HomeMy WebLinkAboutPR 20574: BLUEBONNET AVENUE STREET IMPROVEMENTS FROM GULFWAY DRIVE TO 19TH STREET, CHANGE ORDER NO. 2 ort rthu — www.PortArthurTx.gov INTEROFFICE MEMORANDUM Date: November 5, 2018 To: The Honorable Mayor and City Council Through: Harvey Robinson, Interim City Manager From: Alberto Elefano, P.E., City Engineer RE: P.R. 20574—Bluebonnet Avenue Street Improvements from Gulfway Drive to 19th Street, Change Order No. 2 INTRODUCTION: Acceptance of Change Order No. 2 for the Bluebonnet Ave. Street Improvements from Gulfway Drive to 19th Street. This change order includes the addition of two bid items for the inlet box modification and asphalt/base tie-in transition at the end of the project near 19th Street. In addition, Change Order No. 2 will be adjusting the quantity of removal and installation of concrete pipe for the storm sewer upgrades and will include the change to seeding between the back of curb to the edge of right-of-way. This request will decrease the total contract amount by $5,398.03 BACKGROUND: This project is for the rehabilitation of Bluebonnet Ave. from Gulfway Drive to 19th Street. Change Order No. 2 is necessary for the new road to tie-in to the existing road with a smooth transition. The change order also addressed an upgrade to the storm sewer system and it was found that seeding was not necessary at all the identified locations. This request decreased the contract amount by $5,398.03 FUNDING SOURCE: Funds are available in the Capital Improvements Account No. 307-1601-591.86.00 for the original amount of$1,314,627.91. The total cost of Change Order No. 2 will decrease the contract amount by$5,398.03 to the new total contract amount of$1,309,229.88. "Remember,we are here to serve the Citizens of Port Arthur" P.O.Box 1089 * Port Arthur,Texas 77641-1089 * 409.983.8182 * FAX 409.983.8294 RECOMMENDATION: Approval of P.R. 20574 authorizing the City Manager to execute Change Order No. 2 to the contract with Excavation and Construction, LLC for Bluebonnet Ave. from Gulfway Drive to 19th Street. "Remember,we are here to serve the Citizens of Port Arthur" P.O.Box 1089 * Port Arthur,Texas 77641-1089 * 409.983.8182 * FAX 409.983.8294 P.R. 20574 11/7/18 ACE RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDER NO. 2 TO THE CONTRACT BETWEEN THE CITY OF PORT ARTHUR AND EXCAVATION AND CONSTRUCTION, LLC OF PORT ARTHUR, TX FOR THE BLUEBONNET AVENUE STREET IMPROVEMENTS FROM GULFWAY DRIVE TO 19TH STREET, DECREASING THE CONTRACT AMOUNT BY $5,398.03 TO A NEW CONTRACT AMOUNT OF $1,309,229.88. FUNDING IS AVAILABLE IN THE CAPITAL IMPROVEMENTS ACCOUNT NO. 307-1601- 591.86.00 WHEREAS, per Resolution No. 17-154, the City Council awarded a contract for city street improvements along Bluebonnet Avenue from Gulfway Drive to 19th Street to Excavation & Construction, LLC of Port Arthur, Texas with the projected budgetary impact amount of $1,314,627.91 and a term of 270 calendar days; and, WHEREAS, per Resolution No. 18-102, the City Council authorized Change Order No. 1, increasing the initial term of the contract from 270 to 328 calendar days; and, WHEREAS, proposed Change Order No. 2 is a change order that will decrease the contract amount by $5,398.03 from the original contract amount of $1,314,627.91 to a new contract amount of $1,309,229.88; and, WHEREAS, the proposed change order includes the addition of two bid items for the inlet box modification and asphalt/base tie-in transition at the end of the project near 19th Street; and, WHEREAS, this change order also includes adjusting the quantity of removed and installed concrete pipe for the storm sewer upgrades and will include the change to P.R. 20574 11/7/18 ACE seeding between the back of curb to the edge of the right-of-way, attached hereto as Exhibit "A"; and, WHEREAS, Change Order No. 2 was necessary for the new road to tie-in to the existing road with smooth transition; and, WHEREAS, it also addressed an upgrade to the storm sewer system and it was found that seeding was not necessary at all the identified locations; and, WHEREAS, approval of Change Order No. 2 will decrease the contract price by $5,398.03 to a new contract price of $1,309,229.88 herein deemed an appropriate action; now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT, the facts and opinions in the preamble are true and correct; and, THAT, the City Manager of the City of Port Arthur is hereby authorized and directed to execute said Change Order No. 2 (attached as Exhibit "A") to the contract between the City of Port Arthur and Excavation and Construction, LLC of Port Arthur, Texas for Bluebonnet Avenue Street Improvements from Gulfway Drive to 19th Street; and, THAT, Change Order No. 2 decreases the contract amount by $5,398.03 to a new contract amount of $1,309,229.88; and, THAT, a copy of the caption of this Resolution be spread upon the Minutes of the City Council. P.R. 20574 11/7/18 ACE READ, ADOPTED AND APPROVED this the day of , A.D. 2018 at a meeting of the City of Port Arthur, Texas by the following vote: Ayes: Mayor: Councilmembers: Noes: Derrick Freeman Mayor Attest: Sherri Bellard City Secretary APPROVED AS TO FORM: APPROVED FOR ADMINISTRATION: �Gt/" Valecia Tizen 41# Harvey Robinson City Attorney Interim City Manager P.R. 20574 11/7/18 ACE APPROVED AS FOR AVAILABILITY OF FUNDS: ^ / Andrew Vas uez, CP Director of Finance Armando Gutierrez, Jr., P.E. Dir ctor of Public Works (A/ Clifton Williams, CPPB Purchasing Manager P.R. 20574 11/7/18 ACE EXHIBIT 'A' +AS CIRAIC RECEIVED NOV 012088 .. ARCENEAUX WILSON&COLE engineering surveying I plannuiy Public Works Engineering-City Hall CHANGE ORDER No. 2 DATE: October 31, 2018 JOB NO. CPA-826 AGREEMENT DATE: June 27, 2017 NAME OF PROJECT: PROPOSED CITY STREET IMPROVEMENTS ALONG BLUEBONNET AVENUE OWNER: CITY of PORT ARTHUR CONTRACTOR: EXCAVATION &CONSTRUCTION, LLC. The following changes are hereby made to the CONTRACT DOCUMENTS: I. Edit the following Items to the Contract and Scope of Work: a. Add the following Bid Items: i. Bid Item No. 0105-0001 $ 34,000.00 Remove and Replace Asphalt Transition–1 LS ($34,000.00/LS) ii. Bid Item No. 0465-0002 $ 5,950.00 Inlet(Extension Box)-1 EA ($5, 950.00/EA) b. Delete the following Bid Items: i.Alternate Bid Item No. 0164-6008 $ 907.50 Deduct for Seeding (Perm)(Urban)(Clay)-1.5 AC (-$605.00/AC) ii. Alternate Bid Item No. 0162-0001 $ (27,951.00) Add for Block Sodding-1.5 AC ($18,634.00/AC) 409.724.7888 2901 Turtle Creek Dr.,Suite 320 Port Arthur,TX 77642 Engineering Surveying awceng.com F-16194 10194049 • awn RECEIVED c. Adjust Quantity in the following Bid Items: i. Bid Item No. 0464-6003 $ 4,500.72 RC Pipe (CL III) (18")—Add 114 LF ($39.48/LF) ii. Bid Item No. 0496-6007 $ 345.42 Remove STR (Pipe)—Add 114 LF ($3.03/LF) iii. Alternate Bid Item No. 0531-6001 $ (23,150.67) Add for Concrete Sidewalks (4")—Subtract 687.78 SY ($33.66/SY) SUBTOTAL $ (5,398.03) *Pp C NC RECEIVED VMM NOV d 1 2019 CHANGE TO CONTRACT PRICE: ORIGINAL CONTRACT PRICE: $ 1,314,627.91 CURRENT CONTRACT PRICE adjusted by previous CHANGE ORDER(S): $ 1314,627.91 The CONTRACT PRICE due to this CHANGE ORDER will be [decreased] by: $5,398.03 Dollars The new CONTRACT PRICE, including this CHANGE ORDER, will be $ 1,309,229.88 CHANGE TO CONTRACT TIME: ORIGINAL CONTRACT TIME: 270 Calendar Days CURRENT CONTRACT TIME adjusted by previous CHANGE ORDERS: 328 Calendar nays CURRENT DATE OF COMPLETION: June 20,2018 CONTRACT TIME due to this CHANGE ORDER will be increased by 0 Days The New DATE OF COMPLETION: June 20,2018 No other Terms and Conditions of the Contract are changed as a result of this Change Order. Contractor's acceptance of Change Order relieves OWNER of any liability for additional costs incurred by Contractor in his performance of the work covered by the Change Order. RECOMMENDED BY ENGINEER: ACCEPTED BY: t PACAJ2- ARCENEAUX ON&COLE LLC EXCAVATION AND CONSTRUCTION,LLC. ACCEPTED BE CITY of PORT ARTHUR