Loading...
HomeMy WebLinkAboutPR 21174: CHAVER CONSTRUCTION 7 CONTRACTING SERVICES, LLC CONTRACT City of �j ,_�. ,rt rthrr0_ www.PortArthurTx.gov INTEROFFICE MEMORANDUM Date: November 18, 2019 To: The Honorable Mayor and City Council Through: Ron Burton, City Manager From: Alberto Elefano, Director of Public Works RE: P. R. No. 21174 Introduction: Approval of Proposed Resolution No. 21174 for repairs to a drainage cave-in at 4601 9th Ave. by Shaver Construction& Contracting Services, LLC of Jasper,Texas,with a budgetary impact of$27,350.00. Background: A drainage cave-in was discovered at 4601 9th Ave. at the main outfall ditch. Failure in repairing the cave-in could potentially cause flooding in the area during a rain event. There is also concern for pedestrians in this area. An attempt was made by Drainage division staff to gain competitive quotes with only Shaver Construction& Contracting Services, LLC of Jasper,Texas,responding to the request. Budget Impact: Funds are provided in Account No. 001-1204-531.34-00, Public Works Department Drainage Division—Drainage Maintenance account. Recommendation: It is recommended that City Council authorize the City Manager to approve P. R. No. 21174, as discussed and/or outline above. /aw "Remember,we are here to serve the Citizens of Port Arthur" P.O.Box 1089 x Port Arthur,Texas 77641-1089 * 409.983.8101 x FAX 409.982.6743 P. R.21174 11/18/19 aw RESOLUTION NO. A RESOLUTION AUTHORIZING THE REPAIRS TO A DRAINAGE CAVE-IN AT 4601 9TH AVE. AND FURTHER AUTHORIZES THE CITY MANAGER TO ENTER INTO A CONTRACT WITH SHAVER CONSTRUCTION & CONTRACTING SERVICES,LLC OF JASPER,TEXAS FOR THE REPAIR, WITH A BUDGETARY IMPACT AMOUNT OF $27,350.00. FUNDING IS AVAILABLE IN THE PUBLIC WORKS DEPARTMENT DRAINAGE DIVISION — DRAINAGE MAINTENANCE ACCOUNT,ACCOUNT NO. 001-1204-531.34-00. WHEREAS, a drainage cave-in has been discovered at 4601 9th Ave., which could potentially cause flooding and other dangers to the area; and, WHEREAS, pursuant to Section 252.022(a)(2) a procurement necessary to preserve or protect the public health or safety of the municipality's residents; and, WHEREAS, it is further authorized pursuant to Section 252.022(a)(3) because of unforeseen damage to public machinery, equipment, or other property; and, WHEREAS, Drainage staff made effort to gain competitive quotes and Shaver Construction&Contracting Services,LLC of Jasper,Texas,provided the only bid for these repairs in the amount of$27,350.00; and, WHEREAS, the Director of Public Works deems it in the best interest of the City of Port Arthur to repair the cave-in at 4601 9th Ave. and to authorize the City Manager to enter into a contract with Shaver Construction& Contracting Services, LLC of Jasper, Texas; now therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT, the facts and opinions in the preamble are true and correct; and, THAT, in order to protect the health and safety of our citizens, the City Council hereby authorizes the Shaver Construction&Contracting Services,LLC of Jasper,Texas,to repair a cave- P. R.21174 11/18/19 aw in at 4601 9th Ave., as delineated in Exhibit "A" attached hereto, with an estimated budgetary impact of$27,350.00; and, THAT,funding is available in the Public Works Department Drainage Division—Drainage Maintenance account no. 001-1204-531.34-00; and, THAT a copy of the caption of this Resolution be spread upon the Minutes of the City Council. READ, ADOPTED, AND APPROVED this the day of , A.D. 2019 at a meeting of the City of Port Arthur, Texas by the following vote: AYES: Mayor: Councilmembers: Noes: Thurman"Bill" Bartie Mayor ATTEST: APPROVED AS TO FORM: P. DA 60t1Q(-Fo-F Sherri Bellard V.'/ Tize o City Secretary Ci ttorn APPROVED FOR ADMINISTRATION: APPROVED AS TO AVAILABLITY OF FUNDS: K-A-1\i. 40 Ron Burton Kandy Dani City Manager Di'-ctor of Finance Lt46, Alberto Elefano Clifton illiams Director of Public Works Purchasing Manager P.R.21174 11/18/19 aw Exhibit "A" Shaver Construction & Contracting Services, LLC 1747 CR 249 Phone# 409-384-2971 Estimate Jasper, Tx. 75951 E-mail office@bscjasper.com bscjasper.com Estimate# 895 Web Site shaverconstruction.net Date 10/31/2019 Name/Address Ship To City of Port Arthur hrad.hrown ri,portarthurtx.iuc Project P.O. # Description Units Hrs/Qty Rate Total Scope of Work- Provide all materials,labor.and equipment to excavate and repair multiple sections of RCP at location near 9th St.and 73 in Port Arthur TX. Includes Texas One Call, excavation to point as indicated during site walk with C/O Port Arthur representative. Removal of RCP sections as necessary,placement of stabilized sand on grade, re-installation of existing sections of RCP including grout and seals as needed,and back fill using existing and new select fill. Excludes:Finish seeding,Structural concrete,new RCP,or any additional materials and labor not listed above. Services 27350.00 27,350.00 61 (1)) Gam' Any changes from the original scope or any unforeseen delays at job site may cause a change in prices.Change Order maybe required.Estimated cost is good for 30 days.All invoices Subtotal $27,350.00 will be due and payable in Jasper County Texas.Accounts not paid within terms are subject to a 1.5%monthly finance charge. Sales Tax (0.0%) $0.0r Customer Signature Date: Total $27,350.00