HomeMy WebLinkAboutPR 21328: CITY HALL GAS GENERATOR CHANGE ORDER #1 FROM A&A ELECTRIC CO., LLC City of rt rthu i www.PortArthurTx.gov INTEROFFICE MEMORANDUM Date: March 20, 2020 To: The Honorable Mayor and City Council Through: Ron Burton, City Manager From: Alberto Elefano,P.E.,Public Works Director RE: P.R.21328: City Hall Gas Generator Change Order#1 from A&A Electric Co., LLC of Beaumont, Texas for the installation of a 3-foot concrete slab and the re-location/re-installation of the old generator to provide back-up emergency power during the upgrade process. Introduction: The intent of this Agenda Item is to authorize the City Manager to execute Change Order No. 1 from A&A Electric Co.,LLC of Beaumont,Texas which increases the contract amount by$52,888.00 from the original contract amount of$372,056.00 to the new contract amount of$424,944.00. Background: The City of Port Arthur bought a used diesel powered generator that was first used in Desert Storm (1990s). This generator has approached the end of its service life and parts for this generator are not made anymore. Pursuant to Resolution No. 19-503, A&A Electric, LLC of Beaumont, Texas was awarded the project for the installation of a new Generac Generator SG0625 625KW to provide emergency back-up power to City Hall during electrical outages. Change Order No. 1 allows for the installation of a 3-foot slab base for the new generator to eliminate any potential flooding occurrences. Additionally, it addresses the re-location and re-installation of the old diesel generator to provide back-up power during the upgrade process. Change Order No. 1 increases the contract amount by $52,888.00 from the original contract amount of$372,056.00 to the new contract amount of$424,944.00. Budget Impact: Change Order No. 1 impacts funds in the Capital Improvement Account No. 625-1801-531.92-06. Recommendation: It is recommended that the City of Port Arthur City Council approve PR 21328 with A&A Electric Co., LLC of Beaumont,Texas authorizing the City Manager to execute Change Order No. 1 for the installation of the 3-foot slab and the re-location of the old generator which increases the contract amount by$52,888.00 from the original contract amount of$372,056.00 to the new contract amount of$424,944.00. "Remember,we are here to serve the Citizens of Port Arthur" 444 46 Street X Port Arthur,Texas 77641-1089 X 409.983.8182 X FAX 409.983.8294 PR No.21328 3/20/20 mje Page 1 of 4 RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDER NO. 1 TO THE CONTRACT BETWEEN THE CITY OF PORT ARTHUR AND A&A ELECTRIC CO., LLC OF BEAUMONT, TEXAS FOR ELEVATION OF THE NEW GAS GENERAC GENERATOR AND THE RE-LOCATION AND RE- INSTALLATION OF THE OLD GENERATOR TO PROVIDE TEMPORARY POWER DURING THE UPGRADE THAT INCREASES THE CONTRACT AMOUNT BY $52,888.00 FROM THE ORIGINAL CONTRACT AMOUNT OF $372,056.00 TO THE NEW CONTRACT AMOUNT OF $424,944.00. FUNDING IS AVAILABLE IN THE CAPITAL IMPROVEMENTS ACCOUNT NO. 625-1801-531.92-06. WHEREAS, the City of Port Arthur bought a used diesel powered generator that was first used in Desert Storm (1990s). This generator has approached the end of its service life and parts for this generator are no longer manufactured; and, WHEREAS, pursuant to Resolution No. 19-503, the City of Port Arthur's City Council authorized the City Manager to purchase a Generac SG0625 625KW Natural Gas Generator through the BuyBoard Cooperative Purchasing Program from Waukesha- Pearce Industries, Inc.; and, WHEREAS, A&A Electric Co., LLC of Beaumont, Texas has been contracted to replace the aging diesel generator for the contracted amount of $372,056.00; and, WHEREAS, it has been deemed prudent to elevate the new replacement gas generator on a three-foot slab to protect sensitive parts from potential flooding during hurricanes or significant rain events; and, WHEREAS, City Hall is the hub for all communications services within the City and cannot have any interruption of power, the old diesel generator will be re-located to PR No.21328 3/20/2020 mje Page 2 of 4 the adjacent parking lot and re-installed to the electrical grid to provide temporary emergency back-up power; and, WHEREAS, A&A Electric Co., LLC of Beaumont, Texas has submitted Change Order #1 in the amount of $52,888.00 for the elevation of the new replacement gas generator and the re-location and re-installation of the old diesel generator to provide temporary power to City Hall during the upgrade process. See Exhibit A; and, WHEREAS, Change Order #1 will increase the contract amount by $52,888.00 from the original contract amount of $372,056.00 to the new contract amount of $424,944.00; and, WHEREAS, Change Order No. 1 is herein deemed an appropriate action; now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT, the facts and opinions in the preamble are true and correct; and, THAT, Change Order No. 1 is herein approved and the City Manager is authorized to execute said Change Order No. 1 to the contract between the City of Port Arthur and A&A Electric Co., LLC of Beaumont, Texas; and THAT, Change Order No. 1, submitted by AM Electric Co., LLC of Beaumont, Texas will increase the contract amount by $52,888.00 from the original contract amount of $372,056.00 to the new contract amount of $424,944.00; and, THAT, a copy of the caption of this Resolution be spread upon the Minutes of the City Council. PR No. 21328 3/20/20 mje Page 3 of 4 READ, ADOPTED AND APPROVED this the day of , A.D. 2020 at a meeting of the City of Port Arthur, Texas by the following vote: Ayes: Mayor: Councilmembers: Noes: Thurman "Bill" Bartie Mayor ATTEST: Sherri Bellard City Secretary APPROVED AS TO FORM: APPROVED FOR ADMINISTRATION: Valecia Tizeno Ron Burton City Attorney City Manager PR No.21328 3/20/2020 mje Page 4 of 4 APPROVED AS FOR AVAILABILITY OF FUNDS: ‘C..< �� C Kandy Daniel Acting Director of Finance c . I Alberto Elefano, P.E. Director of Public Works l=/n �V .et, Clifton Williams, CPPB Purchasing Manager EXHIBIT A A & A ELECTRIC CO. OF BEAUMONT, INC. 6250 WALDEN ROAD P.O. BOX 22986 BEAUMONT, TEXAS 77720 Phone: 409-842-4437 CHANGE ORDER #1 Proposal Submitted to: Date: March 26, 2020 City of Port Arthur Generator Work ATTN: Ms. Jennifer Edwards ORIGINAL CONTRACT PRICE: $372,056.00 CHANGE ORDER#1: $ 52,888.00 NEW CONTRACT AMOUNT: $424,944.00 SCOPE: We hereby submit specifications and estimates for: Implementing changes to existing generator pad and using existing generator for temporary power. 1. Reconfigure existing generator slab, pour 3ft. thick slab to elevate 3ft. $35,902.00 above existing sidewalk elevation,extend all raceways,extend all conductors,extend all controls. All required concrete is included. 2. Relocate existing generator to parking lot to provide temporary $16,986.00 emergency power during construction. Includes: relocation generator, temporary cabling,termination of unit and lifting crane. Temporary generator to use existing fuel. If additional fuel is required, additional fuel shall be provided by Owner. TOTAL CHANGE ORDER#1 $52,888.00 ORIGINAL CONTRACT TIME: 28 Calendar Days CURRENT DATE OF COMPLETION: April 29, 2020 CONTRACT TIME due to CHANGE ORDER: 0 Days NEW DATE OF COMPLETION: April 29,2020 Lee Acevedo, Jr. • A&A Electric Company of Beaumont Date of Acceptance Accepted by: City of Port Arthur Date of Acceptance