PR 21279: TWDB APPLICATION FOR SABINE PASS WWTP
dia City of A Ak ort rthtrr www.PortArthu rTx.gov INTEROFFICE MEMORANDUM Date: February 11, 2020 To: The Honorable Mayor and City Council Through: Ron Burton, City Manager From: Donald Stanton, Interim Director of Utilities RE: Proposed Resolution No. 21279—TWDB Application for Sabine Pass WWTP Introduction: Sabine Pass Wastewater Treatment Plant (WWTP)Upgrades project is proposed to be funded under the Texas Water Development Board Clean Water State Revolving Fund (CWSRF). Arceneaux Wilson & Cole, LLC (AWC) is preparing the Project Information Form (PIF) for this project to get project approval for a loan application commitment for the fall of 2020. This loan application commitment does not obligate the City to the funding but allows the City to be considered for funding up to the amount requested in the PIE. Background: The Sabine Pass WWTP Upgrades project as included provides for a complete replacement of the existing WWTP with a new 0.67-MGD conventional treatment plant. The new plant will include upgrades to the existing WWTP lift station, headworks (grit removal and bar screening), activated sludge treatment (aeration), clarification, chlorination, digestion, and site improvements. Budget Impact: The estimated cost for these improvements is $9.98/gallon of treatment for a total project cost of$8,191,000. Recommendation: It is recommended that City Council approve the City Manager to submit an application to the Texas Water Development Clean Water State Revolving Fund Program, as discussed and/or outline above. "Remember,we are here to serve the Citizens of Port Arthur" P.O.Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8101 X FAX 409.982.6743 P. R.No.21279 02/11/2020 bw Page 1 of 2 RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO SUBMIT AN APPLICATION TO THE TEXAS WATER DEVELOPMENT BOARD CLEAN WATER STATE REVOLVING FUND PROGRAM. REQUESTED FUNDS ARE NECESSARY FOR IMPROVEMENTS TO THE SABINE PASS WASTEWATER TREATMENT PLANT. WHEREAS,the Texas Water Development Board provides low interest loans through the Clean Water State Revolving Fund Program (CWSRF) for the planning, design and construction of wastewater projects, including collection systems; and, WHEREAS,the CWSRF rates are up to one percent(1%) lower than market rates; and, WHEREAS,the City is currently performing an overhaul for the Sabine Pass Wastewater Treatment Plant; and, WHEREAS, an entity seeking CWSRF funding in the fiscal year 2020 must submit an information form for priority ranking by April 30, 2020; and, WHEREAS, it would be in the City's best interest to apply for funding of this project through the CWSRF. NOW THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT,the facts and opinions in the preamble are true and correct; and, THAT, the City Manager is hereby authorized to submit the attached Exhibit A information form to the Texas Water Development Board CWSRF for the purpose of ranking the Sabine Pass Wastewater Treatment Plant for funding; and, THAT a copy of the caption of this resolution be spread upon the minutes of the City Council. P.R. No.21279 02/11/2020 bw Page 2 of 2 READ,ADOPTED,AND APPROVED THIS day of , 2020 at a Regular Meeting of the City Council of the City of Port Arthur, Texas, by the following vote: AYES: Mayor ; Councilmembers: NOES: Thurman"Bill" Bartie Mayor ATTEST: APPROVED AS TO FORM: (944)/ Sherri Bellard Val if ize City Secretary City A orne APPROVED FOR ADMINISTRATION: Ron Burton City Manager Donald Stanton Interim Director of Utilities Kandy Daniel Clifton liams, CPPB Interim Director of Finance Purchasing Manager Exhibit A __ 1 ...44) .. ARCENEAUX WILSON &COLE eagineen"g surveyng plan—ing City of Port Arthur Sabine Pass Wastewater Treatment Plant Upgrades Clean Water State Revolving Fund (CWSRF) SFY 20 Project Information Form (PIF) February 11, 2020 The Sabine Pass Wastewater Treatment Plant (WWTP) Upgrades project is proposed to be funded under the Texas Water Development Board Clean Water State Revolving Fund (CWSRF). Arceneaux Wilson &Cole, LLC (AWC) is preparing the Project Information Form (PIF) for this project to get project approval for a loan application commitment for the fall of 2020. This loan application commitment does not obligate the City to the funding but allows the City to be considered for funding up to the amount requested in the PIF. Note that this PIF is being submitted for Planning,Acquisition, and Design (PAD)funding only. After planning, acquisition, and design is complete, construction funds will be requested. The Sabine Pass WWTP Upgrades project as included provides for a complete replacement of the existing WWTP with a new 0.67-MGD conventional treatment plant. The new plant will include upgrades to the existing WWTP lift station, headworks (grit removal and bar screening), activated sludge treatment (aeration), clarification, chlorination, digestion, and site improvements. The estimated cost for these improvements is $9.98/gallon of treatment for a total project cost of $8,191,000. 409.724.7888 2901 Turtle Creek Dr.Suite 320 Port Arthur,TX 77642 Engineering Surveying awceng.com c 16194 10194049 PIF Estimated Costs - #1319407 Entity Name: Port Arthur New Entity Name: null Project Name: Sabine Pass Wastewater Treatment Plant Upgrade Report generated by: PRODOLA2$, Tue Feb 11 13:13:05 CST 2020 i P••E O F •rF+ , Please review the estimated costs below, then sign and upload. i • �� •:" *. .* Signature CALL etru, 0 CALVIN D.PROSEN P � 70405 ••�� Seeking planning funding Y 1IFR�brsTea�•:''� s• • . . . • Seeking acquisition funding Y �i�\\����N� Seeking design funding Y C � � Seeking construction funding N 02/11/2020 Cost Category (a) Planning (b)Acquisition (c) Design (d) (e) Total Construction (a)+(b)+(c)+(d) POTW Project: $0 $0 $0 $5,572,150 $5,572,150 Treatment Project POTW Project: $0 $0 $0 $0 $0 Collection Project NPS Project $0 $0 $0 $0 $0 Estuary $0 $0 $0 $0 $0 Management Project Engineering $150,000 $0 $801,000 $353,000 $1,304,000 General, Legal, $200,000 $0 $0 $0 $200,000 Financial Contingency $0 $0 $0 $1,114,850 $1,114,850 Other $0 $0 $0 $0 $0 (Describe Cost) Subtotal (Add $350,000 $0 $801,000 $7,040,000 $8,191,000 all rows above) Financing from $0 $0 $0 $0 $0 Local Funds Financing from $0 $0 $0 $0 $0 Other Funds Subtotal, SRF- $350,000 $0 $801,000 $7,040,000 $8,191,000 Funded Amount r-t Cnivc ARCENEAUX WILSON&COLE r.v b..,.,�...ev v au„ Opinion of Probable Construction Cost - Summary City of Port Arthur Sabine Pass WWTP Replacement Updated February 11, 2020 1:55 PM Item Description Item Cost 1. Mobilization $135,900.00 2. Sitework $283,500.00 3. Influent Lift Station - Rehab Existing $273,500.00 4. Headworks - Screening Structure - 2 Channels (4-ft x 5-ft x 20- $477,500.00 ft) & Grit Removal Basin - 1 Channels (10-ft x 20-ft x 20-ft) 5. Aeration Basins - 2 Basins (14-ft x 17-ft x 34-ft) $728,750.00 6. Clarifiers - 2 © 39-ft Dia. x 14-ft. SWD $1,338,000.00 7. Digester Basins - 2 Basins (14-ft x 20-ft x 40-ft) $881,750.00 8. Chlorine Contact Basins - 2 Basins (10-ft x 10-ft x 26-ft) $263,750.00 9. Dechloration Basin - 1 Basin(s) (9-ft x 10-ft x 30.67-ft) $178,500.00 10. Yard Piping $138,000.00 11. Blower/Chlorine/Electrical Building (30-ft x 30-ft) $318,000.00 12. Electrical $555,000.00 Subtotal Construction Cost $5,572,150.00 Construction Contingency 20.0% $1,114,850.00 TOTAL OPINION OF CONSTRUCTION COSTS (ROUNDED) $6,687,000.00 Based on 0.67-MGD Design Capacity $9.98/gal Preliminary Phase Engineering (Survey, Geotech, Permit, etc.) $150,000.00 Design Phase Engineering $801,000.00 Construction Phase Engineering (Inspection & Constr. Admin.) $353,000.00 TOTAL ENGINEERING $1,304,000.00 TOTAL OPINION OF PROJECT COSTS (ROUNDED) $7,991,000.00 l� ARCENEAUX WILSON&COLE OPINION OF PROBABLE CONSTRUCTION COSTS City of Port Arthur Sabine Pass WWTP Replacement 2/11/20 1:55 PM Q:\1-ENGINEERING\1-PROJECTS\CPA-980\6-ENGINEERING\COST ESTIMATE\[OPCC Sabre Pass WWTP.xlsx]Summary Item No.&Description Quantity Unit Cost Item Cost 1. Mobilization 1 LS $135,900.00 $135,900.00 $135,900.00 2. Sitework $283,500.00 Clearing&Grubbing 3 AC $3,500.00 $10,500.00_ _ Limestone Paving&Road 396 TN $125.00 $49,500.00 Asphalt Access Road 2800 SY $75.00 $210,000.00 Drainage 1 LS $10,000.00 $10,000.00 Fine Grading 1 AC $1,000.00 $1,000.00 Seeding&Fertilizer 1 AC $2,500.00 $2,500.00 3. Influent Lift Station-Rehab Existing $273,500.00 Bypass Pumping 4 WKS $3,500.00 $14,000.00 •Install coating in wet well and dry pit 2070 SF $50.00 $103,500.00 Procure new Submersible Pumps 3 EA $20,000.00 $60,000.00 Install new Self Priming Pumps 3 EA S12,000.00 $36,000.00 Install new suction piping 1 LS $15,000.00 $15,000.00 Install new discharge piping,valves,&supports 1 LS $35,000.00 $35,000.00 Connection to existing force main 1 LS $10,000.00 S10,000.00 4. Headworks-Screening Structure-2 Channels(4-ft x 5-ft x 20-ft)&Grit Rem $477,500.00 Screening Structure- 2 Channels(4-ft x 5-ft x 20-ft) -- -—Reinforced Concrete Structure-Slab,12-in 6 CY $1,000.00 S6,000.00 Reinforced Concrete Structure-Walls,12-in 13 CY $1,250.00 S16,250.00 Grit Removal Basin:1 Channels(10-ft x 20-ft x 20-ft) Reinforced Concrete Structure-Slab,16-in 31 CY $1,000.00 $31,000.00 Reinforced Concrete Structure-Walls,12-in 39 CY $1,250.00 S48,750.00 Piling(Assume 1 pile/SF) 18 EA $2,250.00 $40,500.00 Control Gates 6 EA $10,000.00 $60,000.00 Mechanical Screens 2 EA $50,000.00 S100,000.00 Conveyors 2 EA $20,000.00 $40,000.00 Grit Removal 1 EA $75,000.00 $75,000.00 Grit Classifier 1 EA $40,000.00 S40,000.00 Misc.Metals(handrails,grating,etc.) 1 LS $20,000.00 $20,000.00 5. Aeration Basins-2 Basins(14-ft x 17-ft x 34-ft) $728,750.00 Reinforced Concrete Structure-Slab,18-in 95 CY $1,000.00 $95,000.00 Reinforced Concrete Structure-Walls,16-in 109 CY $1,250.00 $136,250.00 Control Gates 4 EA $10,000.00 $40,000.00 Piling (Assume 1 pile/25 SF) 70 EA $2,250.00 $157,500.00 Misc. Metals(stairs,handrails,grating,etc.) 1 LS $25,000.00 S25,000.00 Aeration Equipment 1 LS $250,000.00 $250,000.00 Air Piping 1 LS $25,000.00 $25,000.00 6. Clarifiers-2 @ 39-ft Dia.x 14-ft.SWD $1,338,000.00 Reinforced Concrete Structure-Slab,18-in 200 CY $1,000.00 $200,000.00 Reinforced Concrete Structure-Walls,16-in 240 CY $1,250.00 $300,000.00 Piling(Assume 1 pile/25 SF) 132 EA $2,250.00 $297,000.00 Clarifier Equipment 2 EA $175,500.00 $351,000.00 Misc.Metals(stairs,handrails,grating,etc.) 1 LS $30,000.00 $30,000.00 RAS Pumps 3 EA $20,000.00 $60,000.00 WAS Pumps 2 EA $15,000.00 S30,000.00 Scum Pumps 2 EA $15,000.00 $30,000.00 RAS/WAS/Scum Piping 1 LS 540,000.00 $40,000.00 7. Digester Basins-2 Basins(14-ft x 20-ft x 40-ft) $881,750.00 aro.. ARCENEAUX WILSON&COLE OPINION OF PROBABLE CONSTRUCTION COSTS City of Port Arthur Sabine Pass WWTP Replacement 2/11/20 1:55 PM Q'.\1-ENGINEERING\1-PROJECTS\CPA-980\6-ENGINEERING\COST ESTIMATE\[OPCC Sabine Pass WWTP.xlsx]Summary Item No.&Description Quantity Unit Cost Item Cost Reinforced Concrete Structure-Slab,18-in 126 CY S1,000.00 $126,000.00 Reinforced Concrete Structure-Walls,16-in 127 CY $1,250.00 $158,750.00 Control Gates 4 EA $10,000.00 $40,000.00 Piling (Assume 1 pile/25 SF) 92 EA $2,250.00 $207,000.00 _ Misc.Metals(stairs,handrails,grating,etc.) 1 LS $25,000.00 $25,000.00 Aeration Equipment 1 LS S300,000.00 $300,000.00 Air Piping 1 LS $25,000.00 $25,000.00 8. Chlorine Contact Basins-2 Basins(10-ft x 10-ft x 26-ft) $263,750.00 Reinforced Concrete Structure-Slab,18-in 49 CY $1,000.00 $49,000.00 Reinforced Concrete Structure-Walls,16-in 55 CY $1,250.00 $68,750.00 Control Gates 4 EA $10,000.00 $40,000.00 Piling (Assume 1 pile/25 SF) 36 EA $2,250.00 $81,000.00 Misc.Metals(stairs,handrails,grating,etc.) 1 LS $25,000.00 S25,000.00 9. Dechloration Basin-1 Basin(s)(9-ft x 10-ft x 30.67-ft) $178,500.00 Reinforced Concrete Structure-Slab,18-in 32 CY $1,000.00 $32,000.00 Reinforced Concrete Structure-Walls,16-in 54 CY $1,250.00 $67,500.00 Piling(Assume 1 pile/25 SF) 24 EA $2,250.00 $54,000.00 Misc.Metals(stairs,handrails,grating,etc.) 1 LS $25,000.00 $25,000.00 10. Yard Piping $138,000.00 Influent Piping 300 LF $50.00 $15,000.00 Aeration to Clarifier Splitter 100 LF $50.00 $5,000.00 Clarifier Splitter to Clarifiers 100 LF $50.00 $5,000.00 Clarifiers to Chlorine Contact 100 LF $50.00 55,000.00 Chlorine Contact to Discharge 300 LF $50.00 $15,000.00 RAS/WAS to Pumps,6-in.C900 PVC 100 LF $35.00 $3,500.00 RAS to Aeration Basins,6-in C900 PVC 200 LF $35.00 $7,000.00 WAS to Digester,4-in 200 LF $25.00 $5,000.00 Air Piping to Aeration Basins, 12-in GS above 200 LF $50.00 $10,000.00 ground Air Piping to Digester Basins, 12-in GS above 200 LF $50.00 $10,000.00 ground _ Drain Piping,6-in SDR-26 PVC 1000 LF $40.00 $40,000.00 Manholes 5 EA $3,500.00 $17,500.00 11. Blower/Chlorine/Electrical Building(30-ft x 30-ft) $318,000.00 Building Slab 28 CY $1,000.00 $28,000.00 Building Walls 1 LS $110,000.00 $110,000.00 Roof 1 LS $50,000.00 $50,000.00 Doors,Painting,Finish,Etc. 1 LS $30,000.00 $30,000.00 Blowers 3 EA $20,000.00 $60,000.00 Chlorine Feed Equipment 1 LS $40,000.00 $40,000.00 12. Electrical S555,000.00 Yard Lighting 1 LS $35,000.00 $35,000.00 Influent Lift Station 1 LS S60,000.00 $60,000.00 Headworks 1 LS $35,000.00 $35,000.00 Aeration Basin 1 LS $20,000.00 $20,000.00 Clarifiers 1 LS $15,000.00 $15,000.00 Digester Basins 1 LS $20,000.00 $20,000.00 Chlorine Contact Basins/Dechlorination 1 LS $20,000.00 $20,000.00 Generator 1 LS $175,000.00 $175,000.00 Blower/Chlorine/Electrical Building 1 LS $25,000.00 S25,000.00 SCADA 1 LS $150,000.00 $150,000.00 ill awc ARCENEALE5 W LSON&COLE OPINION OF PROBABLE CONSTRUCTION COSTS City of Port Arthur Sabine Pass WWTP Replacement 2/11/20 1:55 PM Q:\1-ENGINEERING\1-PROJECTS\CPA-980\6-ENGINEERING\COST ESTIMATE\[OPCC Sabine Pass WWT.xlsx]Summary Item No.&Description I Quantity I Unit Cost I Item Cost Total $5,572,150.00 Construction Contingency 20.0% $1,114,850.00 TOTAL OPINION OF CONSTRUCTION COSTS(ROUNDED) $6,687,000.00 Engineering $1,304,000.00 TOTAL OPINION OF PROJECT COSTS(ROUNDED) $7,991,000.00