HomeMy WebLinkAboutPR 20287: PROPERTY DAMAGE SETTLEMENT IN THE AMOUNT OF $10,108.61 FOR DAMGES TO CITY OF PORT ARTHUR FIRE DEPARTMENT AIRBOAT, UNIT 1875 [ J
City of f.
•
urr rrhttr
le tas
INTEROFFICE MEMORANDUM
Office of Safety & Risk Management
Date: June 22, 2018
To: Harvey L. Robinson, Interim City Mana er
From: Traineka A. Williams, Safety & Risk Mana
RE: A Resolution Approving a Property Damage Settlement in the Amount of $10,108.61 for
Damages to City of Port Arthur Fire Department Airboat, Unit 1875 (August 30, 2018)
Nature of the request: On August 30, 2017, Fire Department mobile equipment unit
#1875, (2011 Diamondback 18' Airboat), sustained damages during the flooding from Hurricane
Harvey.
Staff Analysis, Considerations: The City has Property Damage insurance coverage through
Texas Municipal League Intergovernmental Risk Pool (TML) with a $1,000.00 deductible.
TML has offered the City a settlement of$10,108.61, less the $1,000.00 deductible making the
settlement offer $9,108.61 (Exhibit "A" attached). This amount is sufficient to cover the
estimated property damages for repairs to the Fire Department airboat unit 1875. If additional
damages are discovered, TML may issue a supplemental payment.
Recommendation: I recommend approval of Proposed Resolution No. 20287 authorizing the
property damage settlement against TML for damage sustained to the Fire Department's airboat
during the flooding of Hurricane Harvey. TML has offered to settle the claim for $10,108.61,
less the $1,000.00 deductible, making the settlement offer $9,108.61. This is considered a fair
and reasonable settlement.
Budget Considerations: The funds received will be deposited in the Insurance Proceeds
Account#147-0000-369-85.00, Project#082617.
"Remember we are here to serve the Citizens of Port Arthur"
P.R. No. 20287
06/22/18 TAW
RESOLUTION NO.
A RESOLUTION AUTHORIZING THE CITY MANAGER
TO EXECUTE THE SETTLEMENT OF A CLAIM IN THE AMOUNT OF $10,108.61 MADE
AGAINST TEXAS MUNICIPAL LEAGUE INTERGOVERNMENTAL RISK POOL (TML) AS A
RESULT OF THE FLOOD DAMAGES TO A UNIT OF MOBILE EQUIPMENT DUE TO
HURRICANE HARVEY (AUGUST 30, 2017)
(2011 DIAMONDBACK 18' AIRBOAT)
WHEREAS, on August 29, 2017, Hurricane Harvey struck the City of Port Arthur,
resulting in flood damage to the mobile equipment as listed in Attachments "A" (attached);
and,
WHEREAS, as a result of the damage, a claim was filed with Texas Municipal League
Intergovernmental Risk Pool (TML); and,
WHEREAS, TML has offered to settle the claim in the amount of $10,108.61, less the
$1 ,000.00 deductible, which has been determined to be a fair and reasonable settlement.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
PORT ARTHUR, TEXAS:
Section 1. That, the facts and opinions in the preamble are true and correct.
Section 2. That, the City Manager is hereby authorized to execute settlement in the
amount of $10,108.61, less the $1 ,000.00 deductible, for the claim against Texas Municipal
League Intergovernmental Risk Pool (TML). This amount is based on an estimated cost for
flood-related repairs; therefore, if additional flood-related costs are incurred, Texas Municipal
League Intergovernmental Risk Pool may issue a supplemental payment.
P.R. No. 20287
06/22/18 TAW
Section 3. That, a copy of this Resolution be spread upon the minutes of the City
Council.
READ, ADOPTED, AND APPROVED this day of , AD, 2018, at a
Meeting of the City Council of the City of Port Arthur, Texas, by the following vote:
AYES: Mayor , Councilmembers
NOES:
Derrick Ford Freeman, Mayor
ATTEST:
Sherri Bellard, City Secretary
APPROVED AS,TO FORM:
\COS( . /. '
Val Tizeno, City AttornOy
APPROVED FOR ADMINISTRATION:
Harvey Robinson, Interim City Manager
ATTACHMENT " A"
TML
INTERGOVERNMENTAL RISK POOL
Workers' Compensation • Property • Liability
June 08, 2018
City of Port Arthur
Attn: Monique LeFlore
PO Box 1089
Port Arthur, TX 77641-1089
RE: TMLIRP Fund Member: City of Port Arthur
Date of Loss: August 30, 2017
TMLIRP Claim No: PR0000000066018
Mobile Equipment: FD Airboat
Dear Ms. LeFlore:
Enclosed is TMLIRP check in the amount of $9,108.61 ($10,108.61 - $1,000.00 deductible), as
agreed for the above-referenced claim.
Should you have any questions or concerns, please feel free to contact me.
Sincerely,
VfvALA ine-
Melanie Friske
Claims Specialist
Texas Municipal League Intergovernmental Risk Pool
Enclosures: TMLIRP Check& Estimate
Texas Municipal League Intergovernmental Risk Pool
1821 Rutherford Lane, First Floor • Austin, Texas 78754 • (512)491-2300 • (800)537-6655 Texas Only
P.O. Box 149194 • Austin, Texas 78714-9194
Y-/Ail A-A
Circle H Airboats LLC
QUOTE
Date. Bila.t17 334,247.7711
Oavte c}eparau Sy- RICKY(CELL 334•252•33T2) 8803 Highway 134
Ect Sian Dale ASAP Elba, AL. 36323
NAME Pari Arthur Fire Dept. CONTACT Captain Richard Malone
PHONE: 409-540-0233 EMAIL remaione65@gmai{.cOm
LENGTH SEAM SIDES TRANSOM POLYMER POLY INSTALL GRASS RAKE
3t8°
--
SCREWS
ITEM TOTAL
REMOVE ALL RIGGING,OLD POLY AND INSTALL NEW 318"POLY WITH SCREWS ON
CUSTOMER PROVIDED 18'HULL DAMAGED DURING HURRICANE HARVEY RELIEF
EFFORTS,
REPAIRS TO BOAT TRAILER TO INCLUDE REPLACING SIDE BOARDS WITH MARINE
GRADE CARPET ON EACH SIDE OF TRAILER. NEW ROLLERS WITH TREATED WOOD
COVERED WITH POLY BEHIND ROLLERS ON REAR OF TRAILER.
REPLACE LIGHT DAMAGED ON CAGE.
ALL PARTS AND MATERIAL SHIPPING CHARGES ARE INCLUDED IN QUOTE
QUOTE VALID FOR 30 DAYS Subtotalz,8a8.00
Ni-Sale3 TM(5A01 NIA
—MAOI:CI IECKS PAYABLE TO CIRCLE H ALRBOATS" TotalS 2,808,00 1
QUOTE ACCEPTED BY CUSTOMER isiatitr '-') .�—• DATE /
TERMS: "r
50%NON-REFUNDABLE DEPOSIT REQUIRED WHEN QUOTE 8 TERMS ARE ACCEPTED,'SIGNED BY CUSTOMER
USCG DOES NO_ T gu.Q' ,A HIM TO BE ASSIGNED TO AN INCOMPLETE BOAT OR HULL THAT IS PART OF A BOAT KIT
�„ \.
I DO (I DO NOT , CONSENT TO CIRCLE I1 At ATS TAGGING ME ON SOCIAL MEDIA OR THEIR WEBSITE.
{PLEASE RCL _ WITH PICTURES AND COMM S ELATED TO THE CONSTRUCTION OF MY CHA PRODUCT
TERMS ACCEPTED BY CUSTOMER - DATE 9-/ f -/ 2
SIGNED QUOTE SHOULD BE RET URNED WITH DEPOSIT WE APPRECIATE YOUR BUSINESS'
American Airboat Corporation
108 E. Lutcher Drive
Orange,TX 77632 Quote Number: 17-0122
USA Quote Date: Sep 18, 2017
Page: 1
Voice: 409-883-7725
Fax: 409-883-0100
PORT ARTHUR FIRE DEPARTMENT PORT ARTHUR FIRE DEPARTMENT
': ¢14LSlisY. � Y.( ..A.
Customer tD Goo' ru 'ayment Terms Sales Rep
PORT ARTHUR FIRE DEP 10/18/17 Prepaid
J
Quantity Description Unit Price Amount
18-00 FOOT — — -- ---- --- - -._—.
100.00 1,800.00
3/8" UHMW OIL IMPREGNATED SUPERSLICK POLYMER
"SPECIAL HIGH PERFORMANCE SILICONE IMPREGNATED
SUPER SLICK POLYMER. —*THIS IS AMERICAN AIRBOAT
PROPRIETARY BLEND.
7.00 POUND 22.75 159.25
ALUMINUM RIVET
1.00 BOAT DISASSEMBLY FEE 250.00 250.00
1.00 BOAT REASSEMBLY FEE 500.00 500.00
1.00 OLD POLY DISPOSAL FEE 60.00 60.00
3 20.00 LABOR HOUR 135.00 2,700.00
1.00 M►SC SHOP MATERIALS FEE 35.00 35.00
5.ub1 al 5,504 25
Sales Tax
TOTAL 5,:504.26
American Airboat Corporation
108 E. Lutcher Drive °
Orange, TX 77632 Quote Number: 17-0129
USA Quote Date: Sep 19, 2017
Page: 1
Voice: 409-883-7725
Fax: 409-883-0100
PORT ARTHUR FIRE DEPARTMENT PORT ARTHUR FIRE DEPARTMENT
PORT ARTHUR FIRE DEP -� Good Payne
10/19/17nt.Terms Sales Rep
; Prepaid
Quantity Description Unit Price I Amount
2.00 STOLTZ ROLLER TRAILER LOADING BOARD 95.00 190.00
1.00 IGNITION SWITCH 25.00 25.00
1.00 2200GPH BILGE PUMP 99.00 99.00
1.00 CUSTOM BILGE PUMP MOUNT • 35.00 35.00
1.00 1 BILGE PUMP AUTO-FLOAT SWITCH W/MOUNT 22.00 22.00
4.00 LABOR HOUR 135.00 540.00
1.00 MISC SHOP MATERIALS FEE 35.00 35.001,
•
•
-- - ---.....- a----- --- --
_. $u tQt J —__--9461 flfl
Sales Tax
TOTAL 946.00,.
r .. Circle H Airboats LLC
RECEIPT
Date: 10/19/2017 334.247.7711
8803 Highway 134
Elba, AL. 36323
NAME: Port Arthur Fire Dept. CONTACT: Captain Richard Malone
PHONE: 409-540-0233 EMAIL: rmalone@portarthur.com
LENGTH BEAM SIDES TRANSOM POLYMER POLY INSTALL GRASS RAKE
ITEM TOTAL
CUSTOM BUILT, HEAVY DUTY LIGHT SHROUD FOR LIGHT BAR WITH HYDRO TURF
STEP
POLY CARBONATE HIGH IMPACT/SCRATCH RESISTANT SHEET FOR EMERGENCY
LIGHTS
REPLACE LIGHT DAMAGED ON CAGE
PACK OF CAPSULE LIGHT BULBS FOR K.C. LIGHTS
PACK OF MINI BULBS FOR STARBOARD NAVIGATOR LIGHT
CAN OF RED PAINT
TORCTITE EXHAUST CLAMP TO REPLACE BROKEN ONE
LABOR HOURS: INSPECT AND REPLACE ALL OXIDIZED ELECTRICAL CONNECTIONS;
REROUTE FUEL FILL; INSTALL RIVNUTS AND SEAL ON RAKE EMERGENCY LIGHTS.
LABOR HOURS: REMOVE DENT IN HULL
34.6 GALLONS PREMIUM GAS
Subtotal $ 850.36
PAID I N FULL
AL Sales Tax(5%) N/A
Total $ 850.36
MASTERCARD **1880 Payment $ 850.36
Balance $0.00