Loading...
HomeMy WebLinkAboutPR 20773: GRANT FOR ASSISTANCE IN THE REPAVING OF A BOAT LAUNCH PARKING LOT LOCATED AT PLEASURE ISLAND P.R.No. 20773 3/26/19 DR RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO SUBMIT AN APPLICATION TO THE STATE OF TEXAS, THROUGH THE TEXAS PARK AND WILDLIFE DEPARTMENT FOR THE STATE BOATING ACCESS PROGRAM GRANT FOR ASSISTANCE IN THE REPAVING OF A BOAT LAUNCH PARKING LOT LOCATED AT PLEASURE ISLAND; WITH A GRANT MATCH REQUIREMENT OF 25% OF A POTENTIAL AWARD OF 75% OF THE PROJECT COST. WHEREAS, the State receives annual funding from the Federal Aid in Sport Fish Restoration Act; and WHEREAS,fifteen percent of the State's annual apportionment from this federal program must be used to provide public recreational boating access; and WHEREAS, the City of Port Arthur, herein referred to as the "City", wishes to repave a 30 year old Texas Park & Wildlife boat launch parking lot to include proper drainage in order to enhance the adjoining public fishing area on Lake Sabine; and WHEREAS, the State of Texas, acting through the Texas Parks and Wildlife Department, herein referred to as the "Department", under the authority of Section 11.033 and 31.141 of the Parks and Wildlife Code would provide a 75/25 match for funding for such construction with an application deadline of October 1, 2019; and WHEREAS, the maximum amount which may be requested for assistance is $500,000.00 with the City required match of up to $125,000.00; and WHEREAS, the 2019-2020 Pleasure Island Budget will include the 25% match with assistance from the City for the reimbursable 75% of construction cost; and WHEREAS, this enhancement would be beneficial to the citizens of Jefferson County as well as transient recreational boaters from Texas and other States. NOW THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR,TEXAS: THAT,the facts and opinions in the preamble are true and correct. THAT, the Pleasure Island Department will do all things necessary to submit said grant application as delineated in Exhibit"A". P.R. No. 20773 3/26/19 DR THAT, if eligible for the assistance, the City will enter into a project agreement with the Department to provide for said construction project on a reimbursement basis, with the City providing 25%matching fund by appropriations or in-kind services,and the Department providing 75%matching funds for work accomplished. THAT,the City Council hereby authorizes the City Manager to sign any or all documents pertaining to the construction. THAT, upon the award of the grant, a budget amendment would be required from the Pleasure Island Fund balance. THAT, the City will perform all necessary maintenance and repairs to ensure public use, health and safety; and provide a security surveillance to eliminate creation of nuisance or hazard to the public or adjacent property owners; for the life of the said improvements (25 years). READ,ADOPTED AND APPROVED on this day of April 2019, A.D., at a Regular Meeting of the City Council of the City of Port Arthur, Texas, by the following vote: AYES: Mayor Councilmembers NOES: Derrick Ford Freeman, Mayor ATTEST: Sherri Bellard, City Secretary APPROVED AS TO FORM: 7��C( Val Tizeno, City Attorney P.R.No. 20773 3/26/19 DR Harvey Robinson, Interim City Manager Jimmy Dike, Director of Pleasure Island Clifton Williams, CPPB, Purchasing Manager 7ROVED AS TO AVALABILTIY OF FUNDS: ... 4\-t.re__.r,— 2t_cilt,__L___t_:,{ Rebecca Underhill, CPA, Acting Director of Finance/Asst. City Manager P.R.No. 20773 3/26/19 DR Exhibit "A" Texas Parks&Wildlife Department State Boating Access Program .. BOATING ACCESS GRANT.PROGRAM APPLICATION REQUIREMENTS Upon receipt of an original and three (3) copies of all 6.. PHOTOGRAPHS OF PROJECT SITE required information, Department staff will conduct a technical review of the application,assess the need for the 7. PROJECT NEED STATEMENT project,and conduct an on-site inspection of the proposed Provide a short narrative as to why the project is project area, needed. and what your plan of action is to address those needs. Required`information; 8. BUDGET SUMMARY 1. TRANSMITTAL LETTER May include the following estimated costs; To be submitted by the individual authorized in the resolution,to include; A. Professional services (may not exceed 12% of the estimated construction cost) A. Name of the assistance program (Boating Access Grant) andamount of funds requested 1) Pre-Agreement Costs (maximum of$500,000 in matching funds);and a) Application preparation and site B. Project location (city, county, body of water, planning costs access road,and agency having jurisdiction over b) Cultural and natural resource clearance the body of water);,and c) 'U.S. Army Corps of Engineers 404 permit or clearance C. Name and phone number of the individual to be contacted for further information:. 2) Architectural/Engineering Costs Design services and professionally sealed_ 2, RESOLUTION AUTHORIZING APPLICATION construction plans 3. LOCATION MAP B. Total and unit costs for each construction This map should be an original general highwaymap element of the county, or a portion of the county, where the project site is to be located. C, Required Program Signage Locate the,following on the map: 1) Temporary program acknowledgement sign (during constriction) A. Project locations(s); 2) Permanent program acknowledgement sign B, Existing boat ramps,available to the public; or plaque S. SITE PLAN A. Site boundary dimensions or metes and bounds.description; B. Layout of proposed improvements (ramp; parking, dock, access road to the nearest public street or road,restroom); C; Utility easements,above and below ground.