Loading...
HomeMy WebLinkAboutPR 20412: RATIFY EMERGENCY REPAIRS OF SCREW PUMPS AT MAIN WASTEWATER TREATMENT PLANT City of 00'1 rthur Texas INTEROFFICE MEMORANDUM UTILITY OPERATIONS DEPARTMENT-ADMINISTRATION Date: August 9, 2018 To: Harvey Robinson, Interim City Manager From: Dr. Hani Tohme, P.E., Director of Utilities RE: Proposed Resolution No. 20412—Screw Pump Repair Nature of the Request: The purpose of this resolution is to ratify emergency repairs approved by the Interim City Manager. Through normal usage, the condition of the screw pumps at the Main Wastewater Treatment Plant have deteriorated and one of them is in need of repair. Failure of these pumps could cause a potential health hazard. Quotes were requested from three (3)vendors and received from two (2) vendors. Coastal Pump Services of Rosharon, Texas submitted the lowest, most responsible quote of $44,085.00 to repair one screw pump. Funding is available in Water Utilities Account No. 410-1256-532.42-00, Equipment Maintenance. Staff Analysis, Considerations: • Staff will review the repairs and maintain the screw pump after the repairs are made. Budget Considerations: Funding is available in Water Utilities Account No. 410-1256-532.42-00, Equipment Maintenance. Recommendation: I recommend that the City Council approve Proposed Resolution No. 20412 to authorize the repair of the screw pump in the amount of$44,085.00 at the Main Wastewater Treatment Plant. P.R. No. 20412 8/28/18 ds/bw RESOLUTION NO. A RESOLUTION RATIFYING EMERGENCY REPAIRS TO THE SCREW PUMP AT THE MAIN WASTEWATER TREATMENT PLANT FROM COASTAL PUMP SERVICES, INC. OF ROSHARON, TEXAS, WITH A PROJECTED BUDGETARY IMPACT OF $44,085.00; FUNDING IS AVAILABLE IN UTILITIES ACCOUNT NO. 410-1256-532.42-00, EQUIPMENT SERVICES. WHEREAS, due to normal usage, one of the screw pumps at the Main Wastewater Treatment Plant has failed and was in need of significant repair in order to avoid a potential hazard to public health; and, WHEREAS, three (3) quotes were solicited and two (2) quotes were received, with Coastal Pump Services, Inc. of Rosharon, Texas submitting the lowest, responsible quote of $44,085.00 (as shown in Exhibit"A"); and, WHEREAS, the screw pumps are a critical component of the wastewater treatment process and need to be repaired as quickly as possible to ensure public health and safety, and the Interim City Manager granted emergency approval (Exhibit"B")to proceed with the repair; and, WHEREAS, it is further authorized pursuant to Section 252.022(a)(2), of the Texas Local Government Code, a procurement necessary to preserve or protect the public health or safety of the municipality's residents. This procurement is also authorized pursuant to Section 252.022(a)(3), of the Texas Local Government Code, because of unforeseen damage to public machinery, equipment, or other property; and, WHEREAS, these repairs are necessary to the proper functioning of the treatment plant, without these repairs other equipment would eventually fail to function properly, potentially causing more damage to other treatment units. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT, the facts and opinions in the preamble are true and correct; and, THAT, the City Council of the City of Port Arthur hereby ratifies repair of a screw pump authorized by the City Manager for the amount of$44,085.00; and. THAT, a copy of the caption of this Resolution be spread upon the Minutes of the City Council. READ,ADOPTED, AND APPROVED this the_day of , A.D. 2018 at a meeting of the City of Port Arthur, Texas by the following vote: Ayes: Mayor: Councilmembers: Noes: Mayor Derrick Freeman ATTEST: City Secretary Sherri Bellard APPROVED AS TO FORM: APPROVED FOR ADMINISTRATION: Vid Valecia Tizeno Harvey Robinson City Attorney Interim City Manager APPROVED AS FOR AVAILABILITY OF FUNDS: Andrew asquez, CPA Director of Finance Hani Tohme, P.E. Interim Director of Water Utilities / Clift+n Williams, CPPB Purchasing Manager Exhibit "A" (Quotes) Fr3,D43 Coastal Pump Services, Inc. ga- a qv - 01 i Quote C Date: 7/12/18 S.O. #: 12226 Salesman: CW Customer P.O. #: Customer: City of Port Arthur Contact: Donna King Phone: 409-226-5733 Repair Location:WV/TP,Screw Pump E-Mail: Donna.king@portarthurtx.gov We are pleased to quote the following: 1-Screw Pump Shaft&Bearing Replacement INCLUDING: Remove Shaft and Bearing from Screw Pump in the Field and bring to Coastal Pump Services. Disassemble and Inspect all of the Parts. Replace with New Shaft and Pillow Block Bearing. Pillow Block Bearing to Include; Bearing Housing, 2 Ball Bearings, 2 Lip Seals, Gaskets, Locking Nut & Washer, 2 Shims, and Miscellaneous Nuts & Bolts. Clean, Prime, and Paint all of the Parts. Reassemble and fill with proper Lubrication. Install in the Field and Test Run. Quoted Price: $44,085.00 NOTE: The Bearing Unit had major failure damaging the Shaft and everything in the bearing housing. The Bearing housing is sold as one unit from the manufacture and is most of the cost shown above. I also attached pictures of the damages in the E-Mail. TERMS: Net 30 days WARRANTY: New equipment will be warranted for ONE YEAR Manufactures'warranty or other specified.Rebuilt equipment will be warranted for ONE YEAR based on workmanship, parts and labor. All electrical components on motor's (rewind/recondition)are subject to inspection for cause of failure. Quoted price valid for 30 days and does not include any applicable taxes. To expedite service,please sign form,include purchase order number,and fax back to Coastal Pump Services.Any equipment left over 90 days without decision is subject to be discarded. Thank you for your consideration. Please feel free to contact us with any questions. Customer Chad Wendt Customer's Name (Print) Date P.O. BOX 1277,Manvel,TX 77578 Office: 281-915-5388 Office Fax: 281-915-5138 Exhibit "B" (Emergency Authorization Memo) C lel 1/t f•IY• /,ll'11�!" i� VTItiii°f r' li uu r ]i'1Cl5 INTEROFFICE MEMORANDUM UTILITY OPERATIONS DEPARTMENT-WASTEWATER TREATMENT DIVISION Date: August 6, 2016 To: Harvey Robinson. Interim City Manager, Director of Utility Operations From: Donna King, Superintendent WWT RE: Main WWTP Screw Pump Currently, one of our Screw Pumps at the Main Wastewater Treatment Plant is out of commission due to mechanical problems. These pumps are vital in the process of pumping the wastewater to the Aeration Basin there are a total of three Screw Pumps. With one down two will keep the Plant Operating without wastewater overflowing onto Plant grounds, but if another goes down we will not be able to stop the flow. It will require renting a pump at $400/day until pumps are repaired. This Emergency repair is warranted for Public Health and to not be noncompliant with TCEQ. The estimated cost of the repair is $44,085.00 from Coastal Pump Services; Inc. Requisition #209342 Approved: .,i.-------- Harvey Robinson Interim City manager "Remember we are here to serve the Citizens of Port Arthur" P.O BOX 1089 •PORT ARTHUR,TEXAS 77641-1089 •409/983-8101 • FAX 409/982-6743