INTEROFFICE MEMORANDUM
Date: May 25, 2018
To: The Honorable Mayor and City Council
Through: Harvey Robinson, Interim City Manager
From: Clifton Williams, Purchasing Manger
RE: P.R.No. 20295 —Renovation of the Water Service Center
Introduction:
City is requesting City Council approve P.R. No. 20295 authorizing the Council approval to
approve the Renovation of the Water Service Center by SpawGlass Construction Corp of
Beaumont, Texas with a projected budgetary impact of$236,794.95.
Background:
The Water Service Center was damaged by the flooding caused by Hurricane Harvey. Due to
the extensive damage, the Water Service Center is currently not in use. Once the mold
remediation has been completed, the City will begin renovation of the Water Service Center. A
BuyBoard quote was received by SpawGlass Construction Corp in the amount of$236,794.95.
Budget Impact:
Payment will be provided by funds received from insurance. (Account No. 147-2300-901.32-
00, Project No. 082617) Emergency Management Fund
Recommendation:
City is requesting City Council approve P.R. No. 20295 authorizing renovation of the Water
Service Center by SpawGlass Construction Corp of Beaumont,Texas with a projected budgetary
impact amount of$233,295.67.
"Remember,we are here to serve the Citizens of Port Arthur"
P.O.Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8182 X FAX 409.983.8294
P.R. No. 20295
05/25/2018 CEWJ
Page 1 of 2
RESOLUTION NO.
A RESOLUTION AWARDING A CONTRACT FOR THE
RENOVATION OF THE WATER SERVICE CENTER TO
SPAWGLASS CONSTRUCTION CORP OF BEAUMONT,
TEXAS THROUGH BUYBOARD COOPERATIVE
CONTRACT #520-16 EZ1QC WITH A PROJECTED
BUDGETARY IMPACT OF $236,794.95. FUNDING IS
AVAILABLE IN EMERGENCY MANAGEMENT FUND
(ACCOUNT NO. 147-2300-901.32-00, PROJECT#082617)
WHEREAS,the Water Service Center located at 111 H.O. Mills sustained major damages
from Hurricane Harvey; and,
WHEREAS,the Water Service Center is currently not is use due to the extensive damages
caused by the flooding; and,
WHEREAS,it is deemed in the best interest of the City of Port Arthur to address the health
and safety concerns by carrying out mold remediation and renovations to the Water Service Center;
and,
WHEREAS, SpawGlass Construction Corp has submitted a proposal for the renovation
through a cooperative contract with BuyBoard; and
WHEREAS, Chapter 271 of the Local Government Code allows a city, by resolution of
its governing body, to participate in cooperative purchasing programs, such as BuyBoard, a
purchasing cooperative, as an alternative to a formal bid process; and
WHEREAS, per Resolution No. 02-341,the City entered into an interlocal agreement for
cooperative purchasing with the BuyBoard Cooperative Purchasing Program("BuyBoard"); and,
NOW THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF PORT ARTHUR:
Section 1. That,the facts and opinions in the preamble are true and correct.
Section 2. That, the renovation of the Water Service Center with SpawGlass
Construction Corp of Port Arthur through BuyBoard, with a projected budgetary impact of
$236,794.95 is hereby approved, a copy of the estimate/quote is attached hereto as Exhibit"A".
Section 3. That,a copy of this caption be spread upon the Minutes of the City Council.
P.R. No. 20295
05/25/2018 CEWJ
Page 2 of 2
READ, ADOPTED AND APPROVED on this day of , A.D., 2018, at a
Regular Meeting of the City Council of the City of Port Arthur, Texas, by the following vote:
AYES: Mayor:
Councilmembers:
NOES:
Mayor
ATTEST:
Sherri Bellard
City Secretary
AP 'ROVED AS TO FORM:
/ ll
Vdtee b -F U
Val Tize
City Attorney
APPROVED FOR ADMINISTRATION:
Harvey Robinson Armando Gutierrez
Interim City Manager Director of Public Works
)(4`11", 01.464.4.1.4
Andrew Vasquez Clifton Williams, CPPB
Director of Finance Purchasing Manager
EXHIBIT "A"
CONTRACT FOR RENOVATION
AT THE WATER SERVICE CENTER
THIS AGREEMENT, made this day of , 2018,
by and between the City of Port Arthur, a municipal corporation organized under the laws
of the State of Texas, hereinafter called "OWNER" or "CITY" and SpawGlass Building
Services,a(n) Corporation herein acting by and through hereinafter
called "CONTRACTOR"
WITNESSETH: That for and in consideration of the payment terms, conditions
and agreements set forth herein , OWNER and CONTRACTOR agree as follows:
1. The term of this Contract shall be 60 calendar days from start date on Notice to
Proceed.
2. The Contractor will perform work as stated in the Contract Documents.
3. During the term of this Contract, the Contractor will furnish at his own expense all of
the materials, supplies, tools, equipment, labor and other services necessary to
connection therewith, excepting those supplies specifically not required of Contractor
in the Specifications.
4 The CONTRACTOR agrees to perform all the work described in the proposal and
contract documents and to comply with the terms therein for the rates stated in the
proposal for a sum of$236,794.95.
6. The term "Contract Documents" means and includes the following:
a) Agreement
b) Proposal
7. This Agreement shall be binding upon all parties hereto and their respective heirs,
executors, administrators, successors and assigns.
8. IN WITNESS WHEREOF, the parties hereto have executed, or caused to be executed
by their duly authorized officials, this Agreement in( 2 copies) each of which shall be
deemed an original on the date first above written.
Signed on the day of 2018
A- 1
ATTEST CITY OF PORT ARTHUR
BY
CITY SECRETARY
Signed on the day of 2018
ATTEST SPAWGLASS BUILDING SERVICES
BY
CITY SECRETARY
A- 2
SpawGlass Building Services
SpawGlass Building Services
350 Pine Sven,Ste.310-Beaumont,Texas 77701-Phone(409)681-4547
Answering Service-877-206-0944
Proposal
BuyBoard Contract a 520-16 ez1QC
May 30,2018
Clifton Williams
City of Port Arthur
111 H 0 Mills Blvd.
Port Arthur Texas 77640
Re: Restoration of Water Utlities Building
Address of Service: 111 H 0 Mills Blvd.
Dear Mr.Williams,
SpawGlass Construction Corp.is pleased to offer our proposal to perform the scope as described in the following inclusions:
We have estimated:
1)Install sheetrock up to 4'with Tape Float &Paint to match existing color and texture$26,000
2)Undercut wood doors$1791
3)install new ceiling tiles throughout(ceiling grid to remain)$11,000
4)Install new data drops in existing locations$4,960
5)Install new 2 x 4 Lights in Mech.Room,Water Test Room and Bathrooms remediated sections(all other lights to remain)$3500
6)Install new fire alarm system(Control Panel,Smoke Detectors,Pull Stations,&HVAC Relays)$6,584
7)All Existing Fire Alarm&Electrical wiring to remain
8)Install existing bathroom fixtures,partitions,wall mounted accessories,and millwork.$2,000
9)Replace existing interior/exterior wall outlets with new outlets of same type$4,845
10)Floor prep for new flooring$2,500
11)Install new flooring throughout office,break room and common areas with LVT/Carpet,with 4-rubber base$45,097
12)Sealed Concrete floors in Mechanical Room and Water Test Room$1,000
13)Install new millwork in break room$4,501
14)Insulate exterior walls$2,860
15)Caulk exterior winodws and paint lintels $1,745
16)Salvage millwork,toilet partitions and wall mounted accessories in bathroom areas for future use$2,000
17)Install new HVAC system(existing controls to remain),including demolition of all existing HVAC equipment(AHU Condensers&
ductwork in Mech.Room up to ceiling elevation)$85,678
18)Install existing plumbing items(sinks,water fountains t pilots,urinals.)$9,046
19)All insurance,p&p bonds,temporary toilets,storage containers,dumpsters,site supervision and general conditions$21,687.95
Cost of Service $ 236,794.95
Sales Tax(8.25%) TAX EXEMPT
Total Cost of Service $ 236,794.95
II. EXCLUSIONS
1 Any additional areas needing repair
2 State tax
3 Building permit cost by owner if required
4 Security System
5 Flooring Demolition
6 New wiring for electrical and fire alarm
7 Additional work caused by remediation contractor
8 Phone service feed to building
9 Mold Remedlation
10 Exterior facade repair/modification
11 Repair of deteriorated/damaged substrates and MEP Items covered up by existing construction
12 Operable Partition modification or replacement
13 Any appliances and battery backups
14 Any work on garage building
15 Electrical feed to water utility building
16 Door Repalcement
17 Ceiling Insulation
18 Removal of existing flooring adhesive(VCT&Carpet)
19 Asbestos Remediation
III. OWNER-SUPPLIED
Any work performed outside of this scope of work is to be considered a change order and paid In addition to the stated contract amount This offer Is subject to arrangements
being made,which are satisfactory to Contractor,for payment of the contract sum and security thereof.
Note:This proposal is valid for thirty(30)days only.
5/30/2018
Josh Baker Date Clifton Williams Date
SpawGlass Construction Corp. City of Port Arthur