Loading...
HomeMy WebLinkAboutPR 20522: DESIGNING OF FUEL ISLAND FOR PORT ARTHUR TRANSIT (PAT) City of Port Arthur Transit Department Memorandum To: Harvey Robinson,Interim City Manager Cc: Ron Burton,Assistant City Manager From: Ivan Mitchell,Transit Manager Date: _ October 10,2018 Re: P.R.20522—Designing of Fuel Island for Port Arthur Transit(PAT) Nature of Request:Authorize the City Manager to negotiate a contract with Soutex,Inc., for engineering and design services to reconfigure Port Arthur Transit's(PAT)propane station for new gasoline and diesel fueling options while retaining propane fueling capacity. Background: Rainwater intrusion into PAT's underground diesel fueling tank has made the existing system inoperable while the operational need for gasoline and diesel continue. If PAT experiences a fuel shortage,there is a potential for service delays and/or cuts for both fixed route and paratransit services. These delays and/or cuts to transit service have a serious impact on customers whose critical dialysis and other medical needs are dependent of PAT's transportation services. While PAT addresses the water intrusion issue for remediation,it has leased an above ground tank from Spidle& Spidle,Inc. Port Arthur Transit(PAT)intends to retain a qualified professional firm to provide engineering design services for a fuel island upgrade at its maintenance facility located at 325 Dallas Avenue,Port Arthur,Texas. PAT has an existing propane fueling station located at 325 Dallas Avenue. PAT will be retiring most vehicles and equipment that utilize propane within the next 6 months. In order to accommodate the utilization of gasoline and diesel vehicles PAT is looking to convert the propane facility so it will provide diesel and gasoline in addition to the existing propane. Recommendation: It is recommended that the City Council approve proposed P.R. 20522 for engineering and design services to reconfigure Port Arthur Transit's(PAT)propane station for new petroleum and diesel fueling while retaining the propane fueling capacity. Budgetary/Fiscal Effect: Funding to pay for the design and engineering services is available in account 401-1509-561.82-00. Ivan Mitchell, Transit Manager P.R. 20522 10/09/2018 IM RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO NEGOTIATE A CONTRACT WITH SOUTEX INC. OF PORT ARTHUR,TEXAS FOR ENGINEERING AND DESIGN SERVICES FOR THE RECONFIGURATION OF PORT ARTHUR TRANSIT'S PROPANE STATION. FUNDING IS AVAILABLE IN ACCOUNT 401- 1509-561.82-00. WHEREAS, Port Arthur Transit(PAT) has received funding from the FTA and TxDOT to reconfigure the propane station located at 325 Dallas Ave., Port Arthur, Texas; and WHEREAS, Port Arthur Transit issued a Request for Qualifications (RFQ) from engineering firms for engineering and design services to reconfigure its propane station; and WHEREAS, six (6) qualification packages were received, and have been evaluated by Purchasing, Engineering and PAT, a copy of the qualifications tabulation is attached hereto as Exhibit"A"; and WHEREAS, Port Arthur Transit(PAT) is converting the propane facility to diesel and El0 (10% Ethanol and 90% unleaded gasoline), in addition to retaining the existing propane; and WHEREAS, Soutex Inc. of Port Arthur, Texas, was selected based on the evaluation of the qualifications packages. NOW,THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT, the facts and opinions in the preamble are true and correct. THAT, the City Manager is hereby authorized to enter into contract negotiations with Soutex, Inc. of Port Arthur, Texas, for engineering and design services of PAT's propane station. THAT, a copy of the caption of this Resolution be spread upon the minutes of the City Council. READ,ADOPTED AND APPROVED this day of October, 2018 at a Regular Meeting of the City of Port Arthur, Texas by the following vote: AYES: AYES: Mayor: Councilmembers: P.R. 20522 10/09/2018 IM NOES: Mayor ATTEST: City Secretary APPROVED AS TO FORM: i.' S 04 4e k a(�of City ;.erne APPROVED FOR ADMINISTRATION: City Manager Transit Manager APPROVE AS VAILABILTY OF FUNDS: M L (I — Director o Finance (Account No. 401-1509-561.82-00) * Lid", , Purchasing Manager P.R. 20522 • 10/09/2018 IM Exhibit "A" '".C' ^ n V V l'I v 'Cit) \\�� I •• cn O\ `C x'11 2• P O c" 0 0 a c r go. n) r'J O s• } c. W ,-. C5 '*.0▪ co o LT, 0 0 > R w N °�° +� v, 0 0 0 ; 0 Z. tz y _ o 5 n a � � R" y U4 c(n N Ui � .. = :4 17 L.T1 '.-, 0 C COn Ui O O O n w _ . A) O cn oo Xc Cn o o• C k c. o • N U-i Ln 00 ~ i N N N Z N O CP O O o uiO ,n y O N Cn U O O O % v' SC VI U .. n cn 0 0 0 rD R v