Loading...
HomeMy WebLinkAboutPR 20801: JADE AVENUE SEWER MAIN REPLACEMENT PHASE I CLOESOUT u 1 City of , Vi)rt r1\ „' , 4 Tip ru,. INTEROFFICE MEMORANDUM Date: April 17, 2019 To: The Honorable Mayor and City Council Through: Rebecca Underhill, Interim City Manager From: Donnie Stanton, Interim Director of Water Utilities .p.-- - RE: -- RE: PR 20801 —Jade Avenue Sewer Main Replacement Phase 1 Closeout Documents Introduction: The intent of this Agenda Item is to seek City Council's approval for close out of Jade Avenue Sewer Line Replacement, Phase 1 and authorize the City Manager to pay the release of retainage invoice of$31,350.52. The final project cost of this phase is $313,505.20. Background: In October of 2018, the Council passed Resolution #18-447, awarding the Replacement of the Sewer Line on Jade Avenue — Phase 1 contract to PM Construction and Rehab, LLC DBA South Central, LLC of Pasadena, TX. The project was managed by Action Civil Engineering. This resolution includes the final invoice for the project and includes the retainage. Budget Impact: The original contract amount was $368,150.00. The contract amount after a deductive Change Order of$54,644.80, resulted in the final project cost of$313,505.20. Recommendation: It is recommended that City Council adopt Proposed Resolution No. 20801, which closes out the project, authorizing the City Manager to accept the project and authorize release of the retainage of$31,350.52. "Remember,we are here to serve the Citizens of Port Arthur" P.R. No. 20801 5/7/19 ds Page 1 of 3 RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDER NO. 1 BETWEEN THE CITY OF PORT ARTHUR AND PM CONSTRUCTION & REHAB, LLC, DBA IPR SOUTH CENTRAL, LLC, OF PASADENA, TEXAS, FOR THE JADE AVENUE SEWER LINE REPLACEMENT — PHASE ONE (1) PROJECT, FOR A DEDUCTIVE CHANGE OF $54,644.80, TO A NEW CONTRACT TOTAL OF $313,505.20 AND AUTHORIZING THE CITY MANAGER TO ACCEPT AND EXECUTE THE ENGINEER'S CERTIFICATE OF COMPLETION, CONTRACTOR'S CERTIFICATE AND RELEASE, CONTRACTOR'S CERTIFICATE OF GUARANTEE, THE CERTIFICATE OF ACCEPTANCE ON BEHALF OF THE CITY OF PORT ARTHUR, TEXAS, AND RELEASE OF RETAINAGE IN THE AMOUNT OF$31,350.52 FROM ACCOUNT NO. 410-0000-205.00-00 (CONTRACT RETAINAGE). WHEREAS,per Resolution No. 18-447 dated October 23,2018,the City Council awarded a contract for the Jade Avenue Sewer Line Replacement - Phase 1 to PM Construction and Rehabilitation DBA IPR South Central, LLC of Pasadena, Texas, in the amount of$368,150.00; and, WHEREAS,Change Order No. 1 is a deductive change in the amount of$54,644.80 to a new contract total of$313,505.20, attached hereto as Exhibit"B"; and, WHEREAS, PM Construction and Rehabilitation DBA IPR South Central, LLC has completed the contracted project to the satisfaction of the project engineer and the City staff; and, WHEREAS, the City has received the Engineer's Certificate of Construction and Completion,dated February 26,2019 from Action Civil Engineering of Port Arthur,Texas, stating that to the best of their knowledge, Jade Avenue Sewer Line Replacement- Phase 1,has P.R. No. 20801 5/7/19 ds Page 2 of 3 been completed in general accordance with City standards, (Exhibit "A"), together with a Contractor's Certificate of Guarantee (Exhibit "C") executed by PM Construction and Rehabilitation DBA IPR South Central, LLC; and, WHEREAS,the retainage for this project is due, as the work is completed and billed, and the project engineer, Action Civil Engineers, PLLC, approves release of retainage to PM Construction& Rehab, LLC, in the amount of$31,350.52 (Exhibit"E"). NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT, Change Order No. 1 is herein approved and the City Manager is hereby authorized to execute said Change Order No. 1 (attached as Exhibit "B") to the contract between the City of Port Arthur and PM Construction & Rehab, LLC, DBA IPR South Central, LLC, of Pasadena, Texas. THAT,Change Order No. 1 decreases the contract by$54,644.80 to a new contract amount of$313,505.20. THAT, the City Manager is hereby authorized to execute on behalf of the City the Engineer's Certificate of Completion (Exhibit "A"), the Contractor's Certificate of Guarantee (Exhibit"C"), the Certificate of Acceptance (Exhibit"D") for the completion of the Jade Avenue Sanitary Sewer Rehabilitation Project, and the Release of Retainage to PM Construction, Rehab, LLC, in the amount of 31,350.52 (Exhibit"E"). THAT, a copy of the caption of this Resolution be spread upon the minutes of the City Council. P.R. No. 20801 5/7/19 ds Page 3 of 3 READ, ADOPTED,AND APPROVED THIS day of , 2019 at a Regular Meeting of the City Council of the City of Port Arthur, Texas, by the following vote: AYES: Mayor: Councilmembers: NOES: Derrick Freeman Mayor ATTEST: APPROVED AS TO FORM: 1t,. / e °lF d r-- Sherri Bellard V. it is Ti eno City Secretary Ci Atto ey APPROVED FOR ADMINISTRATION: (jdjuoi., Rebecca Underhill, CPA Clifto Williams, CPPB Interim City Manager Purchasing Manager Donald Stanton Interim Director of Water Utilities APPROVED AS TO AVAILABILIT OF FUNDS: OLS` Kandy Daniel Interim Director of Finance EXHIBIT A (Engineer's Certificate of Completion) <, JADE AVE.SANATIRY SEWER REHABILITATION PROJECT STATE HWY 365 TO 63RD STREET OF it§ TWELVE INCH(12")CONCRETE SEWER LINE BY PIPEBURSTING TO A SIXTEEN INCH 16" IPS rel:; SDR 17 HOPE PIPE Certificate of Construction Completion (SUBMIT ONE FOR EACH PRIME CONSTRUCTION CONTRACT) Owner: City of Port Arthur This is to certify that a final inspection of the project described below was conducted on the 26 ,day of February.2019. Contract was entered into on the 15 day of November,2018 between the City of Port Arthur and PM Construction&Rehab. LLC,131 N.Richey,Pasadena,TX 77506 for JADE AVE.SANATIRY SEWER REHABRITArION PROJECT STATE HWY 365 TO 63RD STREET Of TWELVE INCH 112")CONCRETE SEWER LINE BY PIPEBURSTING TO A SIXTEEN INCH 116"){IPS)SDR 17 HOPE PIPE This is to further certify that: 1.The work has been completed in accordance with the plans and specifications and all addenda,change orders and supplemental agreements thereto,with the following exceptions: None 2.The sum of$ 0.00 deducted from the final payment to the Contractor is a fair and equitable settlement for the foregoing excepted work. 3.The Contractor has presented on behalf of itself and its sureties,satisfactory evidence that he or she will repair,replace and make good any faulty workmanship and/or materials discovered In the work within a period of 12 months from this date, Ifo day of February.2019 as provided in the Contract. 4,Amount of Original Contract$ $ 368,150.00 Cumulative Change Orders 5 $ -54,644.80 Final Amount of Contract$ $ 313,505,20 Less Previous Payments$ $ 282,154.68 Less Deductions(from 42 above)$ $ 0.00 FINAL PAYMENT;Balance)$ S 31,350.52 5.The Final Payment in the amount above is now due and payable. —1 Certified by: f �/ /,.‘•: ' / . , . (\,,,,,_ / ,--n ( /''-. / Engineer Signature oatractor Signature C.E.O.-Signature dv-ifisiv fry4,-/v;i1 Engineer Name-Printed Contractor Name-Printed C.E.O.Name-Printed Title "Kt' T tl. Title ,,,-,e/e0-/ v, oriee pg (0,.. /T,, i._,,,„iri__ le.t4., Firm J Firm District EXHIBIT B (PM Construction& Rehab, LLC Change Order No. 1) JADE AVE. SANATIRY SEWER REHABILITATION PROJECT STATE HWY 365 TO 63RD STREET OF TWELVE INCH (12")CONCRETE SEWER 'rA — LINE BY PIPEBURSTING TO A SIXTEEN INCH(16")(IPS)SDR 17 HDPE PIPE Engineer: Owner Contractor City of Port Arthur PM Construction&Rehab,L1C ActanCivll Engineers,PLLC 444 4th Street 131 fe.Richey 3727 Doctors Drive Pert Arthur,TX 77640 Pasadena.TX 77506 Port Arthur,Texas 77642 Agreement Date:11/15/2018 Phone No.:409-983-6263 Phone No.-409-794-2338 Phone No.:832-252-4800 Contract For: ACE Job No.: Jade Ave.Improvements 117-26 Date:3/25/2019 Change Order No..1&Final You are hereby requested to comply with the following changes front the contract plans and specifications: Item 'Description of Changes:Quantities,Units,Unit Prices,Change In Decrease In Contract Price I Increase in No. Completion Scheduled,Etc. Contract Price 1 MOBILIZATION AND DEMOBILIZATION 2 CLEAN&TELEVISE 12"GRAVITY SANITARY SEWER FOR PIPE BURSTING&SERVICE LOCATION,COMPLETE IN PLACE -510,800.00 12"SEWER RECONSTRUCTION BY PIPE 3 BURSTING EXISTING 12'SEWER,INSTALL (16")(IPS)SDR 17 HOPE PIPE, ALL DEPTHS COMPLETE IN PLACE $1,247.00 4 EXTRA DEPTH ON CONCRETE SANITARY SEWER MANHOLE -$2,000.00 S REMOVE AND DISPOSE OF EXISTING -+ MANHOLE COMPLETE IN PLACE 560000 *STANDA1YE 4'DIA.LONLRt It MANHOLES,WITH WAlER - TIGHT RING AND COVER,BUILT ABOUT NEW LINE OR ON 6 EXISTING LINES INCLUDING EXCAVATION,DEWATERING, TRENCH SAFETY SYSTEM,CEMENT STABILIZED SAND BACKFILL COMPLETE IN PLACE $5,00D.00 2 4"PVC SERVICE LINE COMPLETE IN PLACE,INCLUDING BORE/PIPE BURST AS NEEDED -56,698.00 CLEANOUT LOCATED AT PROPERTY LINE 8 INCLUDING ALL FITTINGS&CLEAN OUT BOX,COMPLETE IN PLACE $200.00 CONNECT NEW 4'SERVICE LINE TO EXISTING 4"SERVICE LINE 9 AT PROPERTY LINE INCLUDING ALL FITTINGS COMPLETE IN PLACE -5200.00 CONNECT NEW 4"SERVICE LINE TO NEW SEWER MAIN 10 INCLUDING SAW-CUT AS REQUIRED,ALL FITTINGS COMPLETE IN PLACE -$300.00 LI "610"LIMESTONE ROCK FOR DRIVEWAY MAINTENANCE (LOOSE DUMP AND SPREAD) -55,000.00 POINT REPAIRS 15"TO REMOVE OBS ERUCT IONS OR TO ALLEVIATE REVERSE FLOW SITUATIONS(10'MINIMUM), 12 INCLUDING EXCAVATION,BACKFILL,REPLACEMENT PIPE AND JOINING COMPLETE IN PLACE WHEN AUTHORIZED BY THE ENGINEER -55,000 00 REMOVE AND REPLACE EXIST,12"STEEL CASING IN 60"X 48" CONCRETE BOX CULVERT AT STA.21+37.50,INSTALL NEW 13 (16")(IPS)SDR 17 HDPE PIPE IN NEW 20"STEEL CASING, CONNECT NEW HDPE PIPE TO NEW HOPE PIPE USING 24" STAINLESS STEEL WRAP AROUND BAND,BACKFILL WITH CEMENT STABILIZED SAND,COMPLETE IN PLACE 1 1/2"ASPHALTIC CONCRETE SURFACE 14 REPLACEMENT(ROADWAY OR DRIVEWAY),COMPLETE IN PLACE -576,785 20 _ 17 MANHOURS WHEN AUTHORIZED BY THE ENGINEER -5600.00- 18 5600,0018 TRUCK HOURS WHEN AUTHORIZED BY THE ENGINEER -51,050.00 19 BACK HOE/LOADER HOUR WHEN AUTHORIZED BY THE ENGINEER -51,500.00 Construction Contract Change Order Request 20 CEMENT STABILIZED SAND BACKFILL 1-1/2 SACK/C.Y.WHEN AUTHORIZED BY THE ENGINEER $1,446.40 EXTRA CLASS-A CONCRETE-BULK,COMPLETE IN PLACE WHEN AUTHORIZED BY THE ENGINEER .St00 00 EXTRA CLASS-A CONCRETE-FORMED,COMPLETE IN PLACE WHEN AUTHORIZED BY THE ENGINEER -$900.00 21 REINFORCING STEEL WHEN AUTHORIZED BY THE ENGINEER -51.500.00 SUBTOTAL -S63.133 20 $8,41118.40 TOTAL -554,544.10 Shang In CON•14t btu Chaos*In Contract Time ICahRdar Daef( {Irrgteaf Contract Price: $ 368,150.00 Or,pnal Contract Time: I50 days P+e.:nv:Change Order(s): Net Change From Previous No 1 to No. 1 $ Change Orders: 0 daps -Contract Price Prior to Contract Time Prior to IM.,Change Order: $ 368,15000 tMo Change Order 150 d, Net+waaato/Derrease of '� this Change Order: 554.644 g0 Net ChanIncrege r of this Change Order: 0 daps Contract Price With all Ap +rred Change Orders: $ 313,505 20 Contras Time With all pr Clung.Orders: ISO days Cwnutahve Percent Change in Contract Price(+f-(: 14 g4% 0 004. Constroctnrn Contract Start Date! II/IS/2018 C.3011,If Inn Contract End Date: prem/do/rel (mmlrloiwi ti1ai2019 / RECOMMEND A• •• APPROVED: /// ',/ /� ��� ACCEPTED: ! �4! /I�i�l�>/�a Bp `I1 ENGINEER ! /4,,,,fig- BY .itif ,�y, OWNER ta)NiR )R ^7 / Date: p S'oil Date: 7/-4//2„/7 Iso / 4'Y G,v Construction Contract Change Order Request EXHIBIT C (PM Construction & Rehab, LLC, Contractor's Certificate of Guarantee) -1 - 3 s7• ag5. a z5S.'?.... . To. n Z s lUll o , R. ❑ =+ ..j .� Q m 't� Z ren I! IIU frS 144 • col qq r — n i R7 c o Z ' 3 m_ m' i 01 ��y C o n b m m : 50 = n a �n.�1 C '�-3 v �' °, n O r `° _ o"3 do •G ..< O Mir •.,,i pp. y 7, , f n o a y z N +� tll 33 v �_ Z 0OlJ4 •�•.. '��� C =; ate t 1 n�rj^13, _ - rt• m 'oa ^ ! , }tIl tri CA . os. : i- =. .n7 sgF O 1—J > r1�—: '- - I• = `n^Er 5 m 70C U ` j > t 7-%Iftep tHU .4,.. m- rtc g � � 5 n x 6 E it ePc E. M n O m O '..3 O ISM Ir y� p p1 rt ,o.,, '7 C a < C a 'V1, OW - n ,......., ,_,,,i g -1 v g p •�'m 15 5 Pl m .j O X Z ...1 — --1 Mei J l, �3 ►TI Pio e ; g 4 ti, :::: .,,*„, .., ,,,, E. :• " R F, a• x O it -i c 0 r t! H N y °. HJ W P p a r sp cc , p. �.A)I v z. g c C V- VO a T o.. sg A 0p 1^ !e ,- P d 6 N 7) W v O C O m O 'J Q) CT A W N O CO OD V O) CJ) A W N ../. o a n a4 c 0) 0 -, 0 3 ro 0000 0 3' 0 rND 0 x 0 n A rD r`D'o x N D`)) n o m s � _ 7) �. = < rbDIC .i• 3 _co cr I I.I. ,• O rp = t�D O rnD m X) 0 r tD n ado n O l7 d 0 < �` p a v 0) n)• a k N Q I— y �^ l�D d 7 rD ? r •p iv Cu FP Vf O O Cr) 0- O .- v N n O < O el fl. 7 w rt) rD n _p ,-r * m (aD n N CCD in ? n. A (D r • CD C n F+ < Q. CD "S 7 e) ,••r V) rD V) 0' 7 n (D -a O 01 u, m I 0 0 p 0 rD > rD O r O 7 p 7 0 .* 7 n < < '' n F' �' F� CI (15 aa c .-. S ri n of n• -' m rD ►.> 3 ? cb -• - ? 0 (D v T CD rD O :: ^' = O ,•► Cl) rD rD(13 S n' r) 0-. r r C (D m G7 Cr 7 7ti) X a) a) v. lD rND O- C �_ p (D rt. ,+ v)• 7 < y. 7 Q C• _ 7); M < d rD 0 0 r = = a) < O < -1 tn 0 Z 0 G f D x * v) fDo (D •• Ln ,, I., u, W w C1 F+ c of,o 0 o 0cD D Wo0 I0 U0 IV 0 O'of+ D 0 0 o O o Po I 73 < > >1,1 RI T m m m r D. m < r . r C D > D "n D D T -'+ -+ in 7 1-, N W F )' '' 0 A Cl) N N N Q1 O77C CA O Qt O1 O cr. (n O O O C- n O o 0O 01 0 7 O (A 0 00 0 0 0 0 0 0 V 0 0 0 CD Cu 0 CD '. O O O b O O b O b O O O b 00106 O o 0 O O O O O O O O O 0 O O O O CU co CD EA EA 4i,EA W VI EA di dl d) ER N d1 Eft 69 d) N di O A CT U) N DO N V) N A O W D n C G) O O A O O V W at A O 3 O _, 0 CT O 0 0 0 O O 0 O fT O O la - O O K N o O O O O O O O 0 O O 0 O O O 0 C C y 0 O C ,7 0 O O 0 0 0 0 0 0 O 0 0 O O O O O .. O O --, (b CO CO 0 O O" 03 O 3 0I 0 CO - 0 * B. O fA -Ea EA 69 EA EA EA NJ L-A m C C7 CD Z O 0 CD O A 0 0 ? 0) O Cb p O pT o c -0 OO OO O O 5 V O pCD •O O O O o O0 O N O < O -'0 8 OO 00 0 7- 17-0 C 30 O CD Cr) 0 O 0 rn 0 0 0 0 o w o 0 0 0 o p' 0 Q 0 7r CD ui n CO RI - EA EA w -0 0 CD EA EA Efl Efl EA 69 EA EA W EA N EA EA EA 69 EA 7 �_ Cfl 0 0 0 i 0 0 0 0 0 0 0 0J, o O 0 0 O A • a O a O m -N 0 0 0 b b 0 b 0 0 Pb0 0 0 0 0 0 < m m N CO 0 0 m a (n N -7' O a) co CD o Ca 0 0 (P o 0 co w _, o o o a) 0 p - O O r. 155 fA Efl E5 fA fA EA EA 69 69N EA N y y ✓ N EA (0 EA (-) 7 � W Ni 0 0 o o -44 0 0 0 - o o (4i.) o o coo N j oo b A 00 cz, O O O O O N 0 O 0 0 0 Q N N O o co O O O O 0 O C K O O C.O CO L. ƒ Q. - E CD Co ( a 12. 1, $ .4 £ X X CD 2 /• \ \ \ / \ \ -0 co / rn = \ ƒ \ ® 3 CM _ V, VI ( m = a E m § CD 0 0 CD } $ — _ ; 0- ( ,J _ el g § lb = , , / > -n CO co -. = ) \ / _0 = 7 C M. 0 = 2 G c \ r. ° \Q ) kq "V _ @ /0 ; 7' b o g k 2 _ \ -s N) $ co « > ( \ CO \ • � p c ® \ § 0 0 0 ( \ 0 \ \ | SA ° f ƒ / w / \m C y / \ ± 3 CD) / \ oZ = g ƒ \ \ \ / \ / / a \ c ! ]. _ 2 CD CD c c c \ / _ * J = f O - m \ 2 o % E 2 / f / / } J 9 / / @ / / { A ƒ R5 « \ & , a , ƒ � c c 9 f -4 J . - g Cl) \ m C, % @ - 7 9 9 \ C a) / z ID , % / o / \ o Co EXHIBIT D (City of Port Arthur Certificate of Acceptance) City of Port Arthur, Texas Department of Utility Operations CERTIFICATE OF ACCEPTANCE FOR JADE AVENUE SANITARY SEWER REHABILITATION PROJECT FOR THE CITY OF PORT ARTHUR To: PM CONSTRUCTION& REHAB, LLC, of Pasadena, Texas This document is to certify that the City of Port Arthur, Texas accepts the completion of the Jade Avenue Sanitary Sewer Rehabilitation Project, on the basis of the City of Port Arthur, Texas Water Utilities Department, the Engineer's Certificate of Completion, the Contractor's Certificate and Release, and Contractor's Certificate of Guarantee from PM Construction& Rehab, LLC, Pasadena, Texas. Rebecca Underhill Interim City Manager ATTEST: Sherri Bellard City Secretary EXHIBIT E (Release of Retainage Invoice) PM Construction & Rehab, LLC 131 N. Richey Pasadena, TX 77506 832-252-4800 Estimate and Certification for Payment PROJECT: City of Port Arthur, TX-Jade Ave. Sanatiry Sewer Rehabilitation Project OWNER: City of Port Arthur, TX ACE. Project No. 117-26 Jade Ave.Sanitary Sewer ENGINEER:Action Civil Engineers, PLLC PM Project No. 807739 Address: 8460 Central Mall Drive, Suite J Port Arthur, Tx 77642 ATTN: Mark Kelly Current Approved Extensions+or- days Previous Approved Extensions+or- days ESTIMATE 3 Total Contract Time 150 days Time Period: 12/3/2018 to 5/2/2019 Spent Days 67 days Date of Estimate: 3/27/2019 Days Remaining 83 days Start Date: 12/3/2018 Current Contract Completion Date: 5/2/2019 A. Contract Amount to Date: 1. Contract Price: $368,150.00 2. Approved Change Orders: Total Changes to Date: +or- $0.00 Total Contract Amount: $368,150.00 B. Earnings to Date: 1. Previous Work Completed: 85.16% Previous Earnings: $313,505.20 2. Work Completed this Period: 0.00% Earnings This Period: $0.00 3. Materials on Site: $0.00 Total Earnings: $313,505.20 C. Reductions: 1. Retainage: 0.00% of $313,505.20 ($0.00) Total Payments Due: $313,505.20 Less Previous Payments: $282,154.68 Total Amount Due Contractor This Estimate: $31,350.52 The undersigned Contractor certifies that to the best of his knowledge,information,and belief that the Work has been completed in accordance with the Plans and Specifications and the current payment shown on this Application for Payment is now due. Prepared By: James Mas Date: 27-Mar-19 Contractor: PM Constr ctionj The foregoing estim. e.f erk comple e s tr e /d correct - ' '•z awl-'.e ndelief. s Approved by: �.t /id." , # t Date: Engineer * i WILLIAM V.LARRAIN Approved by: .... Date: City l' y. ! ONA` CO rn d O O R o 0 0 0 0 0 0 0 0 o v N ti 0 0 0 0 0 0 0 0 0 0 0 00 �_ 0 0 N CO O O O O O r` CO - CO d' 09 0 <71- CV CV C C w C 0 r T- N W CV 69 CA 69 EA EA 69 69 EA r OO H d o o o , w co 0 0 to 0 0 .. CO o CO CO Od Y 2 N En 'O CO 0 0 O N W 2 > O O O O O O O O O O O O O O O T- 4- y Q .6 O O O 0 O O O O 0 O O O O O O .2 O O O O O O o E C 69 ER 69 E9 69 N E9 CO 69 EA E9 69 EA - ER 69 69 a) D a CO m 69 CA C6 U w W 0 Yr O ~ 3 T o O O 0 0 — o ch o 0 0 co o cri o 0 •c O o a) r Cl_ , N __ '0 m 0 0 0 0 0 0 0 0 ~ r d 0 0 O O 0 0 O O O O 0 O 0 O O O 0 `m Za c ' O 0 co c co V' 69 69 d- ER OFfT- ER 69 U p W Ea CV C6 ER EA EA EH CA 67 3 a CD 0 N '. ,- 0 0'-- C OC O CO CO CO r O W I `'o co 0 00 0 0 0 0 0 0 0 0 0 co 0 0 U C C O O O O co O O O 0 O 0 0 0 CV R O O O co O O 00 O O O O O O O O O O O co co a O O O O co O O O O co O It) O `5 O M O W O N 0 ap N. 0 0 •� O O CC) U Q us to N 69 69 IA CO - 69 69 W I M us w I 69 {!# Q) 0) a O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o m CA o 0 0 o o r; a o c oi o u; o .V 00 to CO 0 0 0 0 o V1 to 0R tD t0 0 in d m N ...j 1.1 C J J J U. Q < LL Q < < LL Q < >' cc 1' cc W W J W W W J W W !n I I _ .6; T `i ID V:1 N O O 0 O O O O 0 N 00 0 0 0 G) .O Q. a) T X aJ - N co - I— S C i OD 0 C Z 3 o U 1— T O O C - S o O 47 tD C T -O +=• a+ ++ +-' '4, C �• I— I— > C L - 13 C 03 cts Rs .L N •co C ••X L _C C 0 •on V) N C L L V) w 9) L C a) N •i L a) 04.- a) IZ J J N .. O 3 a) ca O - +� O a) a1 a) LL f6 L O - L ,C Z E N m y al u a v u Y U u C O no CX CI a) a C to O 0 a Q a) a) a' O Q C S W Y h tp U N- a) U C 'O V) 111 N - N C..) O L a) W 0 R 5 L r-1 C a) a) Q co J d, •> a• a) , - u c t -a I- N L f6 CD 3 C 3 - .0 MS 0 0 0 3 V) 3 = ° L „ C 3 �, o C O 'O N Q. CO CO V Cr Y Z Z C(C a) C. a)) Q a) i c tea) O f6 C O I G •_ V L L a) k tp a •N CO s > 0 ce V 0 au) c a") :� X CU o Q O y S v O o W v.. •U .- R •++ 3 iL6 a) O C 0 > C C •++ C • V C C .4' D: tJ n) (13 r C Y C Y L I... y 0 C - +, E m a co C .'_^ C .-, c a C L) ' +� e j 0 2 u V) w v) CC C v) u c°U w 8 v) _`: c a° cc et a) c ,L 1- w m Q Q cc 'O N M •Q' tn co N. co Q) co x- N Cl U) CO N. m e�+ ,— 'T 't r r T .t r r O 7 a CO C) ein O• O �; j 0 co CN CV as j . o o ® 0 0 CN N O N co 0 c - 64M 4.0 Cn 2 b9 CO CtS Efl ♦+ - �r O co O F- Q • 0 0 0 ,:t co ca '-- o d N u a m CO CN y ID000oW O O E ' 64o6t c cn CD o a. :13 CO U a W 6s- Cl Y .0 O ~ MIMI= Q 0 0 co 0 Q) a) mO E c o I— 1" ., o > . o 0 0 O d • a 0 0 0 O `m v Z o ° c m 69- Gs 0 0cn c� 2 V o w e» O Co Ca . EH o > E L 0wJO • O O 15 O O O O O C O O Oin O CoO O C , N O O cocr, L O O Q 569. 4.9 r0 to M N rn a) ca O O 0 0 dO O O M C •V C co 01 • CL .� O v v m 1— ?' o oO o ..: a .-, .1 ,� O 0 O Z a, ON S w = 4l 0 a V Y m-Q m U- Q aa 'Clz c ate. 4., a N L 3 V U O co o 0 4) 67 U L) r CD Q Q N C O dq Q i o VI m CNa C 'Er) c U W W ca Q v v o a CU VI C '- CD C R ma) L (n 0 U W W O: m -C CT CD Q 13 E a, CO o) co r LE r r N N Q.