HomeMy WebLinkAboutPR 20150: CONTRACT FOR REPAIRS TO DAMAGED ROOF AT THE WATER SERVICE CENTER P.R.No. 20150
03/02/2018 CEWJ
Page 1 of 2
RESOLUTION NO.
A RESOLUTION AUTHORIZING THE CITY MANAGER
TO ENTER INTO A CONTRACT WITH DURO-LAST
THROUGH TIP TAPS COOPERATIVE CONTRACT FOR
REPAIR OF THE DAMAGED ROOF AT THE WATER
SERVICE CENTER IN THE AMOUNT OF $58,363.84.
FUNDING FROM PROCEEDS RECEIVED FROM
INSURANCE
WHEREAS, The City of Port Arthur sustained substantial damages to Water Service
Center roof; and,
WHEREAS, it is deemed in the best interest of the City of Port Arthur to address the
concerns of the roof; and,
WHEREAS, Duro-last has a cooperative contract with TIP-TAPS; and
WHEREAS, Scarborough will be providing the service for Duro-last; and
WHEREAS, Chapter 271 of the Local Government Code allows a city,by resolution of
its governing body, to participate in cooperative purchasing programs, such as TIPS/TAPS, a
purchasing cooperative, as an alternative to a formal bid process; and
WHEREAS,per Resolution No. 12- 008, the City of Port Arthur entered into an
interlocal agreement with Region VIII Education Service Center for participation in the
Interlocal Purchasing System(TIPS/TAPS); and
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF PORT ARTHUR:
Section 1. That, the facts and opinions in the preamble are true and correct.
Section 2. That, the repair of the Water Service Center roof with Duro-last through
TIPS/TAPS in the amount of $58,363.83 is hereby approved, a copy of the estimate/quote is
attached hereto as Exhibit"A".
Section 3. That, a copy of this caption be spread upon the Minutes of the City
Council.
P.R. No. 20150
03/02/2018 CEWJ
Page 2 of 2
READ, ADOPTED AND APPROVED on this day of March , A.D., 2018,
at a Regular Meeting of the City Council of the City of Port Arthur, Texas, by the following
vote:
AYES: Mayor:
Councilmembers:
NOES:
Mayor
ATTEST:
Sherri Bellard
City Secretary
APPROVED AS TO FORM:
Val Tizeno
City Attorney
APPROVED FOR ADMINISTRATION:
Harvey Robinson Hani Tohme
Interim City Manager Interim Director of Utility Operations
1�,
a, to 1, t'
An4i7Y ,/
Vasquez Clifto Williams, CPPB
Director of Finance Purchasing Manager
EXHIBIT "A"
: OROUGH
industries, I n c. HU B#1752425783300
March 2, 2018
City of Port Arthur
444 4th Street
Port Arthur,Texas 77640
Attention: Clifton Williams
Reference: Water Service Center, 111 HO Mills Road, Port Arthur,Texas
Roof Repairs and Duro-Last Overlay
Request for Proposal Through TIPS
Dear Sir:
Scarborough Industries, Inc. ("SII" or"seller") hereby proposes to furnish to The
City of Port Arthur ("buyer" or"Owner") the necessary labor, material,equipment,
insurance and supervision to repair the roof at the Recreational and Senior Center,
supply and install Duro-Last Overlay of 50 mil. This proposal is based on utilizing the
following materials and qualifications:
Base Price for Duro-Fleece: $ 55,029.84
Add for 20 Year NDL Warranty: 1,178.00
Add for 4" Striping Around Edge: 456.00
Total Price: $ 56,663.84
If Bond is Required Add: $ 1,700.00
Proposal Includes:
1. Our proposal is strictly based on the RSMeans estimating guidelines as allowed by
TIPS.
2. Our pricing is based on installing fully adhered 50 mil Duro Fleece by Duro-Last as
defined by Owner and Mike White.
3. All work shall be performed according to the manufacturer's recommendations.
4. Engineered for a 120 mph wind rating.
5. We shall supply a 20 year NDL warranty for the additional fee if approved.
8480 N. Hwy 87 •Orange,Texas 77632•(409) 882-9778•Fax (409) 886-8264
:OROUGH]
''' Industries, )nc ,
Page 2
Port Arthur Water Service Center
6. Yellow striping at 4"wide shall be installed at 10'from the edge of the roof for the
additional fee if approved.
7. Our price does not include removal or disposal of the existing damaged mansard
cover.
8. Commercial General Liability and Worker's Compensation Insurance at industry
standards. A copy of our insurance will be submitted upon request or notification of
award.
9. All required safety equipment for PPE and project site.
10.Clean-up shall be performed on a daily basis.
11.All disposal of construction related equipment and debris.
12.Final clean-up of jobsite shall be performed at the end of the project to the
satisfaction of the owner.
Proposal Does Not Include:
1. Sales tax.
2. Repairs to any unknown or unseen structural, mechanical,electrical,or
water intrusion damage or deficiencies.
3. Removal or relocation of electrical conduit,communications cables, plumbing, or
any items not specifically noted in walk-through or in specifications.
Qualifications/Clarification:
1. City permit is not included.
2. SII is not responsible for existing building conditions such as, but not limited to:
mold,leaking walls,windows,gutters, interior drains, pipes,air conditioner equipment,
ducts,vents,fans,parapets, mansards,water lines, masonry walls, adjacent roofs,
skylights,trim,or existing water damage to existing building interior, (walls, ceiling,
floors, etc.).
3. Proposal is based on current limits for SII liability and worker's compensation
insurance.A certificate of coverage will be furnished upon request.All invoices are
due upon receipt. Payment is to be made to Scarborough Industries, Inc., Orange,TX
77632.
4. If buyer fails to fulfill the terms of payment,all past due invoices shall bear interest
at the maximum legal rate allowed by law. Owner agrees to reimburse seller for all
costs incurred, including but not limited to attorneys' fees and expenses, for the
collection of any past due invoices.
fr ()ROUGH
In ustries, lnc.
Page 3
Port Arthur Water Service Center
Special Conditions:
Owner to supply utility connections as needed for project, restroom access,and a
staging area for material and equipment.
Start Up Time:
Actual start date to be agreed upon following notification of award.
Completion Time:
60 working days Following Material Delivery
Payment Terms:
1. Standard Payment Terms: A downpayment of 1/3 shall bill shall be made for initial
order of material and mobilization. Upon delivery of material will shall invoice for 1/3.
The final invoice shall be submitted upon substantial completion of project. All invoices
are due upon receipt and made payable to Scarborough Industries,Inc., 8480 N. Highway
87 Orange,TX 77632.Warranty will not be validated by Scarborough Industries,Inc.
until project is paid in full as agreed including retained funds. Contract&Terms
2.Alternate Payment Terms: Terms can be agreed upon following award of contract
with Owner and SII.
Accepted by:
City of Port Arthur Date Scarborough Industries, Inc. Date
°ROUGH
industries, Inc.Czt
Page 4
Port Arthur Water Service Center
Intellectual Property:
Owner agrees that this document is the property of Scarborough Industries, Inc.
(SII) and is intended for the sole and private use of the buyer and/or buyer's
representatives to which it is addressed. It is not to be copied, or distributed
outside the buyer's organization without the express written consent of SII unless
and until it is approved in writing by the buyer's legal representative and SII.This
proposal may not be used to establish a scope of work,specification,plan, or any
other such document by which other developers,builders, contractors,construction
companies,etc.,may submit a comparative bid, quote, proposal, or similar
document. If the buyer and/or buyer's representatives to whom this document is
addressed use this document to establish a specification or solicit comparative bids
for the scope of work or any portion thereof as described herein,the buyer agrees
to pay SII a consulting fee equivalent to 15 percent of the"Total Proposal Amount"
listed above. This fee is in addition to any other payments due SII for any other
products or services which SII provides to the buyer under this agreement or any
other past or future agreement between the Owner and SII.