HomeMy WebLinkAboutPR 21006: APPROVING A SETTLEMENT IN THE AMOUNT OF $35,836.61 AGAINST TML FOR FLOOD RELATED DAMAGES TO THE ARMORY BUILDING (3451 57TH STREET) i .,
4
s,..,sy ,
City of City
„rr rt !, u r
Texas
INTEROFFICE MEMORANDUM
Office of Safety & Risk Management
Date: August 15, 2019
To: Ronald Burton, Interim City Manager
From: Trameka A. Williams, Asst. Director of Human Resources
RE: A Resolution Approving a Settlement in the Amount of $35,836.61 Against Texas
Municipal League (TML) for Flood related Damages to the Armory Building (3451 57th
Street)
Nature of the request: On August 30, 2017, the Armory building (3451 57th Street),
sustained damages during the flooding from Hurricane Harvey.
StaffAnalvsis, Considerations: The City has Flood insurance coverage through Texas
Municipal League (TML). Texas Municipal League (TML) has offered the City a settlement of
$35,836.61, less the 1% deductible of the value of the building in the amount of $16,176.00,
making the final settlement offer $19,660.81. This amount is sufficient to cover all current
property damages for the Armory building (3451 57th Street). If additional damages are
discovered, Texas Municipal League (TML)may issue a supplemental payment.
Recommendation: I recommend approval of Proposed Resolution No. 21006 authorizing the
property damage settlement against Texas Municipal League (TML) for damage sustained to the
Armory building (3451 57th Street). Texas Municipal League (TML) has offered to settle the
claim for $$35,836.61, less the 1% deductible of the value of the building in the amount of
$16,176.00, making the final settlement offer $19,660.81. This is considered a fair and
reasonable settlement.
Budt et Considerations: The funds received will be deposited in the Insurance Proceeds
Account#147-0000-369.85-00, Project#082617.
"Remember we are here to serve the Citizens of Port Arthur"
P.R. No. 21006
08/15/19 TAW
RESOLUTION NO.
A RESOLUTION AUTHORIZING THE CITY MANAGER
TO EXECUTE THE SETTLEMENT OF A CLAIM IN THE AMOUNT OF $35,836.61 MADE
AGAINST TEXAS MUNICPAL LEAGUE (TML) AS A RESULT OF THE FLOOD DAMAGE
TO THE ARMORY BUILDING (3451 57TH STREET)
WHEREAS, on August 29, 201 7, Hurricane Harvey struck the City of Port Arthur,
resulting in flood damage to the Armory Building; and,
WHEREAS, as a result of the damage, a claim was filed with Texas Municipal
League (TML); and,
WHEREAS, Texas Municipal League has offered to settle the claim for
$35,836.61 , less the 1 % deductible in the amount of $16,176.00, making the final
settlement offer $19,660.81 , which has been determined to be a fair and reasonable
settlement.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
PORT ARTHUR, TEXAS:
Section 1 . That, the facts and opinions in the preamble are true and correct.
Section 2. That, the City Manager is hereby authorized to execute the settlement
for flood damage to 3451 57th Street in the amount of $35,836.61 , less than the 1 %
deductible in the amount of $16,176, making the final settlement offer $19,660.81 .
This amount is based on an estimated cost for flood-related repairs; therefore, if additional
flood-related costs are incurred, Texas Municipal League (TML) may issue a supplemental
payment.
P.R. No. 21006
08/15/19 TAW
Section 3. That, a copy of this Resolution be spread upon the minutes of the City
Council.
READ, ADOPTED, AND APPROVED this day of , AD, 2019, at a
Meeting of the City Council of the City of Port Arthur, Texas, by the following vote:
AYES: Mayor Councilmembers
NOES:
Thurman "Bill" Bartle, Mayor
ATTEST:
Sherri Bellard, City Secretary
APPROVED AS TO FORM:
t4'/ - D.1 li �' tia1F0�
Val o, ty Attorney
APPROVED FOR ADMINISTRATION:
Ronald Burton, Interim City Manager
Doob
ismornissa
TML
INTERGOVERNMENTAL RISK POOL
Workers' Compensation • Property • Liability
August 08, 2019
Port Arthur
Attn: Elizabeth Diaz, HR Director
PO Box 1089
Port Arthur, TX 77641-1089
RE: TMLIRP Fund Member: Port Arthur
Date of Loss: August 30, 2017
TMLIRP Claim No: PR0000000065172
Hurricane Harvey damage to ID 520 — Old Armory
Dear Ms. Diaz:
Please find enclosed payment for replacement cost repairs to the structure less the 1%
deductible of $16,176.
Please don't hesitate to give me a call should you have any questions.
Si cerely,
ICJA,
isa Kutch
Senior Claims Specialist
Texas Municipal League Intergovernmental Risk Pool
Encls: TMLI RP Check, Check Support
Texas Municipal League Intergovernmental Risk Pool
1821 Rutherford Lane, First Floor • Austin, Texas 78754 • (512)491-2300 • (800)537-6655 Texas Only
P.O. Box 149194 • Austin, Texas 78714-9194
a) 2
a
-07sco
> N
O
a) O)
(0 CO N
_
O co a
O
co c5c
0 O
r 0
U
u) U
Lo kog
- O
Cp co
ON
co co
co T
11
CR
0 J
z GI U
O
2 (Ni 0
0- 10 U
O E/3
CO
N O COD
O
O OY N
I.=r U co
03
N -0 -0 C
O) Q_o o )
< U o0
U d
Cf) ea
A O
Oa)—
E =
• CT
Q Cll
—
"O Y
Q 7 a)
>
N- O U
as
a a)
x Cl cn
a) a) ami
O f U
N O O
O O IJ..
No CI '
T
co
co V) c (p
0 o O '5U D1
OOa ))ER
Y a) O V 'a U
as y 0 a) Q L c
u) a) CC L m II
JwQ 0 CC '5 up
0
U '-
2 cci
i II _c
a) Lt) 0
O CN.13
as
C▪IU) J
ii :: a� Er
• a � coca a`)
mI-- mU) Q A
PURCHASE ORDER PAGE 1
ORDER NUMBER MUST APPEAR ON ALL
CITYO F PORT ARTHUR INVOICES,PACKING LISTS&PACKAGES.
- NO. 217362
` FOR PROPER REMITTANCE:
City of ' ,'/ INVOICES AND BILL OF LADINGS MUST BE ORDER DATE: 5/09/2019
r�_T BILLED AND MAILED TO THIS ADDRESS ONLY:
p ort rrhrn PO BOX 1089 REQUISMON NO. 0000212286
f Texas ' ACCOUNTS PAYABLE
,,,,,-4' s ;..;•, PORT ARTHUR TX 77641 DELNERY DATE 5/09/2019
d „„,,,„ CRyssx�Fa 2 I NVOICES REQUIRED. VENDORNO. 6356
tT1DOR SHIP TO
SETEX CONSTRUCTION CORPORATION CITY OF PORT ARTHUR
501 PROCTOR 3451 57TH
SUITE 204 PORT ARTHUR, TX 77642
1PORT ARTHUR TX 77640
DB ' CONTRACT# f TERM NET/30
EM U/M QUANTITY DESCRIPTION 1
1 I U�lT PRICE AMOUNT
1 EA 1. 00 RENOVATION OF ARMORY BUIL 35836 . 6100 35836 . 61
DING
CHOICE PARTNERS CONTRACT #15/041JN-11
TOTAL 35836 .61
•
ER REQ.BY ` ACCOUNT#.
WILLIAMS, CLIFTON ADAM SAUNDERS 14723009013200
eery will be accepted at vendor's risk.Goods
;ubject to inspection and return if found in-
.5.dii I
r to specifications or reasonable quality.
..54b-44
44 -,.
V PURCHASING AGENT
FACILITIES&MAINTENANCE
"Strength in Construction"
Mailing Address:
P.O. Box 20658 April 30, 2019
Beaumont, Texas 77720-0658
Cliff Williams
® (409) 842-3181 City Of Port Arthur
a (409)842-2274 444 4thStreet
setex@setexconstruction.com Port Arthur, Texas 77640
setexconstruction.com
Project: "Armory"
General Contracting Subject: "Water Damage Repair"
Dear Mr. Williams
Job Order Contracting
This will serve as our proposal to repair building as per scope provided by the City of Port
Arthur. Costs include supervision, insurance, material, labor and equipment:
Facilities Maintenance Proposal Recap:
• Install 5/8 drywall in front of the building in areas removed
Commercial • Tape float and texture to match
• Repair inside of windows to leave tight finish
• Furnish and install (1) exterior door and hardware and (1) interior pre-hung door
unit
IndustrialFurnish and install (1) two foot vanity with top with fixtures along with (1) four
foot corner unit in conference area with top with fixtures
• Trim out entrance area window to match
Government • Change out water stained ceiling tiles
• Prep all walls and door jambs to receive finish material
• Apply eggshell finish to walls in front area(color to match)
Healthcare • Apply semi-gloss finish to all jambs in front area(color to match)
• Install new cove base in front area in all newly painted areas
• Pressure wash exterior
• Seal open expansion joints
Infrastructure • Work areas include offices 102-109,Foyer,Vault Corridor
Corporate
Education Proposal Cost $ 34,940.70
Bond (if applicable) $ 895.91
Total Price $ 35,836.61
Performing Arts
Historical
s 7