HomeMy WebLinkAboutPR 20409: SUPPLEMENTAL REPAIRS RELATED TO THE RENOVATION OF THE EQUIPMENT SERVICES BUILDING City of
ort rthu��
Teru s
www.PortArthurTx.gov
INTEROFFICE MEMORANDUM
Date: August 7, 2018
To: The Honorable Mayor and City Council
Through: Harvey Robinson, Interim City Manager
From: Clifton Williams, Purchasing Manager
RE: P.R. 20409—Supplemental Repairs Related to the Renovation of the Equipment
Services Building
Introduction:
Staff is requesting City Council approval of P.R. No. 20409 authorizing supplemental repairs
related to the Renovation of the Equipment Services Building by SETEX Construction Corp of
Beaumont, Texas in the amount of$22,661.32.
Background:
The Equipment Services Building was damaged by the flooding caused by on Hurricane
Harvey. City Council approved Resolution No. 18-254 awarding SETEX Construction Corp
a contract in the amount of$96,067.11. In order to save money, some items were left off the
original proposal, but it has been evaluated by City staff that those items should be added.
Some items were also damaged during remediation. A Buyboard quote was received by
SETEX Construction Corp in the amount of$22,661.32.
Budget Impact:
Payment will be provided by funds received from insurance, Account No. 147-2300-901.32-
00, Project No. 082617 - Emergency Management Fund.
Recommendation:
Staff is requesting City Council approval of P.R. No. 20409 authorizing supplemental repairs
related to the renovation of the Equipment Services Building by SETEX Construction Corp of
Beaumont, Texas,through in the amount of$22,661.32.
"Remember,we are here to serve the Citizens of Port Arthur"
P.O.Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8182 X FAX 409.983.8294
P.R. No. 20409
08/08/2018 CEWJ
Page 1 of 3
RESOLUTION NO.
A RESOLUTION AUTHORIZING SUPPLEMENTAL REPAIRS
RELATED TO THE RENOVATION OF THE EQUIPMENT SERVICES
BUILDING BY SETEX CONSTRUCTION CORP. OF BEAUMONT,
TEXAS, THROUGH BUYBOARD COOPERATIVE CONTRACT NO.
520-16 (CORE), IN THE AMOUNT OF $22,661.32 FUNDING FROM
PROCEEDS RECEIVED FROM INSURANCE IN ACCOUNT NO. 147-
2300-901.32-00, PROJECT NO. 082617 - EMERGENCY
MANAGEMENT FUND.
WHEREAS, the Equipment Services Building was damaged by flooding from
Hurricane Harvey; and,
WHEREAS, the Equipment Services Building is currently inoperable due to the
damage caused by the flooding; and,
WHEREAS, per Resolution No. 18-254, the City Council authorized the
renovation of Equipment Services building in the amount of $96,067.11; and,
WHEREAS, supplemental repairs are required as a result of damage found from
remediation to the Water Service Center; and,
WHEREAS, SETEX Construction Corp. of Beaumont, Texas, has a
cooperative contract with Buyboard; and
WHEREAS, Chapter 271 of the Local Government Code allows a city, by
resolution of its governing body, to participate in cooperative purchasing programs,
such as Buyboard, a purchasing cooperative, as an alternative to a formal bid process;
and
WHEREAS, per Resolution No. 02-341, the City entered into an interlocal
agreement for cooperative purchasing with the Buyboard Cooperative Purchasing
Program ("Buyboard").
P.R. No. 20409
08/08/2018 CEW]
Page 2 of 3
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF PORT ARTHUR:
Section 1. That, the facts and opinions in the preamble are true and correct.
Section 2. That, the City Council hereby authorizes supplemental repairs
related to the renovation of the Equipment Services Building with SETEX Construction
Corp. of Beaumont, Texas, through BuyBoard Contract No. 520-16 (Core), in the
amount of $22,661.32, a copy of the estimate/quote is attached hereto as Exhibit "A".
Section 3. That, a copy of this caption be spread upon the Minutes of the City
Council.
READ, ADOPTED AND APPROVED on this day of August, A.D.,
2018, at a Regular Meeting of the City Council of the City of Port Arthur, Texas, by the
following vote: AYES:
Mayor: ,
Councilmembers: ,
NOES:
Derrick Ford Freeman, Mayor
ATTEST:
Sherri Bellard
City Secretary
P.R. No. 20409
08/08/2018 CEWJ
Page 3 of 3
APPROVED FOR ADMINISTRATION:
Harvey Robinson
Interim City Manager
Armando Gutierrez
Director of Public Works
A
Andrew Vasquez
Director of Finance
Clifto° Williams, CPPB
Purchasing Manager
AP
PROVEDAS TO FORM:
Val Tizeno
City Attorney
EXHIBIT "A"
6 --"millimiuu
SETE
CONSTRUCTION CORP.
"Strength in Construction"
LA License#54937
Mailing Address'
August 6, 2018
P.O. Box 20678
Beaumont, Texas 77720-0678 Cliff Williams
City of Port Arthur
es (409)842-8181 444 4th Street
• (409)842-2274 Port Arthur, Texas 77640
® setex@setexconstruction.corn
:. setexconstruction.com Project: "Port Arthur Garage"
General Contracting Subject: "Change Order#1"
Construction Management Dear Mr. Williams:
We are pleased to submit our proposal utilizing 520-16 BuyBoard Contract based on local
Design-Build CC1 and Coefficient of 1.3
Job Order Contracting Proposal Recap:
Facilities Maintenance Reception 107, Lounge 106,Toilet 105, Locker 104, Foreman 111
• Remove and replace storefront wall and door in Room 111
Commercial
• Add furring channel in Room 106
• Remove and replace lockers to match Room 104
Industrial • Remove and replace toilets and urinals in Room 105
Government Exclusions:
Healthcare Unforeseen items beyond scope.
We estimate approximately forty-five(30)working days upon material delivery
Infrastructure
Subtotal $ 22,108.60
Corporate Bond $ 552.72
Total Proposal Amount $ 22,661.32
Education
This pricing is based on normal hours Monday thru Friday 7:00am to 4:00pm. Please
contact us at 409-842-8181 at your convenience to go over this estimate.
Performing Arts
We trust the proposal meets with your approval and please advise us accordingly.
Historical
Respectfully submitted,
SETEX CONSTRUCTION CORP.
Michael Waidley
Project Manager
a
Established 1990
Price Proposal SpreadSheet - 18-0050-1
This proposal was prepared exclusively for TASB
Job Number: 18-0050-1
Job Name: Port Arthur Garage R1
Contractor: SETEX Construction
Certified Proposal Number: Yet to be certified
Date Created: 08/06/2018
Last Update: 08/06/2018
Proposal Value: $22,108.60
Construction Procurement Catalog: BEAUMONT,TX-Year 2018 Quarter 2
CSI Number Description Duration Quantity UOM UnitPrice Coefficient Line Total
08 Openings $2,879.84
08 05 05 10 3900 Door demolition, 1.00 Ea. $156.06 1.3000 $202.88
special doors, Standard
storefront swing Hours
door, remove
08 41 13 20 0200 Tube framing,for 96.00 L.F. $21.45 1.3000 $2,676.96
window walls and Standard
storefronts, Hours
aluminum,stock,
plain tube frame,
mill finish, 1-3/4"x
4-1/2"
09 Finishes $1,185.60
09 22 13 13 0300 Furring,ceilings,on 800.00 S.F. $1.14 1.3000 $1,185.60
steel,galvanized, Standard
7/8"channels, 16" Hours
OC
10 Specialties $11,887.59
10 05 05 10 5050 Selective 22.00 Opng. $17.42 1.3000 $498.21
demolition, lockers Standard
Hours
Proposal Total $22,108.60
CSI Number Description Duration Quantity UOM UnitPrice Coefficient Line Total
10 51 13 10 1100 Lockers,ventilated, 22.00 Ea. $398.23 1.3000 $11,389.38
athletic,1-tier,12"x Standard
18"x 72",welded Hours
12 Furnishings $1,711.42
12 35 70 13 2500 Casework,wall 4.00 L.F. $329.12 1.3000 $1,711.42
cabinets, Standard
laminated plastic Hours
22 Plumbing $4,444.15
22 05 05 10 1420 Fixture,water 3.00 Ea. $46.58 1.3000 $181.66
closet,wall Standard
mounted,selective Hours
demolition
22 05 05 10 1 500 Fixture,urinal,floor 2.00 Ea. $81.34 1.3000 $211.48
mounted,selective Standard
demolition, Hours
includes 10'piping
22 42 13 13 3362 Water closet,bowl 3.00 Ea. $710.22 1.3000 $2,769.86
only,floor Standard
mounted,tankless, Hours
with floor outlet,
ADA,1.28 gpf,
includes flush
valve and seat
22 42 13 16 3100 Urinal,wall hung, 2.00 Ea. $492.75 1.3000 $1,281.15
vitreous china,with Standard
self-closing valve, Hours
siphon jet type
Proposal Total $22,108.60
Price Proposal SpreadSheet-08/06/2018