Loading...
HomeMy WebLinkAboutPR 20593: PROPERTY DAMAGE SETTLEMENT, TRANSIT MOBILITY VAN #2011 City of ECity �� l)4l ort rthu�—II T e a-a s INTEROFFICE MEMORANDUM Office of Safety & Risk Management Date: November 26, 2018 To: Harvey L. Robinson, Interim City Manager From: Trameka A. Williams, Asst. Director of Human Rescup0 RE: A Resolution Approving a Property Damage Settlement in the Amount of$9,418.70 for Damages to City of Port Arthur Transit Mobility Van #2011 Nature of the request: On June 19, 2018, a Transit employee drove into high water causing damage to the mobility van. Staff Analysis, Considerations: The City has Automobile Physical Damage insurance coverage through Texas Municipal League Intergovernmental Risk Pool (TML). TML has offered the City a settlement of$9,418.70, which is considered a fair and reasonable settlement. If additional damages are discovered, TML may issue a supplemental payment. Recommendation: I recommend approval of Proposed Resolution No. 20593 authorizing the property damage settlement against TML for damage sustained to Paratransit Bus Unit #2011 (2014 Dodge Grand Caravan). TML has offered to settle the claim for $9,418.70. This is considered a fair and reasonable settlement. If additional damages are discovered, TML may issue a supplemental payment. Budget Considerations: The funds received will be deposited in the Insurance Proceeds Account 401-0000-369.85-00 (Transit Insurance Settlements). "Remember we are here to serve the Citizens of Port Arthur" P.R. No. 20593 11/26/18 TAW RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE SETTLEMENT OF A PHYSICAL DAMAGE CLAIM IN THE AMOUNT OF $9,418.70 MADE AGAINST TEXAS MUNICIPAL LEAGUE INTERGOVERNMENTAL RISK POOL (TML) AS A RESULT OF PROPERTY DAMAGE TO TRANSIT VEHICLE #2011 WHEREAS, June 19, 2018, a Transit employee drove into high water causing damage to the mobility van; and, WHEREAS, as a result of the damage, a claim was filed with Texas Municipal League Intergovernmental Risk Pool (TML); and. WHEREAS, TML has offered to settle the claim for $9,418.70, which is considered a fair and reasonable settlement. If additional damages are discovered, TML may issue a supplemental payment. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR, TEXAS: Section 1. That, the facts and opinions in the preamble are true and correct. Section 2. That, the City Manager is hereby authorized to execute settlement in the amount of $9,418.70. Section 3. That, a copy of this Resolution be spread upon the minutes of the City Council. P.R. No. 20593 11/26/2018 TAW Page 2 of 2 READ, ADOPTED, AND APPROVED this day of , AD, 2018, at a Meeting of the City Council of the City of Port Arthur, Texas, by the following vote: AYES: Mayor , Councilmembers NOES: Derrick Ford Freeman, Mayor ATTEST: Sherri Bellard, City Secretary APPROVED AS TO FORM: rke VlTizni £ Val e o,, rn o ey APPROVED FOR ADMINISTRATION: Harvey L. Robinson, Interim City Manager EXHIBIT "A" BREZINA CLAIM ASSOCIATES, INC. Workfile ID: c39ae676 P.O. Box 36887 HOUSTON,TX 77236 Phone: (832)319-6200, FAX:(713)715-4374 For: TML Intergovernmental Risk Pool Phone: (512)491-2300, FAX:(512)491-2366 Preliminary Supplement 1 with Summary Owner: CITY OF PORT ARTHUR Job Number: Written By: Matt Brezina Adjuster:TMLIRP Insured: CITY OF PORT ARTHUR Policy#: UNIT 2076 Claim#: AU83664 Type of Loss: Comprehensive Date of Loss: 6/19/2018 12:00 AM Days to Repair: 4 Point of Impact: 25 Fresh Water Owner: Inspection Location: Repair Facility: CITY OF PORT ARTHUR CITY OF PORT ARTHUR MID COUNTY CDR) 300 WACO AVE 300 WACO AVE 8181 MEMORIAL BLVD PORT ARTHUR,TX 77640 PORT ARTHUR,TX 77640 PORT ARTHUR,TX 77640 (409)749-0769 Business Home (409)983-5171 Business (409)749-0769 Business (409)223-5588 Fax VEHICLE 2014 DODG Grand Caravan VT 4D UN WHITE VIN: 2C7WDGEG4ER240133 Production Date: Interior Color: BLACK License: 1190651 Odometer: 62,686 Exterior Color: WHITE State: TX Condition: Good 11/7/2018 10:20:10 AM 059215 Page 1 Preliminary Supplement 1 with Summary Owner: CITY OF PORT ARTHUR Job Number: 2014 DODG Grand Caravan R/T 4D UTV WHITE Line Oper Description Part Number Qty Extended Labor Paint Price$ 1 # Repl RT SLIDING DOOR MOTOR 1 445.97 2 # Subl LABOR 1 194.93 X 3 # Repl LT SLIDING DOOR MOTOR 1 457.97 4 # Subl LABOR 1 194.93 X 5 # R&I RT&LT FRONT SEAT 4.0 6 # Subl DIAGNOSTICS 1 994.64 X 7 # R&I FLOORING&REAR SEATS 5.0 8 # Rpr R&I DOOR PANELS-CLEAN& 3.0 DRY 9 # SOl Repl LONG BLOCK B40% 1 5,875.97 10 # SOl Subl INSTALL LONG BLOCK 1 2,845.90 X 11 # 501 Repl ANTIFREEZE 1 25.97 12 # SO1 Repl PUMP 1 166.97 13 # S01 Repl GASKET 1 20.97 14 # SOl Repl HOUSING 1 14.97 15 # SOl Repl CYLINDER GASKET 1 2.97 16 # 501 Repl CYLINDER GASKET 1 2.97 17 # SOl Repl ADHESIVE 1 14.97 18 # SO1 Repl INTAKE GASKET 1 4.97 19 # SO1 Repl INTAKE GASKET 1 4.97 20 # SOl Repl AB FLUID 1 8.97 21 # SOl Repl SEAL 1 16.97 22 # 501 Repl AC FILTER 1 12.97 23 # SO1 Repl OIL 1 4.50 24 # SOl Repl SPARK PLUGS 1 89.82 25 # SO1 Repl AIR FILTER 1 43.97 26 # 501 Subl DIAGNOSIS 1 259.90 X SUBTOTALS 11,707.14 12.0 0.0 ESTIMATE TOTALS Category Basis Rate Cost$ Parts 7,216.84 Body Labor 12.0 hrs @ $60.00/hr 720.00 Miscellaneous 4,490.30 Subtotal 12,427.14 Total Cost of Repairs 12,427.14 Deductible 0.00 LONG BLOCK B40% 2,350.39 Total Adjustments 2,350.39 Net Cost of Repairs 10,076.75 11/7/2018 10:20:10 AM 059215 Page 2 Preliminary Supplement 1 with Summary Owner: CITY OF PORT ARTHUR Job Number: 2014 DODG Grand Caravan R/T 4D UTV WHITE SUPPLEMENT SUMMARY Line Oper Description Part Number Qty Extended Labor Paint Price$ Added Items . afgIIIIIIIIIIr: 9 # SOl Repl LONG BLOCK B40% 1 5,875.97 10 # SOl Subl INSTALL LONG BLOCK 1 2,845.90 X 11 # Sal Repl ANTIFREEZE 1 25.97 12 # S01 Repl PUMP 1 166.97 13 # SOl Repl GASKET 1 20.97 14 # 501 Repl HOUSING 1 14.97 15 # 501 Repl CYLINDER GASKET 1 2.97 16 # 501 Repl CYLINDER GASKET 1 2.97 17 # SOS Repl ADHESIVE 1 14.97 18 # SO1 Repl INTAKE GASKET 1 4.97 19 # 501 Repl INTAKE GASKET 1 4.97 20 # SO1 Repl AB FLUID 1 8.97 21 # 501 Repl SEAL 1 16.97 22 # 501 Repl AC FILTER 1 12.97 23 # 501 Repl OIL 1 4.50 24 # SO1 Repl SPARK PLUGS 1 89.82 25 # SOS Repl AIR FILTER 1 43.97 26 # SOl Subl DIAGNOSIS 1 259.90 X SUBTOTALS 9,418.70 0.0 0.0 CHANGES TO ADJUSTMENTS TOTALS SUMMARY Category Basis Rate Cost$ Parts 6,312.90 Miscellaneous 3,105.80 Subtotal 9,418.70 Total Supplement Amount 9,418.70 LONG BLOCK B40% 2,350.39 Supplement Adjustments 2,350.39 NET COST OF SUPPLEMENT 7,068.31 11/7/2018 10:20:10 AM 059215 Page 3