Loading...
HomeMy WebLinkAboutPR 20264: EDC CONTRACT WITH SPAWGLASS BUILDING SERVICES, ROOF MAINTENANCE AND REPAIR Interoffice MEMORANDUM To: Mayor, City Council, City ager From: Floyd Batiste, CEO Date: May 15, 2018 Subject: P.R. No. 20264; Council Meeting of May 22,2018 ATTACHED IS PROPOSED RESOLUTION NO. 20264 AUTHORIZING THE CITY OF PORT ARTHUR SECTION 4A ECONOMIC DEVELOPMENT CORPORATION TO ENTER INTO A CONTRACT WITH SPAWGLASS BUILDING SERVICES OF BEAUMONT, TEXAS FOR ROOF MAINTENANCE AND REPAIR AT 501 PROCTER STREET IN AN AMOUNT NOT TO EXCEED $19,137.00 P.R. No. 20264 5/14/2018 KVM RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY OF PORT ARTHUR SECTION 4A ECONOMIC DEVELOPMENT CORPORATION TO ENTER INTO A CONTRACT WITH SPAWGLASS BUILDING SERVICES OF BEAUMONT,TEXAS FOR ROOF MAINTENANCE AND REPAIR AT 501 PROCTER STREET IN AN AMOUNT NOT TO EXCEED $19,137.00 WHEREAS, it is deemed in the best interest of the citizens of Port Arthur to enhance the appearance of the downtown area and to create an environment conductive to business and entertainment activities for the community; and WHEREAS, the City of Port Arthur Section 4A Economic Development Corporation ("PAEDC")has renovated the building at 501 Procter Street which now houses the PAEDC offices as well as several additional tenants; and WHEREAS, over time and due to weather and corrosion, the roof of the building at 501 Procter Street is in need of repairs; and WHEREAS, the PAEDC Board of Directors at their regular Board meeting of May 7, 2018, approved a proposal by SpawGlass Building Services ("SpawGlass") attached hereto as Exhibit"A" to repair the roof for an amount of$19,137.00. NOW THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR,TEXAS: Section 1. That the facts and opinions in the preamble are true and correct. Section 2. That the City Council authorizes PAEDC to enter into a contract with SpawGlass Building Services of Beaumont, Texas in an amount not to exceed $19,137.00. Section 3. That a copy of the caption of this Resolution be spread upon the Minutes of the City Council. READ, ADOPTED AND APPROVED on this day of A.D., 2018, at a Meeting of the City Council of the City of Port Arthur, Texas, by the following vote: AYES: Mayor Councilmembers NOES: Derrick Freeman, Mayor ATTEST: Sherri Bellard, City Secretary APPROVED Floyd Batis , PAE 1 C CEO APPROV R A: O FORM: Guy . Goodson, 'AED • orne APPROVED AS TO FORM: V;)( 6 Valecia R. Tizen , gyA7 rney #1498844 Page 2 EXHIBIT "A" SpawGlass April 26, 2018 Mr. Floyd Batiste Port Arthur Economic Development Corp. 501 Proctor St. Suite #100 Port Arthur, Texas 77640 Subject: Port Arthur Savings: Roof Maintenance and Repair Proposal Description: Roof repair, drain replacement, caulk stone, ceiling tile replacement, masonry/stone waterproofing and SpawGlass Supervision. Reference: Roofing reports from Vince Hauser and Gulf Star Roofing Dear Mr. Batiste: SpawGlass herby submits this proposal for the above referenced work; the total amount of this proposal is $19,137.00 (Nineteen Thousand One Hundred Thirty Seven Dollars and Zero cents) Scope of Work: • Repair damages to existing roof membrane (2) days for roofing crew included. * Extra Days are $2,975/day • Caulk stone by Penthouse. Stone to remain in place as recommended by Mason • Replace ceiling tiles that have water damage • Penthouse and perimeter cap to be sealed with Drylok after Masonry Sealant • Sure Klean Siloxane PD to be applied for Masonry Sealant • Replace ring, cover and bolts on (4) roof drains • No permit fees, per city of Port Arthur • All necessary supervision, insurance and coordination with PAEDC/ Building Tenants. Please contact me immediately should you have any questions or clarifications regarding this proposal. Sincerely, SpawGlass Construction Corp. dip Michael Green Project Manager 713-320-1858 Providing the Absolute Rest Construction Experience 350 Pine Street,Ste.310 I Beaumont,Texas 77701 1409-681-4547 Spaw6lass.com AUSTIN I GOLDEN TRIANGLE I HOUSTON I NORTH TEXAS I SAN ANTONIO I SOUTH TEXAS L DATE: 4/26/2018 Contractor Pricing Summary Project: Port Arthur Savings Building Mainten CONTRACTOR: SpawGlass Desc: Repair roof(multiple locationsj,replace storm drain covers,reset/caulk stone, waterpoof perimeter cap and penthouse with both siloxane and drylok sealers. DESCRIPTION UOM QTY HOURS UNIT LABOR MATERIAL EQUIPMENT S/C SUBTOTALS OF WORK RATE COSTS COSTS COSTS COSTS Repair Roof LS $5,950.00 $5,950.00 Roof Drain Replacement Bolts LS $3,695.00 $3,695.00 Reset/caulk Stone/waterpoofing(drylok) LS $3,400.00 $3,400.00 Masonry Sealant(Siloxane) LS 0232.00 $350.00 $582.00 Ceiling Tile Replacement LS $116.00 $120.00 $236.00 SpawGlass DAY2 $944.00 51,888 $1,888.00 Subtotal CD No. $2,236.00 $470.00 $0.00 $13,045.00 $15,751.00 Overhead&Profit Labor 20.00% $447.20 $447.00 Overhead&Profit Material 20.00% 094.00 $94.00 Overhead&Profit Equipment 20.00% $0.00 S0.00 Overhead Subcontract 20.00% $2,609.00 $2,609.00 Insurance 1.25% $236.00 Total Proposal Request $19,137.00 SpawGlass Building Services SpawGlass Building Services 350 Pine Street, Ste. 310- Beaumont,Texas 77701 - Phone (409) 681-4547 Answering Service -877-206-0944 Proposal May 9, 2018 Floyd Batiste Port Arthur EDC 501 Proctor St. Suite #100 Port Arthur, Texas 77640 Re: Repair Roof(Multiple Locations), replace storm drain covers,caulk stone,wati trproof perimeter cap and penthouse with siloxane and drylok sealers. Address of Service: 501 Proctor St. Port Arthur,Texas 77640 Dear Mr. Batiste, SpawGlass Construction Corp. is pleased to offer our proposal to perform the scope as descri bed in the following inclusions: I. INCLUSIONS We have estimated: 1) Replace 2'x2'ceiling tiles as required 2) Replace roof drain covers and bolts 3) Caulk Stone at Penthouse 4) Waterproof perimeter cap and penthouse 5) Clean all scope related trash and dispose of in owner furnished dumpste r Cost of Service $ 19,137.00 Sales Tax(8.25%) TAX EXEMPT Total Cost of Service $ 19,137.00 II. EXCLUSIONS 1) Any additional areas needing repair 2) State tax 3) Bonding 4) Building permit cost, if required 5) Roofing working beyond (2) days III. OWNER-SUPPLIED 1) Dumpster Any work performed outside of this scope of work is to be considered a change order and paid in addition to the stated contract amount. This offer is subject to arrangements being made, which are satisfactory to Contractor,for payment of the contract sum and security thereof. Note: This proposal is valid for thirty (30)days only. 5/9/2018 / Y Josh Baker Date Floyd Ba ste Date SpawGlass Construction Corp. Port Arthur EDC