Loading...
HomeMy WebLinkAboutPR 20202: ROAD RECONSTRUCTION DUE TO WATER LINE REPAIRS City of nrt rthztr Texas INTEROFFICE MEMORANDUM UTILITY OPERATIONS DEPARTMENT-ADMINISTRATION Date: April 9, 2018 To: Harvey Robinson, Interim City Manager From: Hani Tohme, Ph.D.. Director of Utilities RE: Proposed Resolution No. 20202 — Road Reconstruction due to Water Line Repairs Nature of the Request: Due to a 12" water main blowout and emergency repair at Highway 69 and 19th Street, the Water Utilities Department is seeking ratification of the road repairs to a state highway through the TXDOT approved contractor, Excavation and Construction, LLC in the amount of $28,070.28. Due to the water main blow out, the services of Excavation and Construction, LLC was needed to repair the roadway in order to protect the public health and safety. Funding is available in Water Utilities 0& M Budget, Account No. 410-1253-532.35-00, Water Systems Maintenance. Staff Analysis, Considerations: Staff repaired the water lines and backfilled the hole. Budget Considerations: This project will be charged to Water Utilities 0 & M Account No. 410-1253-532.35-00, Water Systems Maintenance. Recommendation: I recommend that the City Council approve Proposed Resolution No. 20202 to ratify the road reconstruction in the amount of$28,070.28 due to the repair of the 12" water main at Highway 69 and 19th Street in order to protect the public health and safety. P.R. 20202 4/24/18 ds Page 1 of 4 RESOLUTION NO. A RESOLUTION RATIFYING ROAD RECONSTRUCTION WITH EXCAVATION AND CONSTRUCTION, LLC OF PORT ARTHUR, TEXAS DUE TO THE REPLACEMENT OF A 12" WATER MAIN ALONG HIGHWAY 69 AT 19TH STREET IN THE AMOUNT OF $28,070.28; FUNDING IS AVAILABLE IN WATER UTILITIES ACCOUNT NO. 410-1253-532.35-00, WATER SYSTEMS MAINTENANCE. WHEREAS, a 12" water main blowout at Highway 69 and 19th Street was repaired under emergency conditions to ensure public health and safety; and, WHEREAS,the repair required City forces to excavate a portion of Highway 69; and, WHEREAS,Highway 69 is a state highway, requiring a TXDOT approved contractor to repair the street; and, WHEREAS, Excavation and Construction, LLC of Port Arthur, Texas is a TXDOT approved contractor, and due to the water main blow out, their services were needed to repair the road in order to protect the public health and safety; and, WHEREAS, it is further authorized pursuant to Section 252.022(a)(2), of the Texas Local Government Code, a procurement necessary to preserve or protect the public health or safety of the municipality's residents. This procurement is also authorized pursuant to Section 252.022(a)(3), of the Texas Local Government Code, because of unforeseen damage to public machinery, equipment, or other property. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT,the facts and opinions in the preamble are true and correct; and, P.R. 20202 4/24/18 ds Page 2 of 4 THAT, in order to protect the health and safety of our citizens, the City Council hereby approves and ratifies the expense with Excavation and Construction, LLC of Port Arthur, Texas, for the road reconstruction due to the replacement of a 12" water main along Highway 69 at 19th Street in the amount of$28,070.28; and, THAT, a copy of the caption of this Resolution be spread upon the Minutes of the City Council. READ, ADOPTED,AND APPROVED this the_day of . A.D. 2018 at a meeting of the City of Port Arthur, Texas by the following vote: Ayes: Mayor: Councilmembers: Noes: Mayor Derrick Freeman ATTEST: City Secretary Sherri Bellard P.R. 20202 4/24/18 ds Page 3 of 4 APPROVED AS TO FORM: APPROVED FOR ADMINISTRATION: 47igi jAIA4D Valecia Tizeno Harvey Robinson City Attorney Interim City Manager Dr. Hani Tohme, P.E. Director of Water Utilities APPROVED AS FOR AVAILABILITY OF FUNr: )(5VeAndrew asquez, CPA Director of Finance rh t (77� 4,4x, Clift. Williams, CPPB Purchasing Manager P.R. 20202 4/24/18 ds Page 4 of 4 Exhibit "A" Exhibit "A" EXCRVRTION CONSTRUCTION BID FORM CONSTRUCTION OWNER INFORMATION CONTRACTOR INFORMATION Name City of Port Arthur Company EXCAVATION & CONSTRUCTION, LLC. Address 444 4th Street Eric Gilchriest City, State ZIP Port Arthur, TX. 77640 6601 Proctor Street Ext. Phone City, State ZIP Port Arthur, TX 77642 Email (409)728-4366 Email Eric.gilchriest@exconllc.com Project name U.S. 69 Repairs Completion date TBD SCOPE OF WORK To provide labor. equipment and materials to make asphalt and concrete repairs to TXDOT roadway damaged by broken water line. — 1253 - 532 . 35-00 NOT INCLUDED Does not include taxes or permits. 0 '5 COMPANY PROPOSAL 47.51 sy of Asphalt at$400 per SY: $ 19,004.00 47.51 sy of 10"Concrete at$178 per SY: $ 8,456.78 12.19 CY of Cement Stab. Sand backfill at $50 per CY: $ 609.50 TOTAL: $ 28,070.28] Sot&G Bele 4/6/2018 Submitted by (Company Representative) Date OWNER ACCEPTANCE Submitted by Date