Loading...
HomeMy WebLinkAboutPR 20621: NORTH PEDESTRIAN BRIDGE REPAIR PROJECT City of ort rth tri www.PortArthurTx.gov INTEROFFICE MEMORANDUM Date: December 17,2018 To: The Honorable Mayor and City Council Through: Harvey Robinson, Interim City Manager From: Chandra Alpough, Director of Parks and Recreation RE: P.R. 20621 —North Pedestrian Bridge Repair Project Introduction: Approving P. R. No. 20621 authorizing the City Manager to execute a contract with SKR Construction for the labor to repair the North Pedestrian Bridge at the Babe Zaharis Golf Course with a projected budgetary impact of$27,107.00. Background: The City of Port Arthur's Babe Zaharis Golf Course North Bridge is in need of repair and must meet the American Disabilities Act federal requirements and maintain structural integrity of a pedestrian bridge. Quotes for labor and equipment were solicited on March 8, 2018 and were opened on March 12, 2018. Two (2) quotes were received with SKR Construction of Port Arthur, Texas being the lowest responsible quote. The proposed improvements include total replacement of the subdeck and surface deck of the pedestrian bridge. The City of Port Arthur will purchase the materials at an estimated cost of$25,000.00. Budget Impact: Funds are available in the following account: 103-2001-601.87-00,Golf Course Fund Account Recommendation: It is recommended that the City Council approve P.R.No.20621 authorizing the City Manager to execute a contract with SKR Construction for the North Pedestrian Bridge Project at the Babe Zaharis Golf Course at a cost of$27,107.00. The City will furnish the building material separately at an estimated cost of $25,000.00 for a total project budgetary impact of $52,107.00. "Remember,we are here to serve the Citizens of Port Arthur" P.O.Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8182 X FAX 409.983.8294 P. R. #20621 12/17/2018 ca RESOLUTION NO. A RESOLUTION AWARDING A BID AND AUTHORIZING THE CITY MANAGER TO EXECUTE A CONTRACT WITH SKR CONSTRUCTION OF PORT ARTHUR, TEXAS FOR THE NORTH PEDESTRIAN BRIDGE REPAIR PROJECT AT THE BABE ZAHARIAS GOLF COURSE, WITH A PROJECTED BUDGETARY IMPACT OF $27,107.00 FUNDING AVAILABLE IN GOLF COURSE FUND ACCOUNT NO. 103-2001- 601.87-00. WHEREAS, the City is obligated to meet the federal standards of the American Disabilities Act, (ADA) and structural integrity of pedestrian bridges; and, WHEREAS, the north pedestrian bridge surface at the Babe Zaharias Golf Course is in desperate need of repair; and, WHEREAS, quotes for labor were solicited for the North Pedestrian Bridge Repair at the Babe Zaharias Golf Course Project on March 8, 2018; and, WHEREAS, materials will be purchased by the City of Port Arthur at an estimated cost of $25,000.00; and, WHEREAS, two (2) quotes were received and opened on March 12, 2018 for the above referenced Contract (see Exhibit "A") with SKR Construction having the lowest most responsible quote in the amount of $27,107.00 and have been evaluated by the Parks and Recreation staff and Purchasing Manager; now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT, the facts and opinions in the preamble are true and correct; and, THAT, the City Council of the City of Port Arthur hereby awards the quote for labor for the North Pedestrian Bridge Repair Project at the Babe Zaharias Golf Course to SKR P. R. #20621 12/17/2018 ca Construction of Port Arthur, Texas in the amount of $27,107.00 as shown on Exhibit "B" attached hereto and made a part hereof; and, THAT, the City Manager of the City of Port Arthur is hereby authorized and directed to execute on behalf of the City, a contract between the City of Port Arthur and SKR Construction of Port Arthur, Texas for the labor to repair the North Pedestrian Bridge at Babe Zaharias Golf Course at a cost of $27,107.00; in substantially the same form attached hereto as Exhibit "B"; and, THAT, the City will furnish the building material separately at an estimated cost of $25,000.00 which will not be part of the vendor's cost or a part of this contract; and, THAT, a copy of the caption of this Resolution be spread upon the Minutes of the City Council. READ, ADOPTED AND APPROVED this the day of , A.D. 2019 at a meeting of the City of Port Arthur, Texas by the following vote: Ayes: Mayor: Councilmembers: Noes: Mayor Derrick Freeman P. R. #20621 12/17/2018 ca Attest: City Secretary Sherri Bellard APPROVED AS TO FORM: APPROVED FOR ADMINISTRATION: 7V4/ 1/(4- Valecia Tizeno Harvey Robinson City Attorney Interim City Manager APPROVED AS FOR AVAILABILITY OF FUNDS: n�✓�())/(r1 Andrew asques, CPA Director of Finance drW)1076q Chandra Alpough, MA, C RP Director of Parks and Recreation V � Clifton Williams, CPPB Purchasing Manager EXHIBIT "A" CITY OF PORT ARTHUR TEXAS Bid Tabulation \/"" North Pedestrian Bridge Repair at the Babe Zaharis Golf Course March 12,2018 SKR Construction Norman Hwy.Construction, Inc. Description Total Cost Total Cost Base Bid $27,107.00 $60,368.00 Alternative 2a NA $57,248.00 Alternative 3a NA $62,448;00 Alternative 2a&3a NA $59,320.00 Location Port Arthur,TX Orange,TX Page 1 of 1 EXHIBIT " B" CONSTRUCTION SERVICES AGREEMENT North Pedestrian Bridge Repair Project at the Babe Zaharias Golf Course in Port Arthur, Texas THIS AGREEMENT, made this day of , 2019, by and between the City of Port Arthur, a municipal corporation organized under the laws of the State of Texas, hereinafter called "OWNER" or "CITY", and SKR Construction hereinafter called "CONTRACTOR". WITNESSED: That, for and in consideration of, the payment terms, conditions, and agreements set forth herein, OWNER and CONTRACTOR agree as follows: 1. The CONTRACTOR will commence the work required by the Contract Documents upon Receipt of a Notice to Proceed. The work to be performed under this Contract will be completed within 30 days of commencement. 2. The CONTRACTOR will perform the work as delineated in the Scope of Work and Specifications attached hereto. 3. During the term of this Contract, the Contractor will furnish at this own expense all of the supplies, tools, equipment, labor and other services necessary to connection therewith, excepting those supplies specifically not required of Contractor in the Specifications and Scope of Work. 4. The City of Port Arthur agrees to provide the contractor materials needed for the project with an estimated cost of $25,000.00. 5. The CONTRACTOR agrees to perform all the work described in the specifications and contract documents and to comply with the terms therein. The amount of this contract is $27,107.00. 6. The term "Contract Documents" means and includes the following" a. Agreement b. Specifications c. Addenda d. Bid e. Notice to Proceed 7. This Agreement shall be binding upon all parties hereto and their respective heirs, executors, administrators, successors and assigns. 8. IN WITNESS WHEREOF, the parties hereto have executed, or caused to be executed by their duly authorized officials, this Agreement in (2 copies) each of which shall be deemed an original on the date first above written. Signed on the day of 2019. OWNER: BY: Harvey Robinson Interim City Manager Signed on the day of 2019. CONTRACTOR: SKR Construction BY: Gloria Sanchez Owner • CITY OF PORT ARTHUR,TEXAS BID SCHEDULE BID "B" FOR: BRIDGE 1 AT HOLE 1 NORTH PEDESTRIAN BRIDGE REPAIR AT THE BABE ZAHARIS GOLF COURSE Description Unit Quantity Unit Price Extended Cost (p�� 0u Item 1: Deck/Subdeck Rent SF 2080.0 $ �� , } 1 $ 1 J 91.4(if -- Item 2: Subdeck, 4"x6" Laminate (8'8" Wide) (Labor& Equipment 2 L !j Only) SF 1040.0 $ _ . 7 3 $ J U 4 Item 3: Surface Deck, 2"x6" (Long.) (Labor& --> C. ' / Equipment Only) SF 1040.0 $ 3. ?.c $ .) f (_i�,i Item 4: Handrail (Comp in P1) (Labor& Equipment Only) LF 240.0 $ ,3 , ) \ $ 3 Item 5: 4"x4"x 70" Deck Post (Labor& Equipment Only) EA 52 $ 3 �}. 7 $ Item 6: 2"x6" Railing Top & Side Boards (Laborf 1 & Equipment Only) SF 480.0 $ 5 , $ ,) ) t5 C Item 7: 2"x8"Flashing Board (Labor& Equipment v c y A Only) SF 160.0 $ 0 7 _ $ / / &U /� v� SUB TOTAL "B" BASE BID (Turn Key) $ ,2 `/ $ O7 Alternative Bid "B": Item 2a: Subdeck, 4"x6" (8'8" wide) @ 8" CC Spacing SF 520.0 $ $ Item 3a: Trex Board or its Equiv. Material 2"x6" Longitudinally SF 1040.0 $ $ •1'( TOTAL DAYS TO COMPLETE (calendar): ,30 L f"\_ ( I Li(- l /1 -361:") (---0 X RCCOMPANY'NAME STREET ADD ESS ) SIGNATURE OF BIDDER P.O. BOX ) (_.) c �1 � ( 1\r-1- e. c ( dt.10Y 1 � 11U l) PRINT OR TYPE NAME y S ATE ZIP ir TITLE A�tEA CODE TELEPHONE NO Ci(ti C•k. • - \L.Le Cr tct I ("A 11 0 1 — � , ) EMAIL FAX NO. NOTE: THIS BID IS FOR THE NORTH PEDESTRIAN BRIDGE REPAIR ONLY. (120 LINEAR FEET IN LENGTH AND TWELVE(12) FEET AND THREE (3) INCHES IN WIDTH) THE UNIT BID COST AND EXTENDED COST IS FOR LABOR, EQIPMENT AND ALL INCIDENTALS TOOLS NEEDED TO COMPLETE THE WORK ONLY. ALL MATERIALS, HARDWARES AND INCIDENTALS NEEDED TO COMPLETE THE WORK WILL BE SUPPLIED BY THE OWNER AT NO COST TO THE CONTRACTOR. L= 120' — — —____I PROP. 2'x 8' PRESSURE TREATED WOOD FLASHING UN BOTH SIDES OF THE BRIDGE L._ --....0---,-_______ OF 0.60 SATURATION. 0 0 te`' 0 0 `a 'I ..03 n 1 n_ 1 ,in INI I 43C o 0 \ II II '. n n '\ 3 $ PROPOSED HOT DIP GALVANIZED o o o jam— o CLIP EVERY FIVE BOARDS STAGGERED ON EACH SIDE OF W Jo 0 o STRINGER FLANGE. (SUBSIDIARY 8 ° _a.. , n r. / TO ITEM 3, SUB DECKING.) _ (SUBMIT SHOP DRAWINGS) o o o L.4 L._, a _ .r.,__, Cep cccc O I O co �� ti i-- STRINGER (TYPICAL) EXISTING. \I\\t— nU U O /� L F0 _ „ ^ o I \\_._n__, / - -PROPOSED 4'x6' PRESSURE I 1 I 1 -'I - __________° � ! TREATED WOOD OF �_ 0 0 / Iol 2.50 SATURATION I. 1—PROPOSED 2i'0x 34' HOT DIPPED GALVANIZED L4'x4' PRESSURE SCREWS @ 2 EACH PER PLANK @ 36' U.C. (TYP. TREATED WOOD POST PROPOSED 2'x6' PRESSURE TREATED OF 0.60 SATURATION SURFACE DECKING OF 0.60 SATURATION (BUTTED TO EACH OTHER) SURFACE DECKING AND SUBDECKING FLOOR CLIP LAYOUT N.T.S. NOTE: 1 . ALL BOARDS SCREWS SHALL BE HOT DIPPED GALVANIZED. 2. ALTERNATE SURFACE DECK WILL BE OF TREX BOARD OR EQUIVALENT MATERI Al (Sc WILl BE BUTTED TO EACH OTHER. 3. ALTERNATE SUB DECK WILL BE SPACED @ 8" CC. CLIPS WILL BE INSTALLED 2 EACH STAGGERED PER SUB—DECK BOARD. 4. PAYMENT FOR ALL WOOD DECKING - 1 . AND FLASHING SHALL BE IN SQUARE FOOT UNITS MEASURE OF BOARD REV_ I OATS OESC4IP G 01.4G. 0.PPR. MATERIALS INSTALLED IN PLACE, REPAIR 2~BRIDGES AT BABE ZAHARIAS INCLUDING ALL HARDWARE AS SHOWN GOLF COURSE IN THE DRAWINGS. SURFACE DECKING SUBDECK;NC CLIP DE IAIL CITY CE PORT ARTHUR, TEXAS €Nowobr.O mrAvl_tl GI,AAM. A.MFHEG — SCALE VQ to SCALE I CiLl • im ,�1T a EPRIR AIPOO"4i A.dlMPREE 'JAI MO/MI? QRG. '•J A '11 ppm% -c: ,^I CARRIAGE 11111111 11111 BOLTS 1iiiuiiiiIIiiI -� Ia"Ox 8" HOT DIPPED J' PROPOSED 4'5(6" PRESSURED GALVANIZED WOOD ■s TREATED WOOD SCREWS (TYP.) 2,50 SATURATION I SUBDECKING FLOOR NAILING DETAIL N.T.S. 4 4 /G T PROPOSED 4"x6" PRESSURE TREATED WOOD 2 vj---- I 2.50 SATURATI❑N I 0 + X 0 + X --- X 0 + X 0 o INDICATES NAILS IN FIRST LAMINATION x INDICATES NAILS IN SECOND LAMINATION + INDICATES NAILS IN THIRD LAMINATION L • i' SECTION A-A •_= 4 G � REV. DATE DESCRIPTION DWG._APPR. REPAIR 2 BRIDGES AT BABE ZAHARIAS GOLF COURSE SUBDECKING NAILING DETAIL CITY OF PORT ARTHUR, TEXAS EHCIRFFAIRC DIVISOR DRAM A &FRED SSE N01 10 OCA1F 01fQ0a A 4Lfl[!K¢2__--_ APPROVED A.W1I€RRE2 OAR: 2/20/2017 ova 2 or 3 HAND RAIL POST INSTALLATION JETAIL UN.rS. 2'x6' PRESSURE TREATED WOOD @ 0.60 SATURATION — HANDRAIL (CAP ENDS) I 0------_ 1 ' SCH. 40 GALVANIZED - CIRCULAR PIPE. ,//"'/ ff' I /!11.1/-'1 jt - I 0 F. A t :-.r,.i .r_,---11 1 / I P , (SUBMIT SHOP DRAWINGS) iliO .. I i .i I HI �— - ) }• 20 �.II ft GALVANIZED } ti STEEL SELF c I TAPING SCREWS [G' 2'x6' PRESSURE TREATED [`}'x 3 h' WOOD @ 0.60 SATURATION GALVANIZED I SCREWS _ HAND RAIL BRACKET DETAIL I I . co N.T.S. FOR BRIDGE 1 ® HOLE 1 I AND BRIDGE 2 ® HOLE 9 i________--1---4'x4' PRESSURE TREATED WOOD @ 0.60 SATURATION @ 4' O.C. -2'x 6' SURFACE DECK L--_____ :: - 1�� 4'x4' SUB DECKING FLOORING tll (LAMINATE) j '-` 3-1/2'0 x 10' HOT DIPPED GALVANIZED BOLTS, NUTS AND WASHERS. (BOTH ENDS) t •= p (UTILIZE EXISTING BOLT HOLES) '-• —-- i—EXISTING STRINGERS 2'x6' TOP & SIDE BOARDS I a'0x 3 A. GALVANIZED SCREWS ' 4'x 4' PRESSURE - /-I -- .' TREATED WOOD POST ' - ' = 2" MN lifii _ to X 3 b' GALVANIZED , • SCREWS ill .l ., lrAll 2-#'0x 3-4' GALVANIZED SCREWS I ` t I' 1 — 1 i'93 SCH. 40 DIP _ GALVANIZED • 1111 CIRCULAR PIPE 4'x4' PRESSURE TREATED WOOD POST REV. DATE DESCRIPTION OWC. APPR. REPAIR 2 BRIDGES AT BABE ZAHARIAS NOTE: GOLF COURSE I EXPANSION JOIN 1- OR SPLICE JOINT WILL BE HAND RAIL POST INSTALLATION SITUATED 10" TO 12" MAX CENTERLINE OF DETAIL I POST SPACING. CITY OF PORT ARTHUR, TEXAS ENQNEENINO OINSION GNAW A.ALFRED SCN£ Nor To SCALE O1EOcED A.G.0 REZ APpiRavE0 A.OVIIQtREZ { DATE 2h0f1011 Imo. 3 OFI