Loading...
HomeMy WebLinkAboutPR 20571: TMLIRP CLAIM DAMAGES TO CITY OF PORT ARTHUR TRASH UNIT #2206 / E 4 rx%- City of Cin• ort rthtrr- - Texas INTEROFFICE MEMORANDUM Office of Safety & Risk Management Date: November 2, 2018 To: Harvey Robinson, Interim City Manager From: Trameka A. Williams, Acting Asst. Director of Human Reso1 RE: A Resolution Approving a Property Damage Settlement in the Amount of$11,233.58 for Damages to City of Port Arthur Trash Unit#2206 Nature of the request: On September 27, 2018, Trash Unit #2206 (2018 Freightliner Grapple Truck) was backed into by a vendor's truck damaging the grill and hood of the unit at the landfill. Staff Analysis, Considerations: The City has Physical Damage insurance coverage through Texas Municipal League Intergovernmental Risk Pool (TML) with a $2,500.00 deductible. TML has offered the City a settlement of$11,233.58, less the $2,500.00 deductible, making the final settlement offer $8,733.58. This amount is sufficient to cover the estimated property damages for Unit #2206. If additional damages are discovered, TML may issue a supplemental payment. TML will attempt to obtain subrogation recoveries on behalf of the City of Port Arthur. Recommendation: I recommend approval of Proposed Resolution No. 20571 authorizing the property damage settlement against TML for damage sustained to Trash Unit #2206 (2018 Freightliner Grapple Truck). TML has offered to settle the claim for $11,233.58, less the $2,500.00 deductible, making the final settlement offer $8,733.58. This is considered a fair and reasonable settlement. TML will attempt to obtain subrogation recoveries on behalf of the City of Port Arthur. Budget Considerations: The funds received will be deposited in the Insurance Proceeds Account#625-0000-369.85-00. "Remember we are here to serve the Citizens of Port Arthur" P.R. No. 20571 11/02/18 TAW RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE SETTLEMENT OF A PHYSICAL DAMAGE CLAIM IN THE AMOUNT OF $11 ,233.58 MADE AGAINST TEXAS MUNICIPAL LEAGUE INTERGOVERNMENTAL RISK POOL (TML) AS A RESULT OF PROPERTY DAMAGE TO TRASH UNIT #2206 WHEREAS, ON September 27, 2018, Trash Unit #2206 (2018 Freightliner Grapple Truck) was backed into by a vendor's truck damaging the grill and hood of the unit at the landfill; and, WHEREAS, as a result of the damage, a claim was filed with Texas Municipal League Intergovernmental Risk Pool (TML); and, WHEREAS, TML has offered to settle the claim for $11,233.58, less the Physical Damage deductible amount of $2,500.00, making the final settlement offer $8,733.58, which is considered a fair and reasonable settlement. TML will attempt to obtain subrogation on behalf of the City of Port Arthur. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR, TEXAS: Section 1. That. the facts and opinions in the preamble are true and correct. Section 2. That, the City Manager is hereby authorized to execute settlement in the amount of $11,233.58, less the Physical Damage deductible amount of $2,500.00, making the final settlement offer $8,733.58. TML will attempt to obtain subrogation recoveries on behalf of the City of Port Arthur. P.R. No. 19772 11/02/18 TAW Page 2 of 2 Section 3. That, a copy of this Resolution be spread upon the minutes of the City Council. READ, ADOPTED, AND APPROVED this day of , AD, 2018, at a Meeting of the City Council of the City of Port Arthur, Texas, by the following vote: AYES: Mayor , Councilmembers NOES: Derrick Ford Freeman, Mayor ATTEST: Sherri Bellard, City Secretary APPROVED AS TO FORM: /17,c,e Val Tizeno, Attorney APPROVED FOR ADMINISTRATION: Harvey Robinson, Interim City Manager TML INTERGOVERNMENTAL RISK POOL Workers' Compensation • Property • Liability October 29, 2018 Elizabeth Diaz City of Port Arthur PO Box 1089 Port Arthur, TX 77641-1089 RE: TMLIRP Fund Member: City of Port Arthur Date of Loss: September 27, 2018 TMLIRP Claim No: A00000000088637 VIN No: 3ALHG5FE8JDKA1376 Dear Elizabeth: Enclosed is TMLIRP check in the amount of $8,733.58 ($11,233.58 less $2,500.00 deductible), as agreed for the above-referenced claim. Should you have any questions or concerns, please feel free to contact me. Sincerely, 44thye1 Helen Brown Fast Track Claims Specialist Texas Municipal League Intergovernmental Risk Pool Encl: Check, Estimate Texas Municipal League Intergovernmental Risk Pool 1821 Rutherford Lane, First Floor • Austin, Texas 78754 • (512)491-2300 • (800)537-6655 Texas Only P.O. Box 149194 • Austin, Texas 78714-9194 Date: 10/26/2018 12:37 AM Estimate ID: 2978100074 Estimate Version: 0 Committed Profile ID: * PDA TX- Heavy Property Damage Appraisers (PDA Beaumont) P.O. Box 445, Bridge City,TX 77611 (409) 833-1733 Fax: (409) 813-8575 Email: pdabeaumont@pdaorg.net *Not An Authorization For repair* Read disclaimers following appraisal calculations . This estimate has been prepared utilizing the Mitchell Medium/Heavy Duty Truck Database. Damage Assessed By: David Fuller Appraised For: Helen Brown Classification: Field Condition Code: AVERAGE Type of Loss: Collision Date of Loss: 9/27/2018 Deductible: 2,500.00 File Number: 2978100074 Claim Number: AU88637 Insured: City of Port Arhtur Owner: City of Port Arhtur Address: PO Box 1089, Port Arthur,TX 77641 Telephone: Work Phone: (409) 504-8112 Mitchell Service: 911000 Description: 18 2018 FREIGHTLINER GRAPPLE TRUCK Vehicle Production Date: 11/17 VIN: 3ALHG5FE8JDKA1376 License: 1387454 TX Mileage: 11,943 OEM/ALT: A Parts Profile: Beaumont Parts Profile Version: 2 Color: WHITE Line Entry Labor Line Item Part Type/ Dollar Labor Item Number Type Operation Description Part Number Amount Units 1 900500 BDY* REMOVE/REPLACE FRONT CHROME BUMPER ASSEMBLY ** QUAL REPL PART 738.79 * 1.5* 2 900500 BDY* REMOVE/REPLACE LEFT FRONT BUMPER BRACKET New 196.75 * 0.3* 3 900500 BDY* REMOVE/REPLACE RIGHT FRONT BUMPER BRACKET New 196.75 * 0.3* 4 900500 BDY* REMOVE/REPLACE FRONT BUMPER SUPPORT New 132.91 * INC* 5 900500 BDY* REMOVE/REPLACE GRILLE SURROUND ASSEMBLY ** QUAL REPL PART 1,129.96 * 3.0* 6 REF REFINISH/REPAIR GRILLE SURROUND ASSEMBLY 1.2* 7 900500 BDY* REMOVE/REPLACE FRONT GRILLE NAME PLATE New 59.95 * 0.3* 8 900500 BDY* REMOVE/REPLACE LOWER GRILLE SURROUND ** QUAL REPL PART 372.79 * 1.0* 9 REF REFINISH/REPAIR LOWER GRILLE SURROUND 1.8* 10 900500 BDY* REMOVE/REPLACE HOOD ASSEMBLY ONE PIECE New 1,895.00 * 8.0* 11 REF REFINISH/REPAIR HOOD ASSEMBLY ONE PIECE 6.5* 12 900500 BDY* REMOVE/REPLACE HOOD HINGE ASSEMBLY New 588.59 * 0,5* 13 900500 BDY* REMOVE/REPLACE LEFT HEADLAMP ASSEMBLY New 577.56 * 0.5* 14 900500 MCH* REMOVE/REPLACE FRONT RADIATOR CORE SUPPORT ** QUAL REPL PART 1,141.03 * 2.7* 15 900500 MCH* REMOVE/REPLACE CHARGE AIR COOLER New 815.66 * 1.0* 16 900500 MCH* REMOVE/REPLACE CONDENSER ** QUAL REPL PART 181.90 * 1.5* 17 900500 MCH* REMOVE/REPLACE EXTENDED DUTY ANTIFREEZE 10@12.60 New 125.96 * INC* 18 900500 MCH* REMOVE/REPLACE FREON New 30.48 * INC* 19 936007 ADD'L COST Shop Materials 65.00 * 20 AUTO ADD'L COST Paint/Materials 370.50 * 21 AUTO ADD'L COST Hazardous Waste Disposal 3.50 * ESTIMATE RECALL NUMBER: 10/26/2018 00:36:40 2978100074 Mitchell Data Version: OEM: OCT_18_V Alternate Parts: 10/25/2018 23:52:20 Copyright(C) 1994- 2018 Mitchell International Page 1 of 3 Software Version: 7.1.232 All Rights Reserved Date: 10/26/2018 12:37 AM Estimate ID: 2978100074 Estimate Version: 0 Committed Profile ID: * PDA TX- Heavy * - Judgment Item Remarks ASSIGNMENT RECEIVED ON 10/18/18 AND INSPECTED ON 10/18/18 AND COMPLETED ON 10/25/18. IMPACT TO THE FRONT AND LEFT FRONT CORNER.FRONT BUMPER, GRILLE,HOOD,CONDENSER AND RADIATOR AND COOLER DAMAGED AND LEFT FENDER DENTED AND BENT IN.FRONT SUPPORT BENT AND LF LAMP. Estimate Totals Add'I Labor Sublet I. Labor Subtotals Units Rate Amount Amount Totals II. Part Replacement Summary Amount Body 15.4 85.00 0.00 0.00 1,309.00 T Taxable Parts 8,184.08 Refinish 9.5 85.00 0.00 0.00 807.50 T Mechanical 5.2 95.00 0.00 0.00 494.00 T Total Replacement Parts Amount 8,184.08 Taxable Labor 2,610.50 Labor Summary 30.1 2,610.50 III. Additional Costs Amount IV. Adjustments Amount Taxable Costs 439.00 Insurance Deductible 2,500.00- Total Additional Costs 439.00 Customer Responsibility 2,500.00- Paint Material Method: Rates Init Rate = 39.00 , Init Max Hours = 99.9, Addl Rate = 0.00 I. Total Labor: 2,610.50 II. Total Replacement Parts: 8,184.08 III. Total Additional Costs: 439.00 Gross Total: 11,233.58 IV. Total Adjustments: 2,500.00- Net Total: 8,733.58 THIS ESTIMATE HAS BEEN PREPARED BASED ON THE USE OF REPLACEMENT PARTS SUPPLIED BY A SOURCE OTHER THAN THE MANUFACTURER OF YOUR MOTOR VEHICLE. WARRANTIES APPLICABLE TO THESE REPLACEMENT PARTS ARE PROVIDED BY THE MANUFACTURER OR DISTRIBUTOR OF THESE PARTS RATHER THAN THE MANUFACTURER OF YOUR VEHICLE. Point(s) of Impact 12 Front Center(P), 11 Left Front Corner(S) ESTIMATE RECALL NUMBER: 10/26/2018 00:36:40 2978100074 Mitchell Data Version: OEM: OCT_18_V Alternate Parts: 10/25/2018 23:52:20 Copyright(C) 1994- 2018 Mitchell International Page 2 of 3 Software Version: 7.1.232 All Rights Reserved