Loading...
HomeMy WebLinkAboutPR 20825: TEMINATION OF PROFESSIONAL SERVICES AGREEMENT WITH ACTION CIVIL ENGINEERS PLLC :.„, ,„•• , /_J City of urt rthist Texas www.PortArthurTx.gov INTEROFFICE MEMORAN D U M Date: May 1, 2019 To: The Honorable Mayor and City Council Through: Rebecca Underhill, Interim City Manager From: Alberto Elefano, P.E., Interim Director of Public Works RE: P.R. 20825 —Termination of Professional Services Agreement with Action Civil Engineers (ACE), PLLC for the Roadway Design of Sunken Court— Phase I from Twin City Highway to Tyrrell Parkway and Sunken Court—Phase 2 from Tyrrell Parkway to North Park Drive Introduction: Presented for City Council's consideration and approval is P.R. 20825 authorizing the City Manager to terminate a Professional Services Agreement with Action Civil Engineers, PLLC for the Roadway Design of Sunken Court — Phase I from Twin City Highway to Tyrrell Parkway and Sunken Court—Phase 2 from Tyrrell Parkway to North Park Drive. Background: Action Civil Engineers (ACE), PLLC was selected for the Roadway Design of Sunken Court— Phase I from Twin City Highway to Tyrrell Parkway and Sunken Court - Phase 2 from Tyrrell Parkway to North Park Drive for a total contract pricing of$216,800.00. Resolutions No. 18- 187 and 18-188 were approved on May 25, 2018 and the Notice to Proceed was given on the June 6, 2018. Per contract, an Engineering Report was completed and presented to Council on August 7, 2018 as part of the Preliminary Phase. On August 16, 2018, ACE was notified to proceed with the recommended option. Per contract, February 26th was the agreed upon date of submission for 100% plans. ACE did not meet the deadline for 100% plans. ACE instead submitted 60% plans on February 26 and after comments from the City, resubmitted (85%) plans on April 29, 2019 which is 62 days beyond the contract date of February 26, 2019 for 100% plans. The resubmitted plans (85%) are missing several elements including the final bid "Remember,we are here to serve the Citizens of Port Arthur" 444 4'h Street X Port Arthur,Texas 77641-1089 X 409.983.8182 X FAX 409.983.8294 specifications. It is Public Works' recommendation to terminate the contract with ACE as ACE has failed to fulfill its obligations in a timely manner and did not provide the information the City required. Another Engineering Firm will have to complete the design on this project which will further delay the City's progress on this project. See attachment. Recommendation: City Council to approve P.R. 20825 authorizing the City Manager to terminate a Professional Services Agreement with Action Civil Engineers, PLLC for the Roadway Design of Sunken Court — Phase I from Twin City Highway to Tyrrell Parkway and Sunken Court — Phase 2 from Tyrrell Parkway to North Park Drive. "Remember,we are here to serve the Citizens of Port Arthur" P.O.Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8101 X FAX 409.982.6743 P.R. 20825 05/02/19 ace/anw RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO TERMINATE A PROFESSIONAL SERVICES AGREEMENT BETWEEN THE CITY OF PORT ARTHUR AND ACTION CIVIL ENGINEERS, PLLC OF PORT ARTHUR, TEXAS FOR THE ROADWAY DESIGN OF SUNKEN COURT — PHASE I FROM TWIN CITY HIGHWAY TO TYRRELL PARKWAY AND SUNKEN COURT — PHASE II FROM TYRRELL PARKWAY TO NORTH PARK DRIVE. WHEREAS, per Resolutions No. 18-187 and 18-188, the City selected Action Civil Engineers, PLLC (hereinafter called the "ENGINEER") for the Roadway Design of Sunken Court — Phase I from Twin City Highway to Tyrrell Parkway and Sunken Court — Phase II from Tyrrell Parkway to North Park Drive for $216,800.00; and, WHEREAS, on August 16, 2018, the Engineer was notified to proceed with the recommended option for design and had 150 calendar days to submit 60% plans on January 13, 2019, which the Engineer did not fulfill; and, WHEREAS, the Engineer submitted inadequate plans (60%) on February 26, 2019 when 100% plans were due for submission; and, WHEREAS, the inadequate plans (60%) did not have several required elements of a 100% plan and the City returned the plans with comments to correct on March 6, 2019; and, WHEREAS, the Engineer resubmitted more inadequate plans (85%) on April 29, 2019, which date is 62 calendar days over contracted date; and, WHEREAS, these plans are not sufficient to bid the project as scheduled; and, P. R. 20230 WHEREAS, the Engineer has failed to fulfill its obligations in a timely manner and did not provide the required information for details see attached Exhibit "A". NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT, the facts and opinions in the preamble are true and correct; and, THAT, the City Council hereby authorizes the termination of the contracts with Action Civil Engineers PLLC, for the roadway design of Sunken Court Phase I from Twin City Highway to Tyrrell Parkway and Sunken Court Phase II from Tyrrell Parkway to North Park Drive. THAT, a copy of the caption of this Resolution be spread upon the Minutes of the City Council. READ, ADOPTED AND APPROVED this the day of , A.D. 2019 at a meeting of the City of Port Arthur, Texas by the following vote: Ayes: Mayor: Councilmembers: Noes: P.R. 20230 Derrick Ford Freeman Mayor Attest: Sherri Bellard City Secretary APPROVED AS TO FORM: InfroAaleci ize City A orney APPROVED FOR ADMINISTRATION: Rebecca Underhill Interim City Manager APPROVED AS FOR AVAILABILITY OF FUNDS: Kandy Daniel Interim Director of Finance Alberto Elefano., P.E. Interim Director of Public Works Clifton Williams, CPPB Purchasing Manager P. R. 20230 EXHIBIT A Calendar 1 Phase Days Start Date End Date Preliminary Phase (30% Engineering Report) 60 Days 6-Jun-18 5-Aug-18 Design Plans Submittal (60%) 150 Days 16-Aug-18 13-Jan-19 ACE did not Submit 60% Plans Pre-Final Plans Submittal (90%) 30 Days 13-Jan-19 12-Feb-19 ACE did not Submit 90%plans Ace Submitted 60%Plans as 100% Final Plans Bid Package Submittal (100%) 14 Days 12-Feb-19 26-Feb-19 on Feb 26 The Submitted plans(60%)was submitted on Feb.26th then returned to ACE with comments to be addressed and corrected on Mar. 6, 2019. Inadequate Plans(85%)was not delivered until April 29,2019 (62 Calendar days over the contracted days) *Note: The Inadequate Plans(85%)did not have the following required information: - Summary of Pay Items - Back of Sidewalk Profile - Interchange Detail - Intersection Layout - Drainage Structures - Roadway Soil survey - Stormwater Pollution Prevention Plan(SWPPP) - Temporary Traffic Control Plans - Utility Adjustments - Engineer's Opinion of Probable Construction Cost - Specifications