INTEROFFICE MEMORANDUM
Date: January 22,2020
To: The Honorable Mayor and City Council
Through: Ron Burton, City Manager
From: Alberto Elefano, P.E., Public Works Director
RE: P.R. 21256: Sunken Court Roadway Reconstruction Project from Twin City Highway to
North Park Drive, Change Order No. 1 for removal and replacement of existing waterline
that increases original contract amount by$41,225.48; Project No.: ST1P02.
Introduction:
The intent of this Agenda Item is to authorize the City Manager to execute Change Order No. 1 which
increases the original contract amount by $41,225.48 to the new contract amount of$2,309,568.61 for the
Sunken Court Reconstruction Project from Twin City Highway to North Park Drive.
Background:
Pursuant to Resolution No. 19-412,Excavation&Construction,LLC of Port Arthur,Texas was awarded the
project for the Sunken Court Reconstruction Project from Twin City Highway to North Park Drive. Change
Order No. 1 has been submitted that increases original contract amount of$2,268,343.13 by $41,225.48 to
the new contract amount of$2,309,568.61 for the removal and replacement of an existing waterline.
Budget Impact:
Change Order No. 1 impacts funds in the Capital Improvement Account for the Street Maintenance and
Repair,Account No. 307-1601-591.86-00. Project No. ST1 P02.
Recommendation:
It is recommended that the City of Port Arthur City Council approve PR 21256 with Excavation &
Construction, LLC of Port Arthur, Texas authorizing the City Manager to execute Change Order No. 1
increasing the original contract amount of $2,268,343.13 by $41,225.48 to the new contract amount of
$2,309,568.61 for the removal and replacement of an existing waterline.
"Remember,we are here to serve the Citizens of Port Arthur"
444 4'h Street X Port Arthur,Texas 77641-1089 X 409.983.8182 X FAX 409.983.8294
PR No.21256
1/22/20 mje
Page 1 of 3
RESOLUTION NO.
A RESOLUTION AUTHORIZING THE CITY MANAGER TO
EXECUTE CHANGE ORDER NO. 1 TO THE CONTRACT BETWEEN
THE CITY OF PORT ARTHUR AND EXCAVATION &
CONSTRUCTION, LLC OF PORT ARTHUR, TEXAS FOR THE
SUNKEN COURT ROADWAY RECONSTRUCTION PROJECT
FROM TWIN CITY HIGHWAY TO NORTH PARK DRIVE FOR THE
REMOVAL AND REPLACEMENT OF AN EXISTING WATER LINE
THAT INCREASES THE CONTRACT AMOUNT BY $41,225.48
FROM THE ORIGINAL CONTRACT AMOUNT OF $2,268,343.13
TO THE NEW CONTRACT AMOUNT OF $2,309,568.61.
FUNDING IS AVAILABLE IN THE CAPITAL IMPROVEMENTS
STREET ACCOUNT NO. 307-1601-591.86-00. PROJECT NO.
ST1P02.
WHEREAS, pursuant to Resolution No. 19-412, the City of Port Arthur City Council
awarded a contract for the Sunken Court Reconstruction Project from Twin City Highway
to North Parke Drive to Excavation & Construction, LLC of Port Arthur, Texas with a
projected budgetary impact of $2,268,343.13 and a term of 230 calendar days; and,
WHEREAS, proposed Change Order No. 1 is submitted to the contract by
Excavation & Construction, LLC of Port Arthur, Texas for the removal and replacement of
an existing water line that increases the contract amount by $41,225.48 from the original
contract amount of $2,268,343.13 to the new contract amount of $2,309,568.61; and,
WHEREAS, approval of Change Order No. 1 is herein deemed an appropriate
action; now, therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR:
THAT, the facts and opinions in the preamble are true and correct; and,
PR No. 21256
1/22/2020 mje
Page 2 of 3
THAT, Change Order No. 1 is herein approved and the City Manager is authorized
to execute said Change Order No. 1 to the contract between the City of Port Arthur and
Excavation & Construction of Port Arthur, Texas for the removal and replacement of an
existing waterline; and
THAT, Change Order No. 1, submitted by Excavation & Construction, LLC of Port
Arthur, Texas will increase the contract amount by $41,225.48 from the original contract
amount of $2,268,343.13 to the new contract amount of $2,309,568.61; and,
THAT, a copy of the caption of this Resolution be spread upon the Minutes of the
City Council.
READ, ADOPTED AND APPROVED this the day of , A.D. 2020 at
a meeting of the City of Port Arthur, Texas by the following vote:
Ayes: Mayor:
Council members:
Noes:
Thurman "Bill" Bartie
Mayor
ATTEST:
Sherri Bellard
City Secretary
PR No.21256
1/22/20 mje
Page 3 of 3
APPROVED AS TO FORM: APPROVED FOR ADMINISTRATION:
J7, •
Valecia Tizeno Ron Burton
City Attorney City Manager
APPROVED AS FOR AVAILABILITY OF
FUNDS:
/<CA.7N-cdv )�
Kandy Danil
Interim Director of Finance
Alberto Elefano, P.E.
Director of Public Works 4Clifton Williams, CPPB
Purchasing Manager
EXHIBIT A
I
SPI ._ ...
•
111
December 26, 2019 SCHAUMBURG POLK,INC,
NGINEEHING:A BETTER FUTURE
Mr. Alberto Elefano, P.E. 1
City of Port Arthur, Texas
City Hall, 444 4'h Street
Port Arthur, Texas 77460
Re: Sunken Court Roadway Reconstruction — Change Order No.1
Contract No. 19-239
Dear Mr. Elafano,
Attached you will find Change Order No. 1 for the referenced project. Upon excavation I
of the pavement along North Park at the intersection of Sunken Court the exposed
existing waterline was cast iron with leaking joints and has insufficient cover. Upon
meeting on the job site with PW-E and water utilities City personnel, it was agreed upon
to remove and replace the existing waterline under the new concrete section along North
Park. Including lowering the water line to have sufficient cover, thereby necessitating the
installation of bends and replacing existing fire hydrant on the waterline.
Also discussed at the same meeting was extending the concrete pavement, on the south
side of North Park and Sunken Court to the flare end return of the school concrete drive
onto North Park. Originally the concrete ended at the return of Sunken Court, thus
putting the asphalt transition to the existing pavement on North Park ending in the middle
of the school concrete drive.
This change order reflects items added as well as items deducted to accomplish this
work. If you have any questions or need any additional information, please do not
hesitate to contact me at (409) 866-0341.
Sincerely,
SCHAUMBURG & POLK, INC.
t4oy ZCJ4-4 -: .-.-..-..--r
Troy Whitehead, P.E.
Cc w/enclosures:
3
• 4
i
8865 College Street. Suite 100 I Beaumont, TX 77707
P: 409 866.0341 ( F: 409.866.0337 www.SPI-ENG.com
;.1 11
CITY OF PORT ARTHUR
DATE: DECEMBER l8,2019
PROJECT: SUNKEN COURT ROADWAY RECONSTRUCTION
OWNER: CITY OF PORT ARTHUR
CONTRACTOR: EXCAVATORS AND CONSTRUCTORS,LLC. '
CHANGE ORDER NO.: III
THE FOLLOWING CHANGES IN THE PLANS ANTI)/OR SPEGIB'ICAT,IOLgi3 i�aARE.REREBY MADE; Asim
it
Add/Delete Construction Items and/or quantities to the Contract:
Item New Item Original! NOY I nit
No. Item Code Description Unit !lilt.. Amount
Quantity I Quantity P,ice
PAVING AND DRAINAGE 1
DEDUCTION
3 247.001 6^Flexible Base SY 840 770.0 (70.0) 324.07 151,634.90)
6 340.001 2"HMAC Pavement TN 117 112 (5.0) 5287.50 (51,437.50)
7 529.001 Concrete Curb and Gutter for asphalt Transition LF 300 778.5 (21.5) $28.75 ($618.13)
TOTAL AMOUNT DEDUCTED 153,7405.11
ADDITION
5 360.001 8"Thick Reinforced Portland Cement Concrete Pavement SY 9,426 9,490 64.0 582.26 55,264.64
15 666.002 Refectorized pavement markings LF 4,600 4,621 21.0 51.44 530.24
16 678.002 Pavement Surface Preparation LF 4,600 4,621 21.0 $0.58 $12.18
46 465.005 Adjust existing storm sewer inlet and grate EA
- 1 2 2.0 $3500.00 $3,008.80
TOTAL AMOUNT ADDED 58.307.86
I"TII_I1 IES
DEDUCTION
23 810.004 Connect to Existing Waterline EA 5 4 (1) 54.128.78 (54.120.78)
TOTAL AMOUNT DEDUCTED (54.1211.781
ADDITION
22 808.002 Proposed Fire Hydrant Assembly EA 4 5 1.0 $5,851.95 55,851.95
42 810.004 Remove and Replace existing 8"D.1 waterline with 8"C900 CL150 PVC LF - 200 200.0 $132.03 526,406.00
43 811.004 Furnish and Install 8"AWWA Resilient Seat Cate Valve EA - 2 LO $2,394.00 54,788.00
44 811.005 Furnish and Install 8"AW WA 45 Degree Bends EA - 4 4.0 5662.76 $2,651.04
-
45 811.006 Furnish and Install 8^x 6"AWWA Tee EA - I 1.0 $1,090.73 $1,090.73
TOTAL AMOUNT ADDED 411
5 .787.72
s
TOTAL AMOUNT DEDUCTED FROM CONTRACT (57,869.31)
TOTAL AMOUNT ADDED TO CONTRACT
549,094.78
CHANGE ORDER TOTAL AMOUNT 541,225.48
ORIGINAL CONTRACT AMOUNT: 52,268 313.13
NET FROM PREVIOUS CHANGE ORDERS: $2,268,343.13
TOTAL AMOUNT OF THIS CHANGE ORDER: $41,225.48
PERCENT OF THIS CHANCE ORDER:
1.82%
TOTAL PERCENT CHANGE ORDER TO DATE: I 82
NEW CONTRACT AMOUNT: 52,309,568.61
NO CALENDAR DAYS
HAVE BEEN ADDED IN THE CONTRACT'BY TRIS:OHAN.E ORDER. , lfielf,M
:A('('1,Pl I.D BY: r. / PREPARED BY: ��/ .. . �
EXCA/V/ArTOORSS AND CONSTRUCTORS,LLC. ��SlICHAULMBBUURG&�POOL(K,INC.
APPROVED BY: /
DE AYN/.DAVIS P.E. "( ALBERTO ELEFANO,P.E.
C ENGINEER PUBLIC WORKS DIRECTOR
ATTESTED BY:
RON BURTON CLIFTON WILLIAMS,CPBB
CITY MANAGER