HomeMy WebLinkAboutPR 20539: SUPPLEMENTAL REPAIRS RELATED TO THE RENOVATION OF THE OPERATION CENTER 40. City of
of t rthur
www.PortArthurTx.gov
INTEROFFICE MEMORANDUM
Date: November 13, 2018
To: The Honorable Mayor and City Council
Through: Harvey Robinson, Interim City Manager
From: Clifton Williams, Purchasing Manager
RE: P.R. 20539—Supplemental Repairs Related to the Renovation of the Operation
Center
Introduction:
Staff is requesting City Council approval of P.R.No. 20539 authorizing the supplemental
repairs related to the renovation of the Operation Center by SpawGlass Construction Corp of
Beaumont, Texas in the total amount of$55,632.65.
Background:
The Operation Center was damaged by the flooding caused by Hurricane Harvey. Due to the
extensive damage, the Operation Center is currently not in use. City Council approved
Resolution No. 18-253 awarding SpawGlass the contract to renovate the Operation Center in
the amount of$200,301.00. Once remediation began, some items that SpawGlass intended to
reuse were damaged during the remediation of the building, and the ceiling grid in the
bathroom needs to be removed and replaced. Data drops are needed for the building and an
upgrade to the IT room. The Parks Department storage area located in Bay area was not
addressed in the previous quote. The cost for this supplemental work is $40,082.65. Public
Works is requesting to add three additional offices for the supervisors that will be funded by
their budget in the amount of $15,550. A Buyboard quote for the additional work was
received from SpawGlass Construction Corp in the total amount of$55,632.65.
Budget Impact:
$40,082.65 will be provided by funds received from insurance, Account No. 147-2300-
901.32-00, Project No. 082617 - Emergency Management Fund and $15,550.00 will be
provided from Account #001-1206-531.32-00 — Public Works Building Maintenance
Account
"Remember,we are here to serve the Citizens of Port Arthur"
P.O.Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8182 X FAX 409.983.8294
Recommendation:
Staff is requesting City Council approval of P.R. No. 20539 authorizing the supplemental
repairs related to the renovation of the Operation Center by SpawGlass Construction Corp of
Beaumont, Texas in the total amount of$55,632.65.
"Remember,we are here to serve the Citizens of Port Arthur"
P.O.Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8182 X FAX 409.983.8294
P.R. No. 20539
11/13/2018 CEWJ
Page 1 of 2
RESOLUTION NO.
A RESOLUTION AUTHORIZING SUPPLEMENTAL REPAIRS FOR
THE RENOVATION OF THE OPERATION CENTER BY SPAWGLASS
CONSTRUCTION CORP OF BEAUMONT, TEXAS THROUGH
BUYBOARD COOPERATIVE CONTRACT NO. 520-16 EZ1QC, IN THE
AMOUNT OF $55,632.65. FUNDING FROM PROCEEDS RECEIVED
FROM INSURANCE (ACCOUNT NO. 147-2300-901.32-00, PROJECT
#082617) EMERGENCY MANAGEMENT FUND ($40,082.65) AND
ACCOUNT NO. 001-1206-531.32-00 PUBLIC WORK BUILDING
MAINTENANCE ($15,550.00)
WHEREAS, the Operation Center was damaged by flooding from Hurricane Harvey;
and,
WHEREAS, the Operation Center is currently not is use due to the damage caused by
the flooding; and,
WHEREAS, per Resolution No. 18-253, the Council awarded SpawGlass the contract to
renovate the Operatione Center in the amount of$200,301.00; and,
WHEREAS, supplemental repairs are required as a result of damage found from
remediation of the Operation Center; and,
WHEREAS,three additional Public Works supervisor offices will be added; and,
WHEREAS, SpawGlass Construction Corp has a cooperative contract with Buyboard;
and,
WHEREAS, Chapter 271 of the Local Government Code allows a city, by resolution of
its governing body,to participate in cooperative purchasing programs, such as Buyboard, a
purchasing cooperative, as an alternative to a formal bid process; and
WHEREAS, per Resolution No. 02-341, the City entered into an interlocal agreement
for cooperative purchasing with the Buyboard Cooperative Purchasing Program ("Buyboard").
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF PORT ARTHUR:
Section 1. That, the facts and opinions in the preamble are true and correct.
Section 2. That, the City Council hereby authorizes the supplemental repairs related
to the renovation of the Operation Center with SpawGlass Construction Corp through Buyboard
in the amount of$55,632.65, a copy of the estimate/quote is attached hereto as Exhibit"A".
P.R. No. 20539
11/13/2018 CEWJ
Page 2 of 2
Section 3. That, a copy of this caption be spread upon the Minutes of the City
Council.
READ, ADOPTED AND APPROVED on this day of November, A.D., 2018,
at a Regular Meeting of the City Council of the City of Port Arthur, Texas, by the following
vote:
AYES: Mayor: ,
Councilmembers: ,
NOES: .
Derrick Ford Freeman, Mayor
ATTEST:
Sherri Bellard
City Secretary
APPROVED AS TO FORM:
04 WI (F6f
al f,r -no
City ' ttorn
APPROVED FOR ADMINISTRATION:
Harvey Robinson Armando Gutierrez
Interim CitManager Director of Public Works
,vty,..i /7:1>/:/...- e_46,t.6.,41,,,,,
Andrew Vasquez Clifton Williams, CPPB
Director of Finance Purchasing Manager
EXHIBIT "A"
•
SpawGlass Bui ing Services
/.i' /- J7"m E FI ,i- 1 •
f
SpawGlass Building Services
350 Pine Street,Ste. 310-Beaumont,Texas 77701 -Phone(409)681-4547
Answering Service-877-206-0944
Proposal
BuyBoard Contract U 520-16 ez1QC
September 18,2018
Clifton Williams
City of Port Arthur
102 H.O. Mills Blvd.
Port Arthur Texas 77640
Re: Repair of existing storage and IT room areas,including rough carpentry,insulation,new wall mounted hvac unit,data,and
various plumbing items.
SpawGlass Job No.:
Address of Service: 102 H.O.Mills Blvd.
Dear Mr. Williams,
SpawGlass Construction Corp. is pleased to offer our proposal to perform the scope as described in the following inclusions:
I. INCLUSIONS .... .
We have estimated:
1) Demo(1)storage area including existing electrical
2) Repair(1)storage area with connected side storage area with 11/32"plywood
3) Repair(1)bathroom complete with(1) new sink,exhaust fan and toilet
4) Repair(1)Parks&Rec.storage area with 11/32"plywood,complete with new plywood door
5) Repair IT room; install 11/32"plywood on walls,and replace wall mounted AC unit,replace rotted
studs, insulate walls
6) Repair(1)Parks&Rec.storage area(in last bay)with 11/32" plywood,complete with new plywood
door and work bench/counter to match previous layout
7) Install new Data drop to parks and rec office area
8) All labor,supervision,insurance,permit and dumpsters
9) Clean all scope related trash and dipose of in SpawGlass furnished dumpsters
Cost of Service $ 22,438.00
Sales Tax(8.25%) TAX EXEMPT
Total Cost of Service $ 22,438.00
II. EXCLUSIONS
1)Any additional areas needing repair
2) State tax/Bonding/Permit Cost
3) Lighting/New electrical outlets conduits or wiring
4) Architectural or standard doors/hardware
5) Painting
6) Anything not specifically listed in the inclusions above is specifically excluded.
III. OWNER-SUPPLIED
Any work performed outside of this scope of work is to be considered a change order and paid in addition to the stated contract amount.This
offer is subject to arrangements being made,which are satisfactory to Contractor,for payment of the contract sum and security thereof.
Note:This proposal is valid for thirty(30)days only.
9/18/2018
Josh Baker Date Clifton Williams Date
SpawGlass Construction Corp. City of Port Arthur
SpawGlass Building Services
350 Pine Street, Ste. 310- Beaumont,Texas 77701 - Phone(409)681-4547
Answering Service-877-206-0944
Proposal
Buy Board#: 520-16 ez1QC
September 26, 2018
Clifton Williams
City of Port Arthur
201 H 0 Mills Blvd.
Port Arthur Texas 77640
Re: New data drops for Operations Center Building (Office Area)
Address of Service: 201 HO Mills Blvd.
Dear Mr. Williams,
SpawGlass Construction Corp. is pleased to offer our proposal to perform the scope as described in the following inclusions:
I. INCLUSIONS
We have estimated:
1 Repair and remount existing data drops(cat 6) in all office areas of Operations Building
2 (21)drops total with(3)drops at the new office area
3 Furnish and install new fiber shelf and patch panel in IDF closet.
4 Terminate test and label all newly installed data drops.
5 All SpawGlass insurance,supervision and coordination with City of Port Arthur IT department
Cost of Service $ 5,412.65
Sales Tax(8.25%) TAX EXEMPT
Total Cost of Service $ 5,412.65
II. EXCLUSIONS
1 Any additional areas needing drops
2 State tax
3 Building permit cost(permit to be pulled for$0)
4 New cabling at existing offices, replacement of items currently mounted in IT IDF room
III. Notes
Existing data cabling to be reused where it is currently installled, new cabling only for areas not currentlyn constructed
(3) new offices
Any work performed outside of this scope of work is to be considered a change order and paid in addition to the stated contract
amount.This offer is subject to arrangements being made, which are satisfactory to Contractor, for payment of the contract sum and
security the-eof.
Note: This proposal is valid for thirty(30)days only.
9/26/2018
Josh Baker Date Clifton Williams Date
SpawGlass Construction Corp. City of Port Arthur
spawGlass Building Services
SpawGlass Building Services
350 Pine Street, Ste. 310- Beaumont,Texas 77701- Phone(409) 681-4547
Answering Service-877-206-0944
Proposal
September 18, 2018
BuyBoard Contract*1520-16 ez1QC
Clifton Williams
City of Port Arthur
102 H 0 Mills Blvd.
Port Arthur Texas 77640
Re: Additional work in Operations Center items due to work during building remediation and unforeseen existing
conditions.
SpawGlass Job No.: 4018216.05
Address of Service: 102 H 0 Mills Blvd.
Dear Mr. Williams,
SpawGlass Construction Corp. is pleased to offer our proposal to perform the scope as described in the following inclusions:
I. INCLUSIONS
We have estimated:
1) Rebuild portion of wall that was removed during remediation(rotted)
2) Fabricate and Install new wood transoms @ interior office spaces and paint to match wall color
3) Re-Install existing lockers(exact quantity to be verified in field)
4) Demolish ceiling grid In womens bathroom
5) Repair damaged/corroded interior door frame
6) All labor,supervision,insurance and dumpsters
7) Clean all scope related trash and dipose of in SpawGlass furnished dumpsters
Cost of Service $ 12,232.00
Sales Tax(8.25%) TAX EXEMPT
Total Cost of Service $ 12,232.00
II. EXCLUSIONS
1) Any additional areas needing repair
2) State tax or Bonding
3) New electrical cabinet
4) Building permits by owner if required
5) New lockers
6) Paint touch up or repair of existing lockers
III. OWNER-SUPPLIED
Any work performed outside of this scope of work is to be considered a change order and paid in addition to the stated contract
amount.This offer is subject to arrangements being made,which are satisfactory to Contractor,for payment of the contract sum and
security thereof.
Note:This proposal is valid for thirty(30)days only. ***SpawGlass will make every effort to install the existing lockers in a
quality manner, but cannot guaranty functionality of all lockers due to damage during the remediation process.***
9/18/2018
Josh Baker Date Clifton Williams Date
SpawGlass Construction Corp. City of Port Arthur
spawaass
Building Services
SpawGlass Building Services
350 Pine Street,Ste.310-Beaumont,Texas 77701-Phone(409)681-4547
Answering Service-877-206-0944
Proposal
August 31,2018
BuyBoard Contract a 520-16 ez1QC
Clifton Williams
City of Port Arthur
102 H.O.Mills Blvd.
Port Arthur Texas 77640
Re: Install 3 new office areas
SpawGlass Job No.:
Address of Service: 102 H.O. Mills Blvd.
Dear Mr.Williams,
SpawGlass Construction Corp.is pleased to offer our proposal to perform the scope as described in the following inclusions:
I. INCLUSIONS
We have estimated:
2) Buildout(3)new office area complete with windows and doors(no ceiling as shown on city of port arthur supplied drawings)
3)Install(3)new data drops for new office areas
4)remove(1)existing door frame and close of for new office area
5)additional wall base for new office areas
7)All labor,supervision,insurance,permit and dumpsters
8)Clean all scope related trash and dipose of in SpawGlass fumished dumpsters
Cost of Service $ 15,550.00
Sales Tax(8.25%) TAX EXEMPT
Total Cost of Service $ 15,550.00
II. EXCLUSIONS
1)Any additional areas needing repair
2)State tax/Bonding/Permit Cost
3) Lighting/New electrical conduits or wiring
4) Ceilings
5) Mechanical,Plumbing,or Electrical modifications/additions
6)Anything not specifically listed in the inclusions above is specifically excluded.
III. OWNER-SUPPLIED
Any work performed outside of this scope of work is to be considered a change order and paid in addition to the stated contract amount.This offer is subject to
arrangements being made,which are satisfactory to Contractor,for payment of the contract sum and security thereof.
Note:This proposal is valid for thirty(30)days only.
X31/2018
Josh Baker Date Clifton Williams Date
SpawGlass Construction Corp. City of Port Arthur