INTEROFFICE MEMORANDUM
Date: May 24, 2018
To: The Honorable Mayor and City Council
Through: Harvey Robinson, Interim City Manager
From: Clifton Williams, Purchasing Manger
RE: P.R. 20293 —Mold Remediation Water Service Center
Introduction:
City is requesting City Council approve P.R. No. 20293 authorizing the Council approval to
approve the Mold Remediation of Water Service Center by Action Restoration of Port Arthur,
Texas in the amount of$53,040.50.
Background:
The Water Service Center was damaged by the flooding caused by on Hurricane Harvey. Due
to the extensive mold damage, the Water Service Center is currently not in use. Total Safety
tested for mold and previously tested for asbestos and determined that only mold remediation
was required, and provided a scope of work. Action Restoration provided a TIPS/TAPS
quote based on that scope of work in the amount of$53,040.50.
Budget Impact:
Payment will be provided by funds received from insurance. (Account No. 147-2300-901.32-
00, Project No. 082617) Emergency Management Fund
Recommendation:
City is requesting City Council approve P.R. No. 20293 authorizing Mold Remediation of the
Water Service Center by Action Restoration of Port Arthur, Texas in the amount of$53,040.50
"Remember,we are here to serve the Citizens of Port Arthur"
P.O.Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8182 X FAX 409.983.8294
P.R. No. 20293
05/24/2018 CEWJ
Page 1 of 2
RESOLUTION NO.
A RESOLUTION AWARDING THE MOLD REMEDIATION
OF WATER SERVICE CENTER TO ACTION
RESTORATION OF PORT ARTHUR THROUGH
TIPS/TAPS COOPERATIVE CONTRACT WITH THE
PROJECTED BUDGETARY IMPACT AMOUNT OF
$53,050.50. FUNDING FROM PROCEEDS RECEIVED
FROM INSURANCE (ACCOUNT NO 147-2300-901.32-00
PROJECT NO. 082617) EMERGENCY MANAGEMENT
FUND
WHEREAS, the City's Water Service Center located at 111 H.O. Mills sustained major
flood damages during Hurricane Harvey; and,
WHEREAS, the moisture from the flood water has caused mold to form within the
building making it unfit for habitation; and,
WHEREAS, it is deemed in the best interest of the City to address the health and safety
concerns at Water Service Center; and,
WHEREAS, Action Restoration, Inc. of Port Arthur have submitted a proposal for the
mold remediation through TIPS/TAPS, a cooperative purchasing program; and
WHEREAS, Charter 271 of the Local Government Code allows a city,by resolution of its
governing body, to participate in cooperative purchasing programs, such as TIPS/TAPS, a
purchasing cooperative, as an alternative to a formal bid process; and
WHEREAS, pursuant to Resolution No. 12-008, the City of Port Arthur entered into an
interlocal agreement with Region VIII Education Service Center for the participation in the
Interlocal Purchasing System (TIPS/TAPS); and
NOW THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF PORT ARTHUR:
Section 1. That,the facts and opinions in the preamble are true and correct.
Section 2. That, the mold remediation of the Water Service Center with Action
Restoration, Inc. through TIPS/TAPS,with a projected budgetary impact amount of$53,050.50 is
hereby approved, a copy of the estimate/quote is attached hereto as Exhibit"A".
Section 3. That,a copy of this caption be spread upon the Minutes of the City Council.
P.R. No. 20293
05/24/2018 CEWJ
Page 2 of 2
READ, ADOPTED AND APPROVED on this day of , A.D., 2018, at a
Regular Meeting of the City Council of the City of Port Arthur, Texas, by the following vote:
AYES: Mayor:
Councilmembers:
NOES:
Mayor
ATTEST:
Sherri Bellard
City Secretary
API" OVED AS TO FORM:
PJ GCS b_a_Af/cfor
Val Tizen•
City Attorney
APPROVED FOR ADMINISTRATION:
Harvey Robinson Hani Tohme
Interim City Manager Interim Director of Utility Operations
0 .,..
Andre Vasque C i •n Williams, CPPB
Director of Finance Purchasing Manager
EXHIBIT "A"
CONTRACT FOR MOLD REMEDIATION
AT THE WATER SERVICE CENTER
THIS AGREEMENT, made this day of , 2018,
by and between the City of Port Arthur, a municipal corporation organized under the laws
of the State of Texas, hereinafter called "OWNER" or "CITY" and Action Restoration,
a(n) Corporation herein acting by and through hereinafter
called "CONTRACTOR"
WITNESSETH: That for and in consideration of the payment terms, conditions
and agreements set forth herein , OWNER and CONTRACTOR agree as follows:
1. The term of this Contract shall be 14 calendar days from start date on Notice to
Proceed.
2. The Contractor will perform work as stated in the Contract Documents.
3. During the term of this Contract, the Contractor will furnish at his own expense all of
the materials, supplies, tools, equipment, labor and other services necessary to
connection therewith, excepting those supplies specifically not required of Contractor
in the Specifications.
4 The CONTRACTOR agrees to perform all the work described in the proposal and
contract documents and to comply with the terms therein for the rates stated in the
proposal for a sum of$53,040.50.
6. The term "Contract Documents" means and includes the following:
a) Agreement
b) Proposal
7. This Agreement shall be binding upon all parties hereto and their respective heirs,
executors, administrators, successors and assigns.
8. IN WITNESS WHEREOF, the parties hereto have executed, or caused to be executed
by their duly authorized officials,this Agreement in( 2 copies) each of which shall be
deemed an original on the date first above written.
Signed on the day of 2018
A- 1
ATTEST CITY OF PORT ARTHUR
BY
CITY SECRETARY
Signed on the day of 2018
ATTEST ACTION RESTORATION
BY
CITY SECRETARY
A- 2
RESTORATIONAC N
5215 Twin City Hwy
Pt. Arthur, TX 77642
409-962-1647 Office
409-962-7650 Fax
1-800-218-9556 Toll
PROPOSAL : TIPS PRICING May 17, 2018
RE: Water Service Center
111 H.O. MILLS RD PORT ARTHUR , TX
Scope of Work:
Mold Remediation following protocol provided by Total Safety in climate controlled areas.
PRICE TO PERFORM WORK $49,340.00 (plus taxes if
applicable)
General:
-All work will be carried out in accordance with all EPA, OSHA and TDH Rules, Regulations and
Guidelines
•The above pricing includes no replacement materials or systems including labor to install
replacement materials or systems
-Water and electricity shall be provided by customer at no additional charge to Action
Restoration.
Exclusions :
.5F Rate is base on non restricted access to building.
.Any down time resulting from access issues will be charged to client
.SF Rate is also base on all utilities required to perform the scope of work
be provided by owner at no charge to Action Restoration
Action Restoration has been a member of the NADCA since 2010
Payment Terms: NET 30 Proposal Valid until JUNE 17,2018
Please feet free to phone me at 409-728-0763 should you have any questions concerning this
proposal.
Best Regards,
Jonathan Morfin
409-962-1647-Office
409-728-0763—Mobil
www.actiondki.com
RESTORATIONACTIS1N
5215 Twin City Hwy
Pt. Arthur, TX 77642
409-962-1647 Office
409-962-7650 Fax
1-800-218-9556 Toll
May 17, 2018
Re: Water Service Center
111 H.O. MILLS RD PORT ARTHUR, TX
T.I.P.S. RATES
Thank you for allowing Action Restoration, Inc. to provide the following proposal to you for
the HVAC duct and coil cleaning project listed above. We have been serving this industry for
17 years with over 10 million in specialty equipment. Action Restoration is a certified NADCA
(National Air Duct Cleaning Association) company, HUB and WBE certified. All workers are
trained and experienced in HVAC duct and coil cleaning.
Action proposes to provide all labor, material and equipment to perform the following:
Scope of Work:
Action proposes to clean the HVAC duct in Water Service Center
The scope of work will be performed and completed in a workmanship like manner.
PRICE TO PERFORM WORK $3,700.50 (plus taxes if
applicable)
General:
.Price includes 4934 sf of air duct cleaning.
.A $80.00 cost will be added to each coil that is requested to be cleaned.
•All work will be carried out in accordance with all EPA, OSHA and TDH Rules, Regulations and
Guidelines
•The above pricing includes no replacement materials or systems including labor to install
replacement materials or systems
•Water and electricity shall be provided by customer at no additional charge to Action
Restoration.
Exclusions :
.SF Rate dose not include detachment of HVAC coil or blower only contact HEPA vacuum
per NADCA standard
.SF Rate is base on non restricted access to building.
.Any down time resulting from access issues will be charged to client
.SF Rate is also base on all utilities required to perform the scope of work
be provided by owner at no charge to Action Restoration
Action Restoration has been a member of the NADCA since 2010
Payment Terms: NET 30 Proposal Valid until JUNE 17,2018
Please feel free to phone me at 409-728-0763 should you have any questions concerning this
proposal.
Best Regards,
Jonathan Morfin
409-962-1647-Office
409-728-0763—Mobil
www.actiondki.com