Date: June 12, 2018
To: The Honorable Mayor and City Council
Through: Harvey Robinson, Interim City Manager
From: Clifton Williams, Purchasing Manager
RE: P.R. 20314 — Renovation of the Operation Center
Introduction:
Staff is requesting City Council's approval of P.R. No. 20314 authorizing renovation of
the Operation Center by SpawGlass Construction Corp of Beaumont, Texas in the
amount of $200,301.
Background:
The Operation Center was damaged by the flooding caused by on Hurricane Harvey.
Due to the extensive damage the Operation Center is currently not in use. Once the
mold remediation is complete, the City will begin renovation of the Operation Center.
A Buyboard quote was received by SpawGlass Construction Corp in the amount of
$200,301.
Budget Impact:
Payment will be provided by funds received from insurance. (Account No. 147-2300-
901.32-00, Project No. 082617) - Emergency Management Fund.
Recommendation:
Staff is requesting City Council's approval of P.R. No. 20314 authorizing renovation of
the Operation Center by SpawGlass of Beaumont, Texas, through their Buyboard
contract in the amount of $200,301.
"Remember,we are here to serve the Citizens of Port Arthur"
P.O. Box 1089 a Port Arthur,Texas 77641-1089 a 409.983.8182 a FAX 409.983.8294
P.R. No. 20314
06/12/2018 CEWJ/gt
Page 1of3
RESOLUTION NO.
A RESOLUTION AUTHORIZING THE CITY MANAGER TO ENTER
INTO A CONTRACT WITH SPAWGLASS CONSTRUCTION CORP. OF
BEAUMONT, TEXAS, THROUGH BUYBOARD COOPERATIVE
CONTRACT NO. 520-16 EZ1QC FOR THE RENOVATION OF THE
OPERATION CENTER, IN THE AMOUNT OF $200,301. FUNDING
FROM PROCEEDS RECEIVED FROM INSURANCE IN ACCOUNT NO.
147-2300-901.32-00, PROJECT NO. 082617 - EMERGENCY
MANAGEMENT FUND.
WHEREAS, the Operation Center was damaged by flooding from Hurricane
Harvey; and,
WHEREAS, the Operation Center is currently inoperable due to the damage
caused by the flooding; and,
WHEREAS, it is deemed in the best interest of the City of Port Arthur to address
the concerns of the Operation Center; and,
WHEREAS, SpawGlass Construction Corp. of Beaumont, Texas, has a
cooperative contract with Buyboard; and
WHEREAS, Chapter 271 of the Local Government Code allows a city, by
resolution of its governing body, to participate in cooperative purchasing programs,
such as Buyboard, a purchasing cooperative, as an alternative to a formal bid process;
and
WHEREAS, per Resolution No. 02-341, the City entered into an interlocal
agreement for cooperative purchasing with the Buyboard Cooperative Purchasing
Program ("Buyboard").
P.R. No. 20314
06/12/2018 CEW3/gt
Page 2 of 3
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF PORT ARTHUR:
Section 1. That, the facts and opinions in the preamble are true and correct.
Section 2. That, the City Manager is herein authorized to enter into a contract
with SpawGlass Construction Corp. of Beaumont, Texas, through BuyBoard Contract No.
520-16 ez1QC for the renovation of the Operation Center, in the amount of
$200,301.00, a copy of the estimate/quote is attached hereto as Exhibit "A".
Section 3. That, a copy of this caption be spread upon the Minutes of the City
Council.
READ, ADOPTED AND APPROVED on this day of June, A.D.,
2018, at a Regular Meeting of the City Council of the City of Port Arthur, Texas, by the
following vote: AYES:
Mayor:
Councilmembers: ,
NOES: .
Derrick Ford Freeman, Mayor
ATTEST:
Sherri Bellard
City Secretary
P.R. No. 20314
06/12/2018 CEW]/gt
Page 3 of 3
APPROVED FOR ADMINISTRATION:
Harvey Robinson
Interim City Manager
Armando Gutierrez
Director of Public Works
Andrew Vasquez
Director of Finance
Clifton Williams, CPPB
Purchasing Manager
APPROVED AS TO FORM:
Val Tizeno
City Attorney
EXHIBIT "A"
WILL BE PRESENTED AT OR BEFORE
THE COUNCIL MEETING
Spin cias.5 Building Services
•
SpawGlass Building Services
350 Pine Street, Ste. 310 - Beaumont,Texas 77701 - Phone (409) 681-4547
Answering Service - 877-206-0944
Proposal
Buy Board 520-16 ez1OC
June 11, 2018
Clifton Williams
City of Port Arthur
201 H 0 Mills Balvd
Port Arthur, Texas 77640
Re: Construction Services for Operations Center Building g (Office Area)
Address 201 H 0 Mills Blvd.
of
Dear Mr. Williams
Spawt lass Construction Corp. is pleased to otter our proposal to perform the scope as described in the toilowing
inrli icinns:
I. INCLUSIONS
We have estimated:
1 Install Gypsum to 8' +/-ceiling heights at office locations, lobby area is to be 12' +/-, and texture with standard orange peel,
2 Replace all ceiling grid with 2x2 layout (existing grid demo by others) ($10,011)
3 Install standard laminate counter tops in womens and mens restroom (no lower cabinets) ( $ 8,950)
4 Install 4" base in all office areas except natural stone wall areas ($ 2,055)
5 Seal concrete floors with (H&C Shield Crete) clear sealer in office area only ($3,482)
6 Furnish and Install (6) new toilets and (3) new urinals,Remove and Reset Fixtures (1) toilet, (3) lavatories and reconnect (1)
pvc roof drain($10,803)
7 Replace (14) hollow metal doors and (25) standard paint grade wood doors.Install (14) door closers and standard hardware on
each of the (39) doors. ($17,373)
8 Replace (3) toilet partition stalls in womens bathroom ($4,725)
9 Remount 1/2" wall conduit in 3rd bay area away from office space.
10 Install new thermostats for(3) zones and rework duct to accept new diffusers ($ 10,072)
11 Replace (4) can lights in shower area,(4) exit lights in existing locations,and (1) wall mounted motion sensor
12 Repaint all areas of newly installed gypsum and existing exposed CMU masonry ($14,285)
13 All temproray toilets,dumpsters,insurance,self perform labor, bond and site supervision ($ 55,931)
14 Existing light fixtures are to be re used and in good condition and to remain connected
15 All substrates are assumed to be in good condition and suitable for renovation construction
16 Work Areas included (6) offices, (1) lobby area, (2) restroom areas, (1) breakroom, (1) conference room and all corridors
within office area
Cost of Service $ 200,301.00
Sales Tax (8.25%) TAX EXEMPT
Total Cost of Service $ 200,301.00
II. EXCLUSIONS
1 Any additional areas needing repair
2 State tax
3 Building permit cost(permit to be pulled for$0)
4 Asbestos/ Mold/ Hazardous Material Remediation
5 Ceiling Paint/ Paint removal
6 Exterior/ Waterproofing/or Glass work of any kind
7 Additional work or repair that is caused during the remediation process
8 Demolition (Interior/ Exterior) including existing flooring adhesive removal
9 Any work in Garage Area not specifically listed above
10 Floor covering or wall tile work
11 Restroom Accessories
12 New HVAC System or repair, Duct/ Duct Cleaning
13 Fire Alarm,Life Safety Upgrades/ new work and Security System or work on existing panelboards/ breakers
14 Any finish work on existing stone walls, exposed concrete ceilings
15 Repair work in any storage areas or tool rooms
16 Work required to bring office/and restrooms area into ADA compliance
17 Interior finish work to be below ceiling only, no fire caulking or fire rated walls
18 Main power feed to building and or new electrical wiring (all wiring is assumed to be in good functioning order)
19 Interior glass work
20 Door frames (existing door frames are to be salvaged and re-used) If interior door frames are removed or unsalvageable an
addition to the contract of($8,430.00) will be required
21 new sinks, existing sinks are to be re-used
III. Notes
Pricing breakouts are submitted for reference only/ proposal is submitted as a complete proposal ¬ individual scope
selection
Any work performed outside of this scope of work is to be considered a change order and paid in addition to the stated contract amount.This
offer is subject to arrangements being made, which are satisfactory to Contractor, for payment of the contract sum and security thereof.
Note: This proposal is valid for thirty (30) days only.
6/25/2018
Josh Baker Date City of Port Arthur