larry D Richard Fire Chief APPROVED AS TO AVAILABILITY OF FUNDS: 0,\LL Andrew Vasquez Director of Finance / tedheAk. I / Clifton Williams Purchasing Manager EXHIBIT "A" Quote Tabulation Fire Station 8 and 5 HVAC Repair and Replacement CATS Nance Location Station 5 $ 15,229.68 $ 15,203.69 Station 8 $ 24,027.50 $ 24,682.46 Total $ 39,257.18 $ 39,886.15 EXHIBIT "B" a C .1211111k, Tr QUOTE RESOURCES To: City of Port Arthur D• '' November 21.2017 5n, Station 5 Cat 5 80441 Station#5 Bunk House•HVAC 1 -Remove existing S ton air handler and condenser Install new 5 ton air handler,tie into existing duct and electrica. Install new S ton condenser with new slab/windstorm anchors ano 3/4'mectncal whip -Re-insulate copper:rne sets where needed Kitchen/training HVAC 2 Remove existing air handler and condenser -Install new 4 ton air handler.tie into existing ducts and electrical New 1/1 T stat SALESPERSON Customer Contact information Purchase Order# mruckeracat5res 409-241-8072 ext Cats (. Malone Rucker ources.com 135 QUANTITY DESCRIPTION UNIT PRICE LINE TOTAL I OC 59,829.68 5 72.00 Labor 5 75.00 $ 5,400.00 TOTAL $ 15,229.68 Quota:an prepareo tri CatS Res).reel,LLC wetrus tS s Poet Quote as a roc•a is est,esate earre0 woe tf•e cefniptro,of services:o oe rendered is rep ese-tee b's the CATS QUOTE RESOURCES To:C1ty of Port Arthur Cat.,ID- 80442 Site ID: Station8 DATE .or' Station #8 Bunk House-HVAC 1 -Remove existing 3 ton air handler and condenser and delete dual staging duct system.Existing duct work is sized for 8-10 tonsof air. Units were twinned at one time,but only wants to go back with one 5 ton unit so duct will need to be removed and re-sized. It is extremelyover sized at the moment. -Install new 5 ton air handler with 15 KW heat strips,new deck,drain pan,and drains. -Install new duct 1.5"duct board supply plenum and trunk linc with new flex and drop in grills. -Add return jumpers for better return air flow. -New 1/1 T-stat -New condenser with slab/windstom anchors and electrical whip -Mastic all tape scams Kitchen-HVAC 2 -Remove existing 4 ton air handler and condenser -Build new stand/ add return grill -Install new 5 ton air handler -Inspect and repair electrical -Tie to existing duct work -Rework drain and tie in rigid to existing 2"in slab -Add return jumpers for better return air flow -New 1/1 T-stat -New condenser with slab/windstorm anchors and electrical whip -Mastic all tape seams Captain Malone's Office-HVAC 3 -Remove existing 2.5 ton air handler -Rework existing stand and add return grill -Add return jumpers for better air flow -Tie to existing air duct -New 1/1 T-stat -New condenser with slab/windstorm anchors and electrical whip SALESPERSON CUSTOMER CONTACT INFORMATION Matt Truett Name:Rich Malone Phone.409-540 Lmail.rmalone@portarthur.com 073; QUANTITY DESCRIPTION UNIT PRICE UNE TOTAL 1.00 Matenals 13,977.50 s 13977.50 134.00 Labor 75.00 s 10,050.00 TOTAL s 24,027.50 Thank you for your business!