HomeMy WebLinkAboutPR 21254: CAROLINA AVENUE PAVEMENT IMPROVEMENT PROJECT, CHANGE ORDER NO. 1, GREEN SCAPES 6, LLC City of i,
hu0ha
-
ort rtTexas
www.PortArthurTx.gov
INTEROFFICE MEMORANDUM
Date: January 22, 2020
To: The Honorable Mayor and City Council
Through: Ron Burton, City Manager
From: Alberto Elefano, P.E.,Public Works Director
RE: P.R. 21254: Carolina Avenue Pavement Improvement Project North of Gulfway
Drive, Change Order No. 1 for upgrade of stormwater drainage system that
increases original contract amount by$20,452.00; Project No.: ST1P10.
Introduction:
The intent of this Agenda Item is to authorize the City Manager to execute Change Order No. 1
which increases the original contract amount by $20,452.00 to the new contract amount of
$1,232,035.50 for the Carolina Avenue Pavement Improvement Project North of Gulfway Drive.
Background:
Pursuant to Resolution No. 19-342, Greenscapes 6, LLC of Baytown, Texas (Contractor) was
awarded the project for Carolina Avenue Pavement Improvement Project. The Contractor
commenced construction of the project outside the limits defined in the original scope of the
contract. The Contractor agreed to make necessary repairs to restore the Carolina Avenue
Roadway north of Gulfway Drive at their own expense. The City of Port Arthur determined that
this was an opportunity to repair the existing drainage system. Change Order No. 1 has been
submitted for stormwater drainage system upgrades that increase the original contract amount
of$1,211,583.50 by$20,452.00 to the new contract amount of$1,232,035.50.
Budget Impact:
Change Order No. 1 impacts funds in the Capital Improvement Account for the Street
Maintenance and Repair,Account No. 307-1601-591.86-00. Project No. ST1P10.
"Remember,we are here to serve the Citizens of Port Arthur"
444 4th Street X Port Arthur,Texas 77641-1089 X 409.9818182 X FAX 409.983.8294
Recommendation:
It is recommended that the City of Port Arthur City Council approve PR 21254 with Greenscapes
6, LLC of Baytown, Texas authorizing the City Manager to execute Change Order No. 1
increasing the original contract amount of $1,211,583.50 by $20,452.00 to the new contract
amount of$1,232,035.50 for the upgrade of the stormwater drainage system on Carolina Avenue
north of Gulfway Drive.
"Remember,we are here to serve the Citizens of Port Arthur"
P.O.Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8101 X FAX 409.982.6743
PR No.21254
1/22/20 mje
Page 1 of 3
RESOLUTION NO.
A RESOLUTION AUTHORIZING THE CITY MANAGER TO
EXECUTE CHANGE ORDER NO. 1 TO THE CONTRACT BETWEEN
THE CITY OF PORT ARTHUR AND GREENSCAPES 6, LLC OF
BAYTOWN, TEXAS FOR THE REPAIRS AND RESTORATION OF
THE CAROLINA AVENUE PAVEMENT IMPROVEMENT PROJECT
NORTH OF GULFWAY DRIVE THAT INCREASES THE
CONTRACT AMOUNT BY $20,452.00 FROM THE ORIGINAL
CONTRACT AMOUNT OF $1,211,583.50 TO THE NEW
CONTRACT AMOUNT OF $1,232,035. FUNDING IS AVAILABLE
IN THE CAPITAL IMPROVEMENTS STREET ACCOUNT NO. 307-
1601-591.86-00. PROJECT NO. ST1P10.
WHEREAS, pursuant to Resolution No. 19-342, the City of Port Arthur City Council
awarded a contract for the Carolina Avenue Pavement Improvement Project to
Greenscapes 6, LLC of Baytown, Texas with a projected budgetary impact of
$1,211,583.50 and a term of 290 calendar days; and,
WHEREAS, Greenscapes 6, LLC of Baytown, Texas commenced construction of
the project outside the limits defined in the original scope of the contract and agreed to
make necessary repairs to restore the Carolina Avenue Roadway north of Gulfway Drive
at their own expense; and,
WHEREAS, the City of Port Arthur determined that this was an opportunity to
repair the existing drainage system; and,
WHEREAS, Change Order No. 1 has been submitted for stormwater drainage
system upgrades that increase the original contract amount of $1,211,583.50 by
$20,452.00 to the new contract amount of $1,232,035.50; and,
PR No. 21254
1/22/2020 m j e
Page 2 of 3
WHEREAS, approval of Change Order No. 1 is herein deemed an appropriate
action; now, therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR:
THAT, the facts and opinions in the preamble are true and correct; and,
THAT, Change Order No. 1 is herein approved and the City Manager is authorized
to execute said Change Order No. 1 to the contract between the City of Port Arthur and
Greenscapes 6. LLC of Baytown, Texas; and
THAT, Change Order No. 1, submitted by Greenscapes 6. LLC of Baytown, Texas
increases the contract amount by $20,452.00 from the original contract amount of
$1,211,583.50 to the new contract amount of $1,232,035.50; and,
THAT, a copy of the caption of this Resolution be spread upon the Minutes of the
City Council.
READ, ADOPTED AND APPROVED this the day of , A.D. 2020 at
a meeting of the City of Port Arthur, Texas by the following vote:
Ayes: Mayor:
Councilmembers:
Noes:
Thurman "Bill" Bartie
Mayor
PR No.21254
1/22/20 mje
Page 3 of 3
ATTEST:
Sherri Bellard
City Secretary
APPROVED AS TO FORM: APPROVED FOR ADMINISTRATION:
/(
J '
Valecia Tizeno f Ron Burton
City Attorney City Manager
APPROVED AS FOR AVAILABILITY OF
FUNDS:
n
` /
� (�C� U J C(A-
Kandy Daniel)
Interim Director of Finance
Alberto Elefano, P.E.
Director of Public Works
I LAA14..-
l l )
Clifton Williams, CPPB
Purchasing Manager
EXHIBIT A
f TBPE Firm No.F-5755
OUT
'y e _ TBPLS Firm No.10123800
_ —_ LA EF.00057n
3737 Doctors Drive
G ' Port Arthur,Texas 77642
SURVEYORS&'ENGINEERS --s - Office(409)983.2004
Fax(409)983.2005
January 9, 2020
City of Port Arthur
444 4th Street
Port Arthur,Texas 77640
Re: Carolina Avenue—Change Order No. 1
Change Order No. 1 is for drainage upgrades to Carolina Avenue north of Gulfway.
Background:
Greenscapes Six, LLC(Contractor),for the Carolina Avenue Road project commenced construction of
the project outside the limits defined in the contract documents and the preconstruction meeting.
Approximately 340 liner feet of the concrete roadway, starting at the cul-de-sac in the west lane of
Carolina (north of Gulfway)was ultimately demolished.The Contractor acknowledged their mistake
and agreed to restore the roadway to previous existing conditions at their expense.
Change Order No. 1
The City discovered that this mistake provided unique opportunity to enhance the drainage for the
citizens for a large portion of Carolina Avenue.This change order is for drainage upgrades to
Carolina north of Gulfway.
The drainage inlet in the west lane at the cul-de-sac was upgraded to a curb inlet with extensions to
accept additional storm water runoff at a faster rate.The pipe from the inlet to the storm sewer
outfall was upsized to handle additional runoff.The tie-in to the storm sewer outfall was upgraded
by adding a junction box.The junction box allows accessibility to inspect,clean, and maintain the
storm sewer outfall in that area.
The curbs in the east lane within this area was in poor shape.To better define the gutter line for
runoff, enhance the roadway appearance and to match the west's lanes new curb,the City directed
new curb be installed within this area.
If you have any questions, please contact our office.
Respectfully submitted,
s
vidr
J- y Mitc eN, P.E., RPLS
CITY OF PORT ARTHUR
DATE NOVEMBER 26,2019
PROJECT: STIPIO-PROPOSED IMPROVEMENTS TO CAROLINA AVENUE(NORTH SIDE
CAROLINA LMPROVEMENTS)
OWNER: CITY OF PORT ARTHUR
CONTRACTOR: GREENSCAPE SIX,LLC(713)714-3590
CHANGE ORDER NO.: 01
THE FOLLOWING CHANGES IN THE PLANS AND/OR SPECIFICATIONS ARE HEREBY MADE:
Add/Delete Construction Items and/or quanlilir,to the Contract:
Item No. Description Unit Original New Uoit Amount
Quantity Quantity Peke
PAVING AND DRAINAGE
ADDITION
104.001 Remove Concrete Driveways&Sidewalks • SY 445 502 $13501 $49950
104.002 Remove Concrete Culverts( (Driveways&Sldewatics)(Remove cx£stine IF 1022 1082 $15.00 $90400
104.003 Remove Concrete 6"Mono Curb LF 265 5530 $1,45750
24^A11N HP-Storm Pipe(or equal)(with Cement Stabilized) LF 500 560 $30.00 $1,800.00
465,001 Rebuild Curb Islet(0 GullwNew
ay,Complete in Place(Hem Used For
Inlet installed in Cul-de-Sac,North Side of Carolina) EA 1 2 $5,000.00 S5,000-00
465.002 Jmvctlna Sade Bos,Complete la Place(North de of Carolina In Dralts>;c FA 1 2 55500.00 $5500.00
easement at end eteol-de-sac)
530.003 Driveways(Concrete 4"),Complete in Place SY 12015 12405 $50.01 51.7450.00
Concrete Curb(TY II)(6")(City Regina,Northeast Zane of Roadway,
LF 15740 1045 $L7.00 53.445.00
Southeast Lane Past Sawcvq
PAVING&DRAINAGE TOTAL AMOUNT ADDED $20,452.00
CHANGE ORDER TOTAL AMOUNT ADDED $20,452.00
ORIGINAL CONTRACT AMOUNT: $1,212.583,50
NET FROM PREVIOUS CHANGE ORDERS: $0.00
TOTAL.AMOUNT OF THIS CHANGE ORDER.: $20,452.00
PERCENT OF THIS CHANGE ORDER: 1.69%
TOTAL PERCENT CHANGE ORDER TO DATE: 1.69%
NEW CONTRACT AMOUNT: $1,232,03550
NO TALI{ND DA • IIAVE BE N•ADDED IN THE CONTRACT BY T S CHANGE ORDER
.i- /
PREPARED BY:
CON •ACTOR JF..P�:.titY s R'ClIF:LI„P.E.,RPlS
GREENSCAPE SIX,LLC SOLI:X SU VEYOICS&ENGINEERS
DeWAYNE DAVIS.P.E.ci4Sriv AI.BERTO ELEFANO.P.E-
CITY ENGINEER PUBLIC WORKS DIRECTOR
ATTESTED BY:
RON BURTON CLIFTON WILLIAMS,CPBB
CITY MANAGER PURCHASING MANAGER