HomeMy WebLinkAboutPR 20743: RESOLUTION AUTHORIZING AN AGREEMENT WITH FREESE AND NICHOLS, INC. FOR PROFESSIONAL SERVICES 41. City of rr r 1 r r Jr ru www.PortArthurTx.gov INTEROFFICE MEMORANDUM Date: April 8, 2019 To: The Honorable Mayor and City Council Through: Rebecca Underhill, CPA, Interim City Manager From: Pamela D. Langford, Development Services Manager Cc: Ronald "Ron" Burton, Director of Development Services RE: P.R. NO. 20743 — Resolution authorizing an agreement with Freese and Nichols, Inc. for professional services Introduction: The intent of this Agenda Item is to request that City Council authorize an agreement with Freese and Nichols, Inc. ("FNI"), through H-GAC Plan Source: Professional Planning Service Program, for professional services in connection with developing a new Zoning Ordinance to replace Appendix A—Zoning of the City's Code of Ordinances in an amount not to exceed $178,500.00. Funding available in Planning Professional Services Account No. 001-1051-517.54-00. Background: In 2015, FNI developed a Diagnostic Report reviewing the City's Comprehensive Plan, Subdivision Ordinance, and Zoning Ordinance. This report identified issues and proposed solutions related to user-friendliness, streamlining the development process, compliance with State laws, and best practices. The Port Arthur City Council approved Resolution No. 15-028, authorizing and agreement with Freese and Nichols, Inc. for Comprehensive Planning Services. On May 22, 2018, the Port Arthur City Council approved Ordinance No. 18-21, adopting the Port Arthur Comprehensive Plan "Imagine Port Arthur: Your Dream, Our Future" 1 pursuant to Texas Local Government Code Chapter 213 and Article XI, Section 4 of the Port Arthur City Charter. In accordance with Section 211.004(a) of the Texas Local Government Code, zoning regulations must be adopted in accordance with a comprehensive plan and must be designed to address streets, safety, health and general welfare, overcrowding, population, transportation, water/sewer, schools, parks, and other public requirements. A request was submitted for funding for this project for the current fiscal year (FY18- 19). The project was described as "development of Zoning Ordinance in Accordance with Chapter 211 of the Texas Local Government Code"and approved by City Council as part of the budget process. Budget Impact: The City of Port Arthur agrees to pay Freese and Nichols, Inc. for all professional services as outlined in the attached "Scope of Services" in an amount not to exceed $178,500.00. This project was budgeted during the FY2018-2019 budget process, with funding provided in the amount of $147,900.00. Recommendation: It is recommended that City Council authorize an agreement with Freese and Nichols, Inc. ("FNI"), through H-GAC Plan Source: Professional Planning Service Program, for professional services in connection with developing a new Zoning Ordinance to replace Appendix A — Zoning of the City's Code of Ordinances in an amount not to exceed $178,500.00. Funding available in Planning Professional Services Account No. 001- 1051-517.54-00. "Remember,we are here to serve the Citizens of Port Arthur" P.O.Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8101 X FAX 409.982.6743 P.R. NO.20743 04/08/2019 PDL PAGE 1 OF 22 RESOLUTION A RESOLUTION AUTHORIZING THE CITY MANAGER TO ENTER INTO AN AGREEMENT WITH FREESE AND NICHOLS, INC. OF TEXAS, THROUGH H-GAC PLAN SOURCE: PROFESSIONAL PLANNING SERVICE PROGRAM, FOR PROFESSIONAL SERVICES IN CONNECTION WITH DEVELOPING A NEW ZONING ORDINANCE FOR THE CITY OF PORT ARTHUR IN AN AMOUNT NOT TO EXCEED $178,500.00. FUNDING AVAILABLE IN PLANNING PROFESSIONAL SERVICES ACCOUNT NO. 001- 1051-517.54-00. WHEREAS, pursuant to Resolution No. 13-413, the City Council authorized a contract with Freese and Nichols, Inc., for the diagnostic analysis and report of the City's Comprehensive Plan, Zoning and Subdivision Ordinances. The report identified issues and proposed solutions related to user-friendliness, streamlining the development process, compliance with State Laws and best practices; and, WHEREAS, City Council approved Resolution 15-028, authorizing an agreement with Freese and Nichols, Inc. for Comprehensive Planning Services; and, WHEREAS, the City of Port Arthur City Council approved Ordinance No. 18-21 , adopting the Port Arthur Comprehensive Plan "Imagine Port Arthur: Your Dream, Our Future" pursuant to Texas Local Government Code Chapter 213 and Article XI, Section 4 of the Port Arthur City Charter; and, WHEREAS, in accordance with Section 211.004(a) of the Texas Local Government Code, zoning regulations must be adopted in accordance with a comprehensive plan and must be designed to address streets, safety, health and general welfare, overcrowding, population, transportation, water/sewer, schools, parks, and other public requirements; and, WHEREAS, currently, Appendix A — Zoning of the City of Port Arthur Code of Ordinances is outdated and does not provide many of the standards appropriate for contemporary development; and, P.R. NO.20743 04/08/2019 PDL PAGE 2 OF 22 WHEREAS, the City of Port Arthur agrees to employ Freese and Nichols, Inc. to perform professional planning services in connection with developing a new Zoning Ordinance to replace Appendix A— Zoning of the City of Port Arthur Code of Ordinances, through the Houston-Galveston Area Council's (HGAC's) Plan Source Project, as delineated in Exhibit "A"; and, WHEREAS, HGAC has selected a Request for Proposals for professional planning services for Local Governments of which this contract qualifies; and, WHEREAS, the City of Port Arthur agrees to pay Freese and Nichols, Inc. in an amount not to exceed $178,500.00, as delineated in Exhibit "B"; now therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: SECTION 1. That the facts and opinions in the preamble are true and correct. SECTION 2. That the City Manager is hereby authorized and directed to execute the agreement for professional planning services of Freese and Nichols, Inc., in substantially the same form as attached hereto as Exhibit "B", funding being available in account 001-1051-517.54-00. SECTION 3. That a copy of the caption of this Resolution shall be spread upon the minutes of the City Council. READ, ADOPTED, AND APPROVED, this day of April, A.D. 2019, at a Regular Meeting of the City Council of the City of Port Arthur, Texas by the following vote: AYES: Mayor: Councilmembers: P.R. NO.20743 04/08/2019 PDL PAGE 3 OF 22 Noes: Derrick Ford Freeman, Mayor ATTEST: Sherri Bellard, TRMC, City Secretary APPROVED AS TO FORM: be (m 1 f o-E .v. '"a " l" Tizeno, City Attorney APPROVED FOR ADMINISTRATION: Rebecca Underhill, C.P.A., Interim City Manager Ronald "Ron" Burton, Assistant City Manager-Operations/ Director of Development Services APPROVED AS TO AVAILABILITY OF FUNDS: Director of Finance /10 Clifto Williams, CPPB Purchasing Manager P.R.NO.20743 04/08/2019 PDL PAGE 4 OF 22 EXHIBIT "A" Getting Started Page 1 of 1 Questions about PlanSource? HOME PLANSOURCE PROCUREMENT BECOME A PLANSOURCE FIRM PLANNING SERVICES MORE... H-GAC is committed to assist local governments in reducing costs and streamlining the procurement process.As a unit of local government assisting other local governments, H-GAC strives to make the governmental procurement process more efficient by establishing competitively priced contracts for services, and providing the customer service necessary to help its members achieve their procurement goals. All Program Participants in the PlanSource: Professional Planning Service Program may purchase community planning services simply by issuing a purchase order and without having to solicit competitive bids/proposals on their own. How PlanSource Works What Are My Choices The Planning Process Program Participants Interlocal Contract Types of Planning Services Frequently Asked Questions Qualified Contracted Firms http://www.theplansource.org/getting-started.htm1 3/18/2019 Planning Services Page 1 of 1 Questions about PlanSource? HOME PLANSOURCE PROCUREMENT BECOME A PLANSOURCE FIRM PLANNING SERVICES MORE... PLANS R 0014411111111 I .�� 1. -- i1i►:.� professionalplanning l � g services Qualified Planning Services PLANNING IMPLEMENTATION & STUDIES& ADDITIONAL Land Use Planning REGULATIONS SERVICES Livable Centers Land Development Regulations Special Area Studies Transit-Oriented Design Zoning Code& Revitalization &Redevelopment Housing Planning Development Regulations Environmental Justice Public Spaces&Streetscapes Overlay District Ordinances Public Involvement Historic Preservation Annexation Charettes Transportation Planning Financing Strategies & Workshops. Meeting Facilitation& Mobility Planning Economic Development Tools Consensus Building Transit Planning Public Private Partnership Community Outreach Tools Freight/Goods Movement Growth Management& Impact Fees Visual Preference Surveys Access Management Special District Financing&Creation Feasibility_Studies Corridor Planning Urban Design Visioning Pedestrian&Bicyclist Planning Site Planning Design Visualization Parking Management Comprehensive Planning Parks& Trails Planning Strategic Planning Sustainable Development Planning http://www.theplansource.org/planning-services.html 3/18/2019 Pamela Langford From: Mergo, Cheryl <cheryl.mergo@h-gac.com> Sent: Thursday, August 16, 2018 2:15 PM To: Pamela Langford Cc: Hollmann, Anita; Ron Burton; Shad Comeaux Subject: RE: HGAC Project Inquiry Form - City of Port Arthur- Confirmation Email Attachments: 08012018 Project_inquiry_form_Zoning_Subdivision_Ord_COPA.pdf Good afternoon, Thank you for the email. We are now at Step 7. I have reviewed the scope to verify that the scope falls within the PlanSource scope of project services and Freese & Nichols is a qualified firm. 7.H-GAC completes review of the scope of work to verify the scope foils within the PlanSource scope of project services and if the Firm has been qualified through PlanSource for the scope of work. If Approved:A confirmation e-mail will be sent to both Firm and Participant. If Declined:the process stops. Here is the official approval for the PlanSource project. Please contact me if you have any questions. The information in this email message is official correspondence in reference to the request to utilize PlanSource for your upcoming planning project. This email is to verify that the following information. Does the End User have an Interlocal Agreement with H-GAC? YES Does the Firm have a PlanSource contract with H-GAC?YES Does the Scope of Work fall within the bounds of PlanSource? YES Was the Firm qualified by PlanSource for the project type? YES End User City of Port Arthur Firm Requested Freese and Nichols Project Name City of Port Arthur Subdivision and Zoning Ordinance Development Overview of Services The purpose of the project for the development of a new Zoning Ordinance and Subdivision Ordinance. In accordance with Section 211.004(a) of the Texas Local Government Code, zoning regulations must be adopted in accordance with a comprehensive plan and must be designed to address specific attributes for development. Type of Planning Project Land Development Regulations CONFIRMATION: ACCEPTED NEXT STEP: 1 PlanSource Project Inquiry Project Name: Capital Improvement Plan Submitted Date: August 2, 2018 Project Background and Description In 2015, the City of Port Arthur, worked with consultants to develop a Diagnostic Report reviewing the City's Comprehensive Plan, Subdivision Ordinance, and Zoning Ordinance. The report identified issues and proposed solutions related to user-friendliness, streamlining the development process, compliance with State Laws, and best practices. Based on the recommendations provided by the Diagnostic Report, the City adopted a new Comprehensive Plan on May 22, 2018. At this time, The City of Port Arthur would like to update its current zoning and subdivision ordinances in accordance with Texas Local Government Code, Section 211.004(a). This section of the code states, zoning regulations must be adopted in accordance with a comprehensive plan and must be designed to address streets, safety, health and general welfare, overcrowding, population, transportation, water/sewer, schools, parks, and other public requirements. The Subdivision Regulations (Ordinance) will provide regulatory measures for the development of raw land and be in harmony with the City's Comprehensive Plan and Zoning Regulations. The plan will be developed in two parts - Phase 1: Subdivision Ordinance; and Phase 2: Zoning Ordinance. Scope The Scope of Work should include, but not limited to: Phase I: Subdivision Ordinance • Develop general provisions; • Establish a decision-making authority; • Develop guidelines for Application submittal and processing procedures; • Develop guidelines for Plat submittal and Platting Procedures; • Develop guidelines for Construction Plan submittal and Procedures; • Develop Subdivision Design Standards; • Establish variance requirements/procedures for a petition for subdivision waiver; • Define terminology most commonly used in describing plan requirements/procedures; • Identifying City's policies relating to financially guaranteeing construction of required improvements and steps necessary for acceptance of improvements by the City; • Develop Draft Subdivision Procedures; • Develop Draft Subdivision Standards; • Prepare a Final Draft Subdivision Ordinance; Phase II: Zoning Ordinance • Develop general provisions; • Establish zoning districts throughout the corporate city limits; • Develop Land Uses; • Develop site development requirements; • Identify development review bodies (i.e., City Staff, Planning €t Zoning Commission, City Council, etc.); • Develop review procedures • Establish variance requirements/procedures for a petition for zoning waiver; • Develop draft zoning districts and land use regulations; • Develop draft development requirements (e.g., Landscaping); • Develop draft zoning procedures; Specific Requirements • Conduct meetings with Elected Officials, Boards, Commissions; • Conduct public meetings/hearing for plan adoption • Provide electronic/print files for review and final documents. Affected Organizations • City of Port Arthur (Local Government Municipality) • Drainage District #7 (DD #7) • Port Arthur Economic Development Corporation (PAEDC) • Port of Port Arthur (Port Authority) • Port Arthur Independent School District (PAISD) • Lamar State College-Port Arthur (LSCPA) Timeline/Schedule Time of Completion should come between 36 - 48 months following contract execution. End User Contacts We approve the project component as described above, and authorize the team to proceed. Name Title Date [type or sign name] Harvey Robinson Interim City Manager 08/01 /2018 Ronald Burton Assistant City Manager/Director of 08/01 /2018 Development Services End User Contacts We approve the project component as described above, and authorize the team to proceed. Name Title Date [type or sign name] Andrew Vasquez Director of Finance 08/01 /2018 Clifton Williams Purchasing Manager 08/01 /2018 Pamela Langford Development Services Manager 08/01 /2018 Type of Planning Services Requested Planning Comprehensive Planning Land Use Planning Historic Preservation Housing Planning Livable Centers Public Spaces & Streetscapes Transit-Oriented Design Parks & Trails Planning Strategic Planning Sustainable Development Planning Transportation Planning Access Management Corridor Planning Freight and Goods Movement Mobility Planning Parking Management Pedestrian & Bicyclist Planning Transit Planning Implementation & Regulation Financing Strategies & Economic Development Tools Growth management & Impact Fees Public & Private Partnerships Special District Financing & Creation Land Development & Regulations Annexation Overlay District Ordinances X Zoning Code & Development Regulations Site Planning Urban Design Studies & Additional Services Design Visualization Feasibility Studies Public Involvement Charrettes Community Outreach Tools Visual Preference Surveys Workshops, meeting Facilitation and Consensus Building Special Area Studies Environmental Justice Revitalization & Redevelopment Visioning Prepared By: Pamela D. Langford, Development Services Manager Remit (2) Copies (1) Copy to chosen firm for follow up (1) Copy to PlanSource via email: amanda.thorin@h-gac.com Subject: PlanSource P.R. NO.20743 04/08/2019 PDL PAGE 12 OF 22 EXHIBIT " B " Rev 06:tOP AGREEMENT FOR PROFESSIONAL SERVICES STATE OF TEXAS § COUNTY OF TARRANT § This Agreement is entered into by City of Port Arthur,Texas hereinafter called "Client"and Freese and Nichols, Inc., hereinafter called"FNI." In consideration of the Agreements herein,the parties agree as follows: I. EMPLOYMENT OF FNI: In accordance with the terms of this Agreement: Client agrees to employ FNI; FNI agrees to perform professional services in connection with the Project; Client agrees to pay to FNI compensation. The Project is described as follows: City of Port Arthur Zoning Ordinance Ii. SCOPE OF SERVICES: FNI shall render professional services in connection with Project as set forth in Attachment SC-Scope of Services and Responsibilities of Client which is attached to and made a part of this Agreement. Ill. COMPENSATION: Client agrees to pay FNI for all professional services rendered under this Agreement in accordance with Attachment CO - Compensation which is attached hereto and made a part of this Agreement. FNI shall perform professional services as outlined in the "Scope of Services" for a lump sum fee of$178,500. Details concerning the fee are included in Attachment CO. If FNI's services are delayed or suspended by Client,or if FNI's services are extended for more than 60 days through no fault of FNI, FNI shall be entitled to equitable adjustment of rates and amounts of compensation to reflect reasonable costs incurred by FNI in connection with such delay or suspension and reactivation and the fact that the time for performance under this Agreement has been revised. IV. TERMS AND CONDITIONS OF AGREEMENT: The Terms and Conditions of Agreement as set forth as Attachment TC shall govern the relationship between the Client and FNI. Nothing under this Agreement shall be construed to give any rights or benefits in this Agreement to anyone other than Client and FNI,and all duties and responsibilities undertaken pursuant to this Agreement will be for the sole and exclusive benefit of Client and FNI and not for the benefit of any other party. This Agreement constitutes the entire Agreement between Client and FNI and supersedes all prior written or oral understandings. This contract is executed in two counterparts. IN TESTIMONY HEREOF, they have executed this Agreement,the day of , 2019. ATTEST: City of Port Arthur,Texas (Client) By: Print or Type Name and Title ATTEST: Freese and Nichols,Inc. (FNI)&vv._ Law r ev c:t.'P. F GtacS�Q — C.D,O• Print or Type Name and Title lfreese comlfnunc2'ResourcesOLCRI.RPon Ardlw\Subdivision Crdmance Updated.Zoning Ordinance Conuac:-Zoning ordinance 201904 25 dccx ATTACHMENT SC SCOPE OF SERVICES AND RESPONSIBILITIES OF CLIENT ARTICLE I BASIC SERVICES: FNI shall render the following professional services in connection with the development of the Project: ZONING ORDINANCE Division 1: Introduction The purpose of this Scope of Services is to develop a new zoning ordinance to replace the City's existing zoning ordinance. Division 2: Outline of the New Zoning Regulations The new zoning ordinance will be generally organized as follows and will address the following sections. Section 1.General Provision 1.01. Enacting Clause 1.02. Purpose 1.03. Zoning District Map Regulations 1.04. Zoning District Boundaries 1.05. Compliance Required/ Interpretation/Rules of Construction Section 2.Zoning Districts 2.01. Zoning Districts Established 2.02. Equivalency Table 2.03. Residential Zoning Districts 2.04. Nonresidential Zoning Districts 2.05. Special Zoning Districts* 2.06. Dimensional Standards Tables (*A Downtown Zoning District will be addressed.) Section 3. Land Uses 3.01. Uses Permitted by District 3.02. Classification of New and Unlisted Uses 3.03. Use Chart 3.04. Conditional Development Standards 3.05. Regulations of Specific Uses 3.06. Nonconforming Uses and Structures Section 4. Site Development Requirements 4.01. Landscape Requirements** 4.02. Screening Standards 4.03. Off-Street Parking and Loading Requirements 4.04. Lighting Standards 4.05. Accessory Structure Standards 4.06. Supplementary Regulations 4.07. Nonresidential Development Standards 4.08. Nonresidential Design Standards 4.09. Residential Development Standards 4.10. Residential Cluster Development Option 4.11. Tree Preservation Requirements freese com fni,nc21Resources OLCR\MPan Arthur\Subdvisron Ordinance Lpdued Zoning Ordnance Contract-Zoning Ordinance 2019 04 25 dot's FNI Qv SC-1 Client ATTACHMENT SC I**City Staff will develop and FNI will incorporated into the zoning ordinance.) Section 5. Development Review Bodies 5.01. City Staff 5.02. Planning&Zoning Commission 5.03. City Council 5.04. Board of Adjustment Section 6. Development Review Procedures 6.01. Zoning Upon Annexation 6.02. Zoning Text and Map Amendments 6.03. Platting Property Not Zoned 6.04. Creation of Building Site 6.05. Certificates of Occupancy and Compliance 6.06. Site Plan Requirements 6.07. PD Application and Review 6.08. Specific Use Permit(SUP) 6.09. Amortization of Nonconforming Uses 6.10. Vesting and Complete Application Requirements Section 7.Zoning Relief Procedures 7.01. Zoning Regulation Appeal 7.02. Zoning Variance 7.03. Zoning Special Exception 7.04. Zoning Vested Rights Petition Section 8. Definitions Division 3: General Approach to Preparation of the Zoning Ordinance Diagnostic Report The City recently completed a Zoning Diagnostic Report to lay the foundation for the creation of the new zoning ordinance. This report analyzed and made recommendations regarding the City's existing zoning practices and approval processes. Specifically,the definition of problems and issues arising out of the City's current zoning ordinance and practices has already been identified. FN1 will utilize the Zoning Diagnostic Report as the guiding document to draft the new Zoning Ordinance. Preparation of the New Zoning Ordinance The development process for creating the new zoning ordinance will be divided into three distinct parts: (1) zoning districts and land uses,(2)development requirements and (3)zoning procedures. The rationale for dividing the zoning ordinance review into three parts is to allow for focused and topical discussion between City Staff and FNI. Additionally,the review of the zoning ordinance is more efficient if divided into manageable parts, rather than attempting to review the entire ordinance at one time. Experience has proven that dividing the Ordinance into parts allows for more in-depth discussion, review, and understanding of the material. Public Input,Review,and Ordinance Adoption Based upon City Staff comments, FNI will prepare any revisions for to the zoning ordinance. A document, as approved by the City Staff,will be delivered to the City. The ordinance will also be delivered in an electronic format suitable for display to the public. lfreese com`fnunc2lResources`OLCRPPon ArthurlSubditision Ordinance.Updated-Zoning Ordinance•Contract-Zoning Ordinance 20190.1 25 docx FNI tf• e SC-2 Client ATTACHMENT SC After the public review draft has been created,opportunities will be given for public input. Specifically, at the end of public workshops, time should be budgeted to allow for public comments. It is assumed that after watching the ordinance presentation by FNI and the discussion by either the City Council or Planning and Zoning Commission that the public may want to ask questions and provide their input at the end of these workshops. Division 4: Project Services Task 1:Develop Draft Zoning Districts and Land Use Regulations • FNI will draft Section 1,Section 2,and Section 3 of the new zoning ordinance(please see Division 2 for an outline of included elements). ■ A revised zoning ordinance map will be prepared as part of this task. • FNI will hold one(1)orientation meeting with City Staff. The purpose of the meeting is for FNI to unveil and provide a detailed explanation of the elements within this task before City Staff conducts a review of the text. The orientation meeting enables City Staff to become familiar with the new text and the rationale behind the text to increase the efficiency of the review process. • After the orientation meeting, two (2)staff feedback meetings will be held to review City Staff comments.One meeting will be in-person and the second meeting will be a conference call. • Meetings: Three (3)meetings will be held for Task 1. Task 2:Develop Draft Development Requirements(e.g.,Landscaping Requirements) • FNI will draft Section 4 of the new zoning ordinance(please see Division 2 for an outline of included elements). • FNI will hold one(1)orientation conference call meeting with City Staff. • After the orientation meeting,two(2)staff feedback meetings will be held to review City Staff comments.The first meeting will be in-person and the second meeting will be a conference call. • Meetings: Three (3)meetings will be held for Task 2. Task 3:Develop Draft Zoning Procedures(e.g.,Site Plans, Variances, Vested Rights,etc.) • FNI will draft Section 5,Section 6, and Section 7 of the new zoning ordinance(please see Division 2 for an outline of included elements). • FNI will hold one(1)orientation conference call meeting with City Staff. • After the orientation meeting, two(2)staff feedback meetings will be held to review City Staff comments.The first meeting will be in-person and the second meeting will be a conference call. • Meetings: Three (3)meetings will be held for Task 3. lfreese earn 6rune2'Resources OLCR7Pon AnhuASubdivuion OrdinanceUpdated-Zoning Ordinance Contract-Zoning Ordinance 2019 04 25 dace FNIG..— SC-3 Client ATTACHMENT SC Task 4:Public Workshops for the City Council and the Planning and Zoning Commission • FNI will present the zoning ordinance at two (2)Planning and Zoning Commission workshops and two(2) City Council workshops. • Similar to the City Staff orientation meetings,these workshops are designed to provide a foundation to help the City Council and the Planning and Zoning Commission understand the new zoning ordinance and its benefits. • These workshops shall take approximately 90 to 120 minutes and will be an overview of the entire ordinance. • Meetings:Four(4) Public Workshops for Task 4. Task 5:Public Hearings • FNI will present the zoning ordinance at one(I)public hearing for the Planning and Zoning Commission and one(1)public hearing for the City Council. • Meetings: Two(2) Public Hearings for Task 5. Division 5: Total Number of Meetings This scope includes the 15 meetings,as outlined below. • Task I: Three(3) City Staff Meetings, with one of these meetings being a conference call. • Task 2:Three(3)City Staff Meetings,with one of these meetings being a conference call. • Task 3:Three(3) City Staff Meetings,with one of these meetings being a conference call. • Task 4: Four(4)Public Workshops. • Task 5: Two(2) Public Hearings. Division 6: Deliverables FNI will provide the City with all electronic files needed to open and edit the final document, including Microsoft Word,Adobe PDF,and GIS files(if necessary). No hard copies will be provided for any documents (include review and final documents) ARTICLE 11 ADDITIONAL SERVICES: Additional Services to be performed by FNI, if authorized by Client,which are not included in the above described basic services, are described as follows: A. Providing renderings, model, and mock-ups requested by the Client. B. Making revisions to drawings or other report documents when such revisions are 1)not consistent with approvals or instructions previously given by Client or 2) due to other causes not solely within the control of FNI. C. Providing services to investigate existing conditions or facilities, or to make measured drawings thereof,or to verify the accuracy of drawings or other information furnished by Client. D. Meeting or trips in excess of the number of meetings included in Article I for site visits,coordination meetings,or other activities. lfreese mmlfiunePResouses OLCRIP\Port Anhur1Subdmston Ordinance Updated-Zoning Ordinance Contract•Zontng Ordinance 2019 09 25 dote FNI geL SC-4 Client ATTACHMENT SC E. Preparing applications and supporting documents for government grants, loans,or planning advances and providing data for detailed applications. F. Preparing data and reports for assistance to Client in preparation for hearings before regulatory agencies,courts,arbitration panels or any mediator,giving testimony,personally or by deposition,and preparations therefore before any regulatory agency,court, arbitration panel or mediator. G. Design, contract modifications, studies or analysis required to comply with local, State, Federal or other regulatory agencies that become effective after the date of this agreement. H. Providing basic or additional services on an accelerated time schedule. The scope of this service include cost for overtime wages of employees and consultants, inefficiencies in work sequence and plotting or reproduction costs directly attributable to an accelerated time schedule directed by the Client. I. Preparing statements for invoicing or other documentation for billing other than for the standard invoice for services attached to this professional services agreement. J. Providing document revisions in excess of those outlined in Article I. ARTICLE III FNI is authorized to commence work on the Project upon execution of this Agreement and agrees to complete the services within twenty-four(24)months. If FNI's services are delayed through no fault of FNI, FNI shall be entitled to adjust contract schedule consistent with the number of days of delay. These delays may include but are not limited to delays in Client or regulatory reviews, delays on the flow of information to be provided to FNI, governmental approvals, etc. These delays may result in an adjustment to compensation as outlined on the face of this Agreement and in Attachment CO. ARTICLE IV RESPONSIBILITIES OF CLIENT: Client shall perform the following in a timely manner so as not to delay the services of FNI: A. Provide meeting space and coordinate equipment needs, room set up, and logistics for meetings outlined in Article I. B. Contact meeting invitees for stakeholder and public meeting. This includes email, mail, newsletter or other forms of notification. C. Designate in writing a person to act as Client's representative with respect to the services to be rendered under this Agreement. Such person shall have contract authority to transmit instructions, receive information, interpret and define Client's policies and decisions with respect to FNI's services for the Project. D. Arrange for access to and make all provisions for FNI to enter upon public and private property as required for FNI to perform services under this Agreement. "Freesm Vnunc2'R,sources'OLCIMPon Anhur1Subdn,sion OrdmanceUpdated-Zoning Ordmance,Contran-Zoning Ordinance 2019 04 25 doe, FNI t SC-5 Client ATTACHMENT SC E. Examine and provide prompt feedback on all submittals, draft reports, sketches, drawings, and other documents presented by FNI within a reasonable time so as not to delay the services of FNI. F. Furnish,or direct FNI to provide,Additional Services as stipulated in Attachment SC,Article II of this Agreement or other services as required. G. Bear all costs incident to compliance with the requirements of this Article IV. ARTICLE V DESIGNATED REPRESENTATIVES: FNI and Client designate the following representatives: Client's Designated Representative Name: 444 4th Street Port Arthur,Texas 77640 409-983-8100 Email: Client's Accounting Representative Name: 444 4th Street Port Arthur,Texas 77640 409-983-8100 Email: FNI's Designated Representative Daniel Harrison,AICP 2711 North Haskell Avenue, Suite 3300 Dallas,Texas 75204 214-217-2212 deh@freese.com FNI's Accounting Representative Stephanie Kirchstein 2711 North Haskell Avenue, Suite 3300 Dallas,Texas 75204 214-217-2212 Stephanie.Kirchstein@freese.com freese com-fnunc2\Resourees OLCR'PIPort Arthur\Subdrvrsron OrdrnancetUpdated-Zoning OrdrnancelCOntnacl-Zoning Ordinance 201904 25 door FNI v)e. SC-6 Client ATTACHMENT CO ATTACHMENT CO COMPENSATION Compensation to FNI shall be the lump sum fee of One Hundred Seventy-Five Thousand Five Hundred Dollars($178,500) If FNI sees the Scope of Services changing so that additional services are needed, including but not limited to those services described as Additional Services in Attachment SC, FNI will notify CLIENT for CLIENT'S approval before proceeding. Additional Services shall be computed based on the Schedule of Charges Schedule of Charges: posttion ERD hIgA Professional 1 71 129 Professional 2 95 176 Professional 3 120 196 Professional4 134 211 Professional 5 160 267 Professional 6 168 344 Construction Manager 1 87 157 Construction Manager 2 96 164 Construction Manager 3 132 181 Construction Manager 4 166 245 CAD Technician/Designer 1 59 112 CAD Technician/Designer 2 85 133 CAD Technician/Designer 3 111 178 Corporate Project Support 1 43 109 Corporate Project Support 2 64 147 Corporate Project Support 3 84 230 Intern/Coop 37 73 Rates for In-House Services Technology Charge Sulk Printing and Reproduction $8.50 per hour B&W Color Small Format(per copy) $0 10 $0.25 Travel Large Format(per sq n) Standard IRS Rates Bond $0.25 $0.75 Glossy/Myler $0 75 $125 Vinyl/Adhesive $1.50 $2.00 Mounting(per sq.ft.) $2.00 Binding(per binding) $0.25 OTHER DIRECT EXPENSES: Other direct expenses are reimbursed at actual cost times a multiplier of 1.10. They include outside printing and reproduction expense, communication expense, travel, transportation and subsistence away from the FNI office and other miscellaneous expenses directly related to the work, including costs of laboratory analysis, test, and other work required to be done by independent persons other than staff members For Resident Representative services performed by non-FNI employees and CAD services performed In-house by non-FNI employees where FNI provides workspace and equipment to perform such services, these services will be billed at cost times a multiplier of 2.0.This markup approximates the cost to FNI if an FNI employee was performing the same or similar services. These ranges and rates will be adjusted annually In February. Last updated February 2019. :J0220t9 CO— I FNI OW Clicnt 12-01-16 ATTACHMENT TC TERMS AND CONDITIONS OF AGREEMENT 1. DEFINITIONS: The term Client as used herein refers to City of Port Arthur,Texas. The term FNI as used herein refers to Freese and Nichols,Inc.,its employees and agents;also its subcontractors and their employees and agents. As used herein, Services refers to the professional services performed by Freese and Nichols pursuant to the AGREEMENT. 2. CHANGES: Client,without invalidating the AGREEMENT,may order changes within the general scope of the WORK required by the AGREEMENT by altering, adding to andior deducting from the WORK to be performed. If any change under this clause causes an increase or decrease in FNI's cost of,or the time required for,the performance of any part of the Services under the AGREEMENT, an equitable adjustment will be made by mutual agreement and the AGREEMENT modified in writing accordingly. 3. TERMINATION: The obligation to provide services under this AGREEMENT may be terminated by either party upon ten days' written notice. In the event of termination, FNI will be paid for all services rendered and reimbursable expenses incurred to the date of termination and,in addition,all reimbursable expenses directly attributable to termination. 4. CONSEQUENTIAL DAMAGES: In no event shall FM or its subcontractors be liable in contract,tort,strict liability, warranty,or otherwise for any special,indirect, incidental or consequential damages,such as loss of product,loss of use of the equipment or system, loss of anticipated profits or revenue, non-operation or increased expense of operation or other equipment or systems. 5. 5.INFORMATION FURNISHED BY CLIENT: Client will assist FNI by placing at FM's disposal all available information pertinent to the Project including previous reports and any other data relative to design or construction of the Project. FNI shall have no liability for defects or negligence in the Services attributable to FN1's reliance upon or use of data, design criteria,drawings,specifications or other information furnished by Client and Client agrees to indemnify and hold FNI harmless from any and all claims and judgments,and all losses,costs and expenses arising therefrom. FNI shall disclose to Client,prior to use thereof,defects or omissions in the data,design criteria,drawings,specifications or other information furnished by Client to FNI that FNI may reasonably discover in its review and inspection thereof. 6. INSURANCE: FNI shall provide to Client certificates of insurance which shall contain the following minimum coverage: Commercial General Liability Workers'Compensation General Aggregate $2,000,000 Each Accident $1,000,000 Automobile Liability(Any Auto) Professional Liability CSL $1,000,000 $3,000,000 Annual Aggregate 7. SUBCONTRACTS: If,for any reason,at any time during the progress of providing Services,Client determines that any subcontractor for FM is incompetent or undesirable,Client will notify FM accordingly and FNI shall take immediate steps for cancellation of such subcontract. Subletting by subcontractors shall be subject to the same regulations. Nothing contained in the AGREEMENT shall create any contractual relation between any subcontractor and Client. 8. OWNERSHIP OF DOCUMENTS: All drawings,reports data and other project information developed in the execution of the Services provided under this AGREEMENT shall be the property of the Client upon payment of FNI's fees for services. FNI may retain copies for record purposes. Client agrees such documents are not intended or represented to be suitable for reuse by Client or others. Any reuse by Client or by those who obtained said documents from Client without written verification or adaptation by FNI will be at Client's sole risk and without liability or legal exposure to FM, or to FNI's independent associates or consultants,and Client shall indemnify and hold harmless FNI and FNI's independent associates and consultants from all claims,damages,losses and expenses including attorneys'fees arising out of or resulting therefrom. Any such verification or adaptation will entitle FNI to further reasonable compensation. FNI may reuse all drawings,report data and other project information in the execution of the Services provided under this AGREEMENT in FNI's other activities. Any reuse by FNI will be at FNI's sole risk and without liability or legal exposure to Client, and FM shall indemnify and hold harmless Client from all claims,damages,losses and expenses including attorneys'fees arising out of or resulting therefrom. Page I of 2 FNI _ CLIENT 9. POLLUTANTS AND HAZARDOUS WASTES: It is understood and agreed that FNI has neither created nor contributed to the creation or existence of any hazardous, radioactive, toxic, irritant, pollutant,or otherwise dangerous substance or condition at the site,if any,and its compensation hereunder is in no way commensurate with the potential risk of injury or loss that may be caused by exposures to such substances or conditions. The parties agree that in performing the Services required by this AGREEMENT, FNI does not take possession or control of the subject site, but acts as an invitee in performing the services,and is not therefore responsible for the existence of any pollutant present on or migrating from the site. Further,FNI shall have no responsibility for any pollutant during clean-up,transportation,storage or disposal activities. 10. OPINION OF PROBABLE COSTS: FNI will furnish an opinion of probable project development cost based on present day cost,but does not guarantee the accuracy of such estimates. Opinions ofprobable cost,financial evaluations,feasibility studies,economic analyses of alternate solutions and utilitarian considerations of operations and maintenance costs prepared by FM hereunder will be made on the basis of FNI's experience and qualifications and represent FM's judgment as an experienced and qualified design professional. It is recognized,however,that FNI does not have control over the cost of labor,material,equipment or services furnished by others or over market conditions or contractors'methods of determining their prices. II. CONSTRUCTION REPRESENTATION: If required by the AGREEMENT, FN1 will furnish Construction Representation according to the defined scope for these services. ENI will observe the progress and the quality of work to determine in general if the work is proceeding in accordance with the Contract Documents. In performing these services,FNI will endeavor to protect Client against defects and deficiencies in the work of Contractors; FNI will report any observed deficiencies to Client, however, it is understood that FN1 does not guarantee the Contractor's performance, nor is FNI responsible for the supervision of the Contractor's operation and employees. FNI shall not be responsible for the means, methods, techniques, sequences or procedures of construction selected by the Contractor, or the safety precautions and programs incident to the work of the Contractor. FM shall not be responsible for the acts or omissions of any person(except his own employees or agent)at the Project site or otherwise performing any of the work of the Project. If Client designates a person to serve in the capacity of Resident Project Representative who is not a FM's employee or FNI's agent,the duties, responsibilities and limitations of authority of such Resident Project Representative(s)will be set forth in writing and made a part of this AGREEMENT before the Construction Phase of the Project begins. 12. PAYMENT: Progress payments may be requested by FNI based on the amount of services completed. Payment for the services of FNI shall be due and payable upon submission of a statement for services to CLIENT and in acceptance of the services as satisfactory by the CLIENT. Statements for services shall not be submitted more frequently than monthly. Any applicable new taxes imposed upon services,expenses, and charges by any governmental body after the execution of this AGREEMENT will be added to FNI's compensation. If CLIENT fails to make any payment due FNI for services and expenses within thirty (30) days after receipt of FNI's statement for services therefore,the amounts due FM will be increased at the rate of one percent(1%)per month from said thirtieth(30th)day,and,in addition,FN1 may,after giving seven(7)days'written notice to CLIENT,suspend services under this AGREEMENT until FM has been paid in full,all amounts due for services,expenses and charges. 13. ARBITRATION: No arbitration arising out of, or relating to, this AGREEMENT involving one party to this AGREEMENT may include the other party to this AGREEMENT without their approval. 14. SUCCESSORS AND ASSIGNMENTS: CLIENT and FNI each are hereby bound and the partners,successors,executors, administrators and legal representatives of CLIENT and FM are hereby bound to the other party to this AGREEMENT and to the partners, successors, executors, administrators and legal representatives (and said assigns) of such other party, in respect of all covenants,agreements and obligations of this AGREEMENT. Neither CLIENT nor FNI shall assign,sublet or transfer any rights under or interest in(including,but without limitation, moneys that may become due or moneys that are due)this AGREEMENT without the written consent of the other,except to the extent that any assignment,subletting or transfer is mandated by law or the effect of this limitation may be restricted by law. Unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under this AGREEMENT. Nothing contained in this paragraph shall prevent FNI from employing such independent associates and consultants as FM may deem appropriate to assist in the • performance of services hereunder. 15. PURCHASE ORDERS: If a Purchase Order is used to authorize FM's Services,only the terms,conditions/instructions typed on the face of the Purchase Order shall apply to this AGREEMENT. Should there be any conflict between the Purchase Order and the terms of this AGREEMENT,then this AGREEMENT shall prevail and shall be determinative of the conflict. Page 2of2 XIS CLIENT