HomeMy WebLinkAbout(2) THE JUNE 2019 FINANCIAL REPORT INTEROFFICE MEMORANDUM
Date: July 26, 2019
To: The Honorable Mayor and City Council
Through: Rebecca Underhill, Interim City Manager
From: Kandy Daniel, Interim Finance Director
RE: Proposed Budget Calendar FY 2019 - 2020
Attached is the proposed budget calendar for FY 2019—2020. We have tentatively scheduled
three workshops for August 13, August 20, and August 27 to discuss the proposed budget.
Public hearings are scheduled for August 27 and September 10 with an adoption date of
September 10 as well. Please let us know of any specific topics you would like discussed at
the workshops or if any changes or additions to this schedule are needed.
Proposed Budget Calendar FY 2019—2020
August 9 -File Proposed Budget with City Secretary
August 13 -Set required public hearing date(s)on tax rate and budget.
-Hold first budget workshop.
Aug 16 -Publish required notices on tax rate and budget(prior to hearings).
Aug 20 -Hold second budget workshop. (Not a regularly scheduled Council Day)
Aug 27 -Hold 1"public hearing on tax rate.
-Hold public hearing on budget. 1 public hearing is required on budget.
-Hold third budget workshop.
September 10 -Hold 2nd public hearing on tax rate(if needed).
-Adopt Budget, tax rate and tax roll (no later than September 27).
1
Energy` ''"'4.
City of - City
' ' 14)
ii.}
ort rth u r
Te.x as
2018-2019 Budget
Monthly Report
And
Quarterly Investment Report
June 2019
City of Port Arthur 2018 -2019 Budget
Monthly Report
June 30, 2019
Highlights:
General Fund
Overall the General Fund revenues continue to be approximately$1.2 million above the expected
amount. 97.1%of the property tax budget has been received and collections are expected to be slightly
above budget by year end. Industrial payments received this fiscal year are $700,000 above the budgeted
amount due to expansions at BASF and BASF TOTAL Petrochemicals(BTP). Sales tax collections
continue to trend below last year as expected. Sales tax through June is 8%below last fiscal year but
continues to show improvement and currently only 1.5%below budget. Utility franchise fees,which are
made up of electric,gas,telephone and cable categories are$200,000 above budget and miscellaneous
revenue including interest earnings, land sales and insurance proceeds have exceeded budgeted levels by
$400,000.
Operating expenditures total $43.8 million at June 30,2019. Year to date actual is below the budgeted
level by$4.2 million,an improvement of$700,000 over May. Departments are continuing to work on
hiring needed personnel. There are currently 42 vacancies in the General Fund which is down from 50 in
the previous month. Budget amendments are requested throughout the year as needed so that the
amended budget column will closely reflect where we expect to be at the end of the year.
Water Fund
The Water Fund revenues reflect a$400,000 improvement over last month with a current budget shortfall
of$447,000. Revenues are trending up this summer and are expected to reach budgeted levels of$27.9
million by year end. Water service charges received from industry are currently$1.1 million over budget
estimates. Residential and commercial revenue is $2.2 million under budget which is a slight
improvement over last month.
Water Fund operating expenses are above budget by$730,000 at June,2019,which is an improvement of
$80,000 over May. There are currently 15 vacant positions which is down from 17 vacancies last month.
As staff is hired,the need for overtime and temporary help can be reduced.
The Water Fund budget is balanced with a net budgeted revenue over expenses of$900,000. Year to date
actual currently reflects a net expense over revenue of$173,000,which reflects a$600,000 improvement
over May. Staff will continue to monitor the fund and work with the Water Department on cost cutting
measures to bring expenses back in line with available revenues.
Solid Waste Fund
Solid Waste revenues are improving but are still below budget by$160,000. This is mostly attributable to
Landfill dumping fees which are$177,000 below the estimated amount. In FY18 we saw a significant
increase in Landfill fees due to Hurricane Harvey. The revenue estimate was reduced this year to FY 16
levels with an increase of$750,000 for a new major customer. However,current revenues for the
customer are still below the projection. Commercial container fees continue to be 6%above the budgeted
amount.
Solid Waste Operating expenses currently are over budget by approximately$72,000 which is a$48,000
improvement over last month. Staff will keep the Council updated on the efforts to keep costs in line
with available revenues.
Pleasure Island Fund
Pleasure Island revenues are down $43,000 at this time and can be attributed to reduced rentals at the RV
Park. The original expense budget was amended by a total of$358,000 to cover the bulkhead repairs at
the Marina which began last year.
Capital Improvement Fund
This section includes street projects by district, other general improvements by type and available funding
sources for each. The total street program budget is $19.9 million, which reflects the $2.2 million budget
amendment Council approved earlier in the month. Funding for the street program is provided through
EDC Street Maintenance, CDBG,GLO and prior year General Fund revenues. $7.2 million has been
spent to date on the current listed street projects. $2.7 million of that has been spent this fiscal year
leaving a balance of$12.7 million to complete the projects. General Improvement projects include
building renovations,technology upgrades and parks&recreation renovations. Expenditures on current
projects total $2 million with $571,000 spent this fiscal year and a balance remaining of$2.9 million.
Disaster Fund
At this time the Hurricane Harvey Disaster Fund has total revenues of$23 million and expenditures of
$29.9 million leaving a deficit of$6.9 million. Pending reimbursements of$1.8 million will reduce this
deficit to $5.lmillion. The City continues to make every effort to capture as much Federal assistance as
possible. Property insurance claims remain outstanding.
Quarterly Investment Report
At June 30,cash and investments for the City totaled $76.9 million. This reduction of$9 million from the
beginning of the quarter is reflective of the City's normal cash flow. The majority of taxes and industrial
payments are received in the first and second quarters of the fiscal year. Bank Deposits of$4.2 million
make up approximately 5.5%of the portfolio while the remainder of$72.7 million (94.5%)is invested in
authorized local government investment pools. The average yield for the quarter is 2.3%which is
approximately the same as the previous quarter. Interest earned this quarter is$449,000 and totals$1.4
million fiscal year to date. All investments have been made in accordance with the City's investment
strategy and investment policy as previously approved by the City Council.
City of Port Arthur 2018 - 2019 Budget
Monthly Report
June 30, 2019
Actual Actual Amended Y-T-D Y-T-D
16-17 17-18 Budget Actual Budget
18-19 Thru June Thru June Variance
General Fund Summary
Revenues
Taxes
Property Taxes 12,518,521 12,316,713 12,540,000 12,186,318 12,238,140 (51,822)
Industrial District Payments 31,221,614 30,644,284 30,100,000 30,759,585 30,075,000 684,585
Sales Tax 8,704,353 10,452,255 9,700,000 7,267,754 7,383,060 (115,306)
Other Taxes 9,703,891 9,190,955 9,270,000 3,925,686 3,735,824 189,862
Total Taxes 62,148,379 62,604,207 61,610,000 54,139,343 53,432,024 707,319
Licenses and Permits 751,937 841,860 441,200 374,711 330,858 43,853
Intergovernmental Revenue 77,112 58,228 141,772 80,696 106,317 (25,621)
Charges for Services 325,778 355,557 381,000 275,915 285,696 (9,781)
Fines and Forfeitures 824,979 850,301 935,100 775,541 701,316 74,225
Interest and Miscellaneous 1,156,481 1,283,617 527,100 763,061 395,298 367,763
Total Operating Revenues 65,284,666 65,993,770 64,036,172 56,409,267 55,251,509 1,157,758
Transfers and Other Revenues 7,881,414 7,091,869 7,091,718 5,318,789 5,318,775 14
Total Revenues 73,166,080... 73,085,639 71,127,890 61,728,056 60,570,284 _ 1,157,772
Expenditures
Administration 2,138,493 1,447,224 1,905,094 1,067,378 1,400,789 (333,411)
City Secretary 1,348,263 1,313,215 2,097,232 1,274,053 1,517,900 (243,847)
City Attorney 738,309 984,382 1,127,621 813,041 811,242 1,799
Finance 2,099,769 2,186,880 2,288,445 1,583,431 1,651,210 (67,779)
Information Technology 578,506 870,033 1,747,846 1,050,310 1,278,068 (227,758)
Human Resources 662,471 644,759 813,215 416,874 585,503 (168,629)
Development Services 4,398,784 4,852,202 5,876,346 3,894,061 4,256,990 (362,929)
Civic Center 788,843 653,306 872,571 591,433 635,044 (43,611)
Police 19,600,635 18,314,943 20,509,145 14,008,896 14,689,771 (680,875)
Fire 13,426,836 13,538,450 14,160,174 10,263,395 10,325,785 (62,390)
Public Works 7,147,945 7,222,861 8,949,925 5,444,494 6,508,507 (1,064,013)
Health and Welfare 1,304,852 1,399,065 1,500,621 1,047,099 1,083,451 (36,352)
Parks and Recreation 2,497,164 2,253,854 3,318,723 1,538,423 2,423,555 (885,132)
Library 1,126,363 951,435 1,274,655 855,288 920,123 (64,835)
Total Operating Expenditures 57,857,233 56,632,609 66,441,613 43,848,176 48,087,937 (4,239,761)
Transfers and Other Expenditures $11,105,335 $11,510,853 $4,954,862 3,985,946 3,985,946 -
Total Expenditures 68,962,568 68,143,462 71,396,475 47,834,122 52,073,883 (4,239,761)
Net Current Activity 4,203,512 4,942,177 (268,585) 13,893,934 8,496,401
Unassigned Beginning Fund Balance 15,488,267 19,691,779 24,633,956 24,633,956 24,633,956
Unassigned Ending Fund Balance 19.691,779 24,633,956 _ 24.365,371 38,527,890 33,130,357
City of Port Arthur 2018 - 2019 Budget
Monthly Report
June 30, 2019
Actual Actual Amended Y-T-D Y-T-D
16-17 17-18 Budget Actual Budget
18-19 Thru June Thru June Variance
Water Fund Summary
Revenues
Water Service 8,580,711 11,237,669 13,400,000 8,947,918 10,049,994 (1,102,076)
Water Service-Industry 2,138,890 3,992,756 3,734,206 3,814,912 2,800,647 1,014,265
Sewer Service 6,290,565 7,191,114 9,700,000 6,155,593 7,274,997 (1,119,404)
Other Charges for Services 441,661 202,596 196,813 444,434 147,591 296,843
Late Fees 414,171 494,418 407,525 704,341 305,640 398,701
Interest and Miscellaneous 583,422 130,709 18,436 78,622 13,824 64,798
Total Operating Revenues 18,449,420 23,249,262 27,456,980 20,145,820 20,592,693 (446,873)
Transfers and Other Sources 410,000 410,000 410,000 307,500 307,494 6
Total Revenues 18,859,420 23,659,262 27,866,980 20,453,320 20,900,187 (446,867)
Expenses
1251 Administration 1,935,521 839,181 1,077,727 1,015,861 774,605 241,256
1252 Water Purification 4,319,571 5,596,723 5,994,189 3,946,130 4,444,396 (498,266)
1253 Water Distribution 4,589,162 3,476,479 3,562,452 2,657,042 2,581,545 75,497
1254 Customer Service 1,050,636 1,194,613 1,260,503 1,219,419 907,816 311,603
1255 Waste Water Conveyance 4,447,481 4,002,064 4,259,332 3,649,013 3,101,202 547,811
1256 Wastewater Treatment 1,848,970 1,987,509 2,349,053 1,859,213 1,723,941 135,272
1260 Environmental Regulatory Services 1,003 441,856 619,482 368,906 449,907 (81,001)
Total Operating Expenses 18,192,344 17,538,425 19,122,738 14,715,584 13,983,412 732,172
Transfers and Other Uses 5,826,579 6,954,202 7,881,201 5,910,901 5,910,901 0
Total Expenses and Other Uses 24,018,923 24,492,627 27,003,939 20,626,485 19,894,313 732,172
Net Current Activity (5,159,503) (833,365) 863,041 (173,165) 1,005,874
Beginning Working Capital Balance (879,632) (1,202,686) 705,689 705,689 705,689
Adjustment to W/C 4,836,449 2,741,740 - - -
Ending Working Capital Balance (1,202,686) 705,689 - 1,568,730 532,524 1,711,563
(As Adjusted)
City of Port Arthur 2018 -2019 Budget
Monthly Report
June 30, 2019
Actual Actual Amended Y-T-D Y-T-D
16-17 17-18 Budget Actual Budget
18-19 Thru June Thru June Variance
Solid Waste Fund Summary
Revenues
Residential Service 4,227,946 4,158,037 4,250,000 3,081,382 3,187,494 (106,112)
Commercial Containers 1,907,211 2,015,983 2,000,000 1,593,551 1,499,994 93,557
Landfill Charges 1,403,735 2,335,938 1,650,000 1,060,742 1,237,500 (176,758)
Municipal Landfill Contracts 282,522 310,758 285,000 182,441 213,750 (31,309)
Late Fees 148,629 173,293 155,000 131,151 116,244 14,907
Interest and Miscellaneous 138,232 696 - 43,544 - 43,544
Total Revenues 8,108.275 8,994,705 8,340,000 6,092,811 6,254,982 (162.171)
Expenses
1271 Trash Collection 1,318,143 1,307,401 1,259,618 976,185 904,542 71,643
1272 Residential Collection 1,476,416 936,306 1,182,920 921,888 846,693 75,195
1273 Container Service 889,661 678,516 705,923 610,357 510,308 100,049
1274 Landfill 2,524,882 2,126,943 2,593,673 1,745,271 1,918,316 (173,045)
1275 Administration 176,084 98,186 134,062 94,438 _ 96,002 (1,564)
Total Operating Expenses 6,385,186 5,147,352 5,876,196 4,348,139 4,275,861 72,278
Transfers and Other Uses 1,155,957 3,039,070 2,857,534 2,143,151 2,143,151 1
Total Expenses and Other Uses 7,541,143 8,186,422 8,733,730 6,491,290 6,419,012 72,278
Net Current Activity 567,132 808,283 (393,730) (398,479) (164,030)
Beginning Working Capital Balance 1,210,795 1,777,927 2,586,210 2,586,210 2,586,210
Ending Working Capital Balance 1,777,927 2,586,210 2,192,480 2,187,731 2,422,180
Pleasure Island Summary
Revenues
Land Lease&Sales 492,379 594,134 547,000 412,117 410,247 1,870
Dry Storage Rentals 23,840 29,026 33,000 18,161 24,750 (6,589)
RV Park 290,493 285,407 294,000 184,453 220,500 (36,047)
Boat Slip Rentals 155,356 130,301 130,000 95,963 97,497 (1,534)
Fuel Facility 9,891 4,343 4,000 2,639 2,997 (358)
Total Revenues ® 971,959 1,043,211 1,008,000 713,333 755,991 (42,658)
Expenses
1291 Administration 555,036 582,864 587,315 355,463 423,066 (67,603)
1292 RV Park 141,778 148,883 184,650 90,792 138,488 (47,696)
1293 Marina 73,740 144,007 411,100 357,275 308,325 48,950
1294 Parks 53,645 67,307 _ 69,200 22,052 51,900 (29,848)
Total Operating Expenses 824,199 943,061 1,252,265 825,582 921,779 (96,197)
Transfers and Other Uses 20,000 (65,444) 40,000 30,000 30,000 -
Total Expenses and Other Uses 844,199 877,617 1,292.265 855,582 951,779 (96,197)
Net Current Activity 127,760 165,594 (284,265) (142,249) (195,788)
Beginning Working Capital Balance 269,851 397,611 563,205 563,205 563,205
Ending Working Capital Balance 397,611 563,205 278,940 420,956 367,417
City of Port Arthur 2018 -2019 Budget
Monthly Report
June 30,2019
Total FY 18-19 Project To
Total Revised Actual Y-T-D Date Project
Capital Improvement Fund Summary Estimated Thru 9/30/18 Actual Actual Balance
Street Improvements Project Cost Thru June Thru June _ Remaining
District 1
15th Street Stillwell-Vicksburg - - - -
El Paso Avenue Lakeshore-Procter - - - -
Nashville Street 7th-Proctor 913,290 34,781 2,600 37,381 875,909
Bluebonnet Gulfway-19th 1,328,280 1,227,575 117,927 1,345,502 (17,222)
Woodworth Blvd 7th St-Thomas Blvd. 1,186,728 1,057,665 129,333 1,186,998 (270)
W 7th/Ransom Howard MLK-Abe Lincoln Ave 1,468,959 1,296,648 172,311 1,468,959 -
W.8th Street Foley-Joe Louis 1,254,267 294,165 805,393 1,099,558 154,709
Lakeshore Drive Ph 1 4186-4300 Lakeshore 555,842 199,833 360,927 560,760 (4,918)
Lakeshore Drive Ph 2 12th Av-4186/4300-Stadium 723,536 - 7,800 7,800 715,736
5th Street Atlanta-Nashville 915,588 - - 915,588
6th Street Atlanta-Nashville 929,588 - - 929,588
48"Storm Sewer Reloc Gulfway-9th 125,911 125,911 - 125,911 -
12th Street 6th Ave-Woodworth 75,926 - - - 75,926
24th Street Gulf Ave to Memorial 105,071 - - - 105,071
9th Street Houston-Ft Worth 31,768 - 24,753 24,753 7,015
Marshall 10th-Gulfway 159,616 - 102,369 102,369 57,247
El Paso Ave Lakeshore-Howard 29,598 - - - 29,598
3rd Avenue Gulfway-14th 350,000 - - - 350,000
5th Ave.South Tremont-Broadway 200,000 - - - 200,000
10,353,968 4,236,578 1,723,413 5,959,991 4,393,977
District 2
Williams Avenue Lakeshore-Procter 15,231 - - 15,231
15th Street Vera-Main 289,351 17,555 129,381 146,936 142,415
Carolina Ave Gulfway-Dead End 919,281 28,550 40,360 68,910 850,371
Lakeshore Dr Lakeside-Williams 587,000 - - 587,000
Lakeshore Dr Williams-Stadium 927,000 - - 927,000
Williams Avenue Proctor-8th St - - - -
8th Street Williams-Duff 21,313 - 17,660 17,660 3,653
5th Street Stadium-Duff 40,519 - 1,138 1,138 39,381
6th Street Brazos-Duff Dr 51,612 - 64,546 64,546 (12,934)
Williams Avenue 5th St-Lewis Dr 550,000 - - 550,000
3,401,307 46.105 253,085 299,190 3,102,117
District 3
Femdale Drive Highland Dr-S Park Dr 20,188 1,350 1,350 18,838
Northpark Drive W Park-Evergreen 21,420 1,350 1,350 20,070
Wilson Drive Evergreen-Highland 15,392 - - 15,392
Forest Drive Evergreen-Woodrow 344,500 - 32,210 32,210 312,290
8th Ave 32nd-Dead End 881,394 28,550 55,030 83,580 797,814
Sunken Court Ph 1/Wilson-Tyrrell 405,393 24,965 26,085 51,050 354,343
Sunken Court Ph 2/Tyrrell-Twin City Hwy 729,887 27,281 47,551 74,832 655,055
38th Street Rachel-Lansing 10,175 - 8,716 8,716 1,459
Forest Dr Griffing-Evergreen 51,753 - - 51,753
42nd St 9th Ave-Wentworth 161,028 - 50,685 50,685 110,343
Evergreen Dr. North Park-Tyrrell 62,543 - 58,421 58,421 4,122
3rd Ave 32nd St-36th St - - 67,512 67,512 (67,512)
Memorial Bld(Feeder) 29th St-31st St 100,000 - - - 100,000
9th Ave 32nd St-36th St 450,000 - - - 450,000
3,253,673 83,496 346,210 429,706 2,823,967
City of Port Arthur 2018 - 2019 Budget
Monthly Report
June 30, 2019
"Dotal FY 18-19 Project 7'o
Total Revised Actual Y-T-D Date Project
Capital Improvement Fund Summary Estimated Thru 9/30/18 Actual Actual Balance
Street Improvements Project Cost Thru June Thru June Remaining
District 4
Viterbo Road Spur 93-End 101,363 - 101,363
Diamond Avenue 63rd St-Dead End - - - -
Willow Avenue Maple-60th St 852,109 26,210 28,332 54,542 797,567
60th Street West Port Arthur-Canal 903,247 32,536 44,324 76,860 826,387
Cedar St 58th St to North End 88,142 - 53,650 53,650 34,492
64th St Garnet-W Port Arthur Rd 201,102 - 140,920 140,920 60,182
58th St Ray Ave to Cedar St 101,013 - 74,235 74,235 26,778
Pine Ave. 60th St.-Dead End 27,681 - 28,604 28,604 (923)
Sharon Dr Cambridge-Queens 29,199 - 36,456 36,456 (7,257)
Waco Ave Gulfway to Thomas Blvd 50,757 - 15,718 15,718 35,039
Lakeside Plaza H.O.Mills-Cashmere 320,000 - - - 320,000
Beaumont Ave Gulfway-15th St 230,000 - - - 230,000
2,904,613 58.746 422.239 480.985 2,423,628
Total Street Improvement Projects 19,913,561 4,424,925 2,744,947 7,169,872 12,743,689
Funding Sources:
EDC Street Maintenance 3,014,123 199,833 368,727 568,560 2,445,563
Community Development Block Grant(CDBG) 603,740 - - 603,740
General Land Office(GLO) 2,374,738 2,088,353 286,385 2,374,738 -
General Fund and Miscellaneous 13,920,960 2,136,739 2,089,835 4,226,574 9,694,386
Total Funding Sources 19,913,561 4,424,925 2.744,947 7,169,872 12,743,689
City of Port Arthur 2018 - 2019 Budget
Monthly Report
June 30, 2019
Total FY 18-19 Project To
Total Revised Actual Y-T-D Date Project
Captial Improvement Fund Summary Estimated Thru 9/30/18 Actual Actual Balance
General Improvements Project Cost Thru June Thru June Remaining
Building Renovation
Develop Svcs Building One Stop Shop 2,650,000 101,042 560,564 661,606 1,988,394
2,650.000 101.042 560.564 661.606 1988,394
Technology Upgrades
Telephone&Infastructure 1,238,000 1,266,128 8,878 1,275,006 (37,006)
Police Data Center 133,000 119,006 1,653 120,659 12,341
Network Monitoring Tools 29,000 20,909 90 20,999 8,001
Cloud-based backups 108,000 - - 108,000
Stage 1 ERP Replacement 80,000 - - 80,000
Phase 1 Paper Digitization 150,000 - - 150,000
1,738,000 1.406.043 10.621 1,416,664 321,336
Parks&Recreation Renovations
Recreation Center 230,000 - - 230,000
Mosely Pool 70,000 - - 70,000
Lakeview Pool 250,000 - - 250,000
550,000 - - - 550,000
Total General Improcemcnt Projects 4,938,000 1,507,085 571,185 2,078,270 2,859,730
Funding Sources:
Lease Proceeds(Technology) 1,223,742 1,223,742 - 1,223,742 -
General Fund and Miscellaneous 3,714,258 283,343 571,185 854,528 2,859,730
Total Funding Sources 4,938,000 1,507,085 571,185 2,078,270 2,859,730
City of Port Arthur 2018-2019 Budget
Monthly Report
June 30,2019
Actual Actual Y-T-D Actual
16-17 17-18 Actual FY17-FY19
Thru June Total
Disaster Fund Summary
Revenues
Federal/State Grants 6,092,224 6,407,776 70,291 12,570,291
Contributions-Donations 10,682 27,424 - 38,106
Insurance Proceeds - 10,015,834 325,313 10,341,147
Lease Proceeds - 2,645 - 2,645
Total Revenues 6,102,906 16,453,679 395,604 22,952,189
Expenditures
Salaries and Benefits 3,694,644 790,262 - 4,484,906
Supplies and Materials 63,291 1,636,543 212,270 1,912,104
Maintenance 121,462 2,171,350 1,186,313 3,479,125
Contractual Services 1,082,631 14,882,112 1,123,827 17,088,570
Capital Outlay 1,140,878 1,224,982 598,843 2,964,703
Total Expenditures 6,102,906 20,705,249 3,121,253 29,929,408
Net Current Activity - (4,251,570) (2,725,649) (6,977,219)
Beginning Fund Balance - - (4,251,570)
Ending Fund Balance - (4,251,570) 6,977,219
Summary by Category
Emeroencv
Debris Response Equipment Vehicles Facilities Contents Other DAC At Risk Total
Revenues
FEMA/State $ 12,500,000 $ - $ - $ - $ 65,476 $ - $ 4,815 $ - $ - $ 12,570,291
Insurance - - 1,236,997 3,314,837 1,961,008 3,808,305 20,000 - - 10,341,147
Lease Proceeds - - - - - - 2,645 - - 2,645
Donations - - - - - - 38,106 - - 38,106
Total 12,500,000 - 1,236,997 3,314,837 2,026,484 3,808,305 65,566 - - 22,952,189
Exoendilures
Personnel - 2,911,379 - - - - - - 1,573,527 4,484,906
Supplies&Materials - - - - 1,912,104 - - - 1,912,104
Maintenance - - 375,344 840,162 1,416,650 506,837 340,131 - - 3,479,124
Contractual Servic 12,875,438 - - - - - 2,593,838 1,619,294 - 17,088,570
Capital Outlay - - 318,539 1,474,944 866,404 304,817 - - - 2,964,704
Total 12,875,438 2,911,379 693,883 2,315,106 2,283,054 2,723,758 2,933,969 1,619,294 1,573,527 29,929,408
Balance $ (375,438) $(2,911,379) S 543,114 $ 999,731 $ (256,570) S 1,084,547 S (2,868,403) S (1,619,294) S (1,573,527) $ (6,977,219)
Reimbursements Pending
FEMA
PW 4129 Fire 274,025 204,732 3,274 482,031
PW 3640 Police 815,300 260,320 6,103 1,081,723
PW 1701 Debris 243,616 243,616
PW 40759 Electrical Bldg - - - 6,929 - - - - 6,929
Total 243,616 1,089,325 204,732 260,320 6,929 - 9,377 - - 1,814,299
City of Port Arthur, Texas
Investment Report
Portfolio Management Summary
For the Quarter Ended June 30, 2019
SUMMARY: Accrued Interest Average
%of Face Market Book Interest Earned Days to
Portfolio Yield Amount Value Value At Qtr End During Qtr Maturity
Portfolio At Beginning of Period(03/3112018) 85,957,900.76 85,964.330.03 85,957,900.76
Bank Deposits 5.47% 0.0000% 4,208,976.49 4,208,976.49 4,208,976.49 0.00 0.00 1
Local Govt Investment Pools 94 53% 2.4030% 72,709,170.48 72,709,170.48 72,709,170 48 0.00 448,566.90 35
Agency Securities 0.00% 0.0000% 0.00 0.00 0.00 0.00 0.00 0
Total/Average at End of Period(06/30/2019) 100.00% 2.2715°/Q 76.918.146,97 76,918.146.97 76.918.146.97 Q,QQ 448.566.90 23
DETAIL: Accrued Interest Average
Buy Maturity Face Market Book Interest Earned Days to
Cusip Date Description Date Yield Amount Value Value At Qtr End During Qtr Maturity
BANK DEPOSITS
06/30/2019 Capital One Bank 07/01/2019 0.0000% 4,208,976.49 4,208,976.49 4,208,976.49 0.00 0.00 1
Total Bank Deposits 0.0000% 4,208.976.49 4,208,976.49 4,208,976.49 0.00 0.00 1
LOCAL GOVERNMENT INVESTMENT POOLS
06/30/2019 Texpool 07/01/2019 2.3844% 22,468,765.38 22,468,765.38 22,468,765.38 0.00 141,783.25 34
06/30/2019 Tex Star 07/01/2019 2.4027% 25,098,707.35 25,098,707.35 25,098,707.35 0.00 153,352.19 23
06/30/2019 Texas Class 07/01/2019 2.4200% 25,141,697.75 25,141,697.75 25,141,697.75 0.00 153,431.46 47
Total Local Government Investment Pool 2.4030% 72,709,170.48 72,709,170.48 72,709,170.48 0.00 448,566.90 35
AGENCY SECURITIES
0.0000% 0.00 0.00 0.00 0 00 0.00 0
Total Agency Securities 0.0000% 0.00 0.00 0.00 0.00 0.00 0
Total Portfolio(06/30/2019) 2.2715% 76,918,146.97 76,918,146.97 76,918,146.97 0.00 448 566.90 33
This report has been prepared in accordance with the law of the State of Texas and more specifically with the Public Funds
Investment Act (Section 2256, Government Code as amended) and in accordance with the City's investment strategy and
investment policy as approved by the Port Arthur City Council.
Prepared By:
.,
C.���' 1 J C� , i `i
Kandy Daniel,Ihterim Finance Director
Reviewed By:
Alex/ /444 i
old Hankins,Assistant Finance Director
- . , a. 2L0LLL,
Rebecca Underhill, Interim City Manager