HomeMy WebLinkAboutPR 21370: EDC ACCEPTING A PROPOSAL FROM SITEK OMNI SERVICES, LLC Interoffice
MEMORANDUM
To: Mayor, City Council, City Manager
From: Floyd Batiste, CEO —76
Date: April 15, 2020
Subject: P.R. No. 21370; Council Meeting of April 21, 2020
ATTACHED IS PROPOSED RESOLUTION NO. 21370
APPROVING THE CITY OF PORT ARTHUR SECTION 4A
ECONOMIC DEVELOPMENT CORPORATION ACCEPTING
A PROPOSAL FROM SITEK OMNI SERVICES, LLC FOR
ADDITIONAL SELECTIVE ASBESTOS ABATEMENT
SERVICES AT THE FORMER PORT ARTHUR NEWS
BUILDING LOCATED 549 4TH STREET, PORT ARTHUR,
TEXAS IN AN AMOUNT NOT TO EXCEED $42,400.00;
FUNDS AVAILABLE IN EDC ACCOUNT NO. 305-1606-
591.82.00 PROJECT NO. EDC549
P.R. No. 21370
4/15/2020 KVM
RESOLUTION NO.
A RESOLUTION APPROVING THE CITY OF PORT
ARTHUR SECTION 4A ECONOMIC DEVELOPMENT
CORPORATION ACCEPTING A PROPOSAL FROM
SITEK OMNI SERVICES, LLC FOR ADDITIONAL
SELECTIVE ASBESTOS ABATEMENT SERVICES AT
THE FORMER PORT ARTHUR NEWS BUILDING
LOCATED 549 4TH STREET, PORT ARTHUR, TEXAS IN
AN AMOUNT NOT TO EXCEED $42,400.00; FUNDS
AVAILABLE IN EDC ACCOUNT NO. 305-1606-591.82.00
PROJECT NO. EDC549
WHEREAS, the City of Port Arthur Section 4A Economic Development Corporation
("PAEDC") has acquired the property at 549 4th Street, formerly the Port Arthur News Building,
for the purpose of renovating the building to house the Center for Community and Business
Development; and
WHEREAS, on May 21, 2019, the City Council of the City of Port Arthur per
Resolution 19-214, approved the PAEDC entering into a contract with Sitek Omni Services,
LLC ("Sitek") of Humble, Texas for asbestos, lead and mold abatement and interior demolition
at 549 4th Street; and
WHEREAS, on April 16„ 2020, the PAEDC Board of Directors approved entering into
an agreement with Sitek's Omni Services for additional building exterior asbestos abatement for
the following scope services:
1. Removal of exterior brick/block with asbestos black vapor barrier mastic to facilitate
the entry path on the southeast corner of building.
2. Saw cut and removal of exterior brick/block with asbestos black vapor barrier mastic
to facilitate the twelve window openings on the south side & east/west ends of
building.
3. Removal of two existing windows with asbestos caulking on the end of building.
4. Removal of transit panels on elevator on roof of building; and
WHERAS, Sitek has provided a proposal for the additional selective asbestos abatement
services for an amount of$42,400.00 as detailed in the Proposal attached hereto as Exhibit "A";
and
WHEREAS, on April 16, 2020, the PAEDC Board of Directors approved acceptance of
the proposal provided by Sitek for the selective asbestos abatement services in an amount not to
exceed$42,400.00.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF PORT ARTHUR:
Section 1. That the facts and opinions in the preamble are true and correct.
Section 2. That the City Council hereby authorizes PAEDC to accept the proposal from
Sitek Omni Services, LLC for selective asbestos abatement services at 549 4th Street in the
amount of$42,400.00 as follows:
1. Removal of exterior brick/block with asbestos black vapor barrier mastic to facilitate
the entry path on the southeast corner of building.
2. Saw cut and removal of exterior brick/block with asbestos black vapor barrier mastic
to facilitate the twelve window openings on the south side & east/west ends of
building.
3. Removal of two existing windows with asbestos caulking on the end of building.
»1643318 Page 2
4. Removal of transit panels on elevator on roof of building; and
.Section 3. That a copy of the caption of this Resolution be spread upon the Minutes of
the City Council.
READ,ADOPTED AND APPROVED on this day of A.D., 2020,
at a Meeting of the City Council of the City of Port Arthur, Texas, by the following vote:
AYES:
Mayor
Councilmembers
NOES:
Thurman Bartie, Mayor
ATTEST:
Sherri Bellard, City Secretary
APPROVED:
Floyd Batiste, PAEDC CEO
APPROVED AS TO FORM:
#1643318 Page 3
Guy N. Goodson, PAEDC Attorney
APPROVED AS TO FORM:
Valecia R. Tizeno, City Attorney
APPROVED AS TO AVAILABILITY OF FUNDS:
Kandy Daniel, Interim Finance Director
41643318 Page 4
EXHIBIT "A"
11111ffitlek OMEN,
w.,arum ut
* Selective and Structural Demolition • TDSHS Asbestos license #80-1070
Asbestos and Lead Abatement • 1DSHS.AlobtlII ummettIU1J B2
Hazardous and Mold Remediation • TDLR Mold License #RCO-1218
April 7, 2020
Mr. Floyd Batiste
Port Arthur Economic Development Corp.
501 Procter Street, Suite 100
Port Arthur, Texas 77640
SUBJECT: Selective Asbestos Abatement Services
Former Port Arthur News Building in Port Arthur, TX
Sitek Omni Proposal#20-04-01
Mr. Batiste,
Sitek Omni Services, LLC (Sitek) submits the following proposal, consisting of the
selective abatement of various asbestos containing materials as needed to facilitate
planned renovations to the Former Port Arthur News Building located at 549 4th Street in
Port Arthur, Texas.
I. SCOPE OF WORK
Sitek Responsibilities:
A. Preparation of the exterior regulated work areas in accordance with Total Safety
Technical Specifications, State (Texas DSHS) and Federal (EPA/OSHA)
regulations regarding the removal of exterior non-friable asbestos materials from
a public building scheduled for renovation.
B. Provide man-lifts as needed to access elevated materials scheduled for
abatement.
C. Remove and dispose of asbestos containing vapor barrier mastic from select
elevated exterior wall surface areas on the South side and East/West ends of the
building. This will require the removal of the outer layer of brick. Total work
surface work area is approximately 1,700 square feet.
D. Provide saw-cuts of new window openings (field marked lay-outs by the General
Contractor)through brick/block walls coated with vapor barrier mastic.
E. Remove and dispose select sections of brick/block with vapor barrier mastic to
facilitate the installation of twelve (12) elevated window openings along the
South side and East/West ends of the building.
F. Remove and dispose of two (2) original wood-framed windows on the East end
of the building (existing electrical panels to be removed from that area prior to
abatement to provide safe access to the windows).
G. Remove and dispose of transite panels associated with the elevator room on the
roof of the building.
H. OSHA required air monitoring of Sitek Omni employees in regulated areas.
1780 Roughneck Drive, Humble TX 77338
Office Phone: 281-812-1461
+3i, k Omni
Prewinew Lit
CLARIFICATIONS/QUALIFICATIONS:
A. Sitek will use the trucking company and licensed landfill of our choice for
demolition and construction debris.
B. The testing, removal, handling, transporting and disposing of any unforeseen
hazardous waste materials (excluding identified asbestos containing materials)
are excluded from this scope of work.
C. Dump fees for all waste generated are included in pricing.
D. The following potential work items are excluded from this proposal:
> Shoring;
> Removal of roofing materials;
> Provide temporary cones, signage and fencing as temporarily needed during
working hours to safely complete the exterior work along city streets;
> Site maintenance after Sitek demobilizes from the site;
> Field lay-outs of saw-cut openings for new window opening;
> Security of building (boarding of window openings);
> Installation of new panel support brackets into existing vapor barrier mastic;
> Payment and performance bonds.
Facility Owner Responsibilities:
A. Provide site access, electrical power supply, water supply, parking for Sitek
employees and Sitek-supplied waste trucks/dumpsters for the work.
B. Provide a third-party Industrial Hygiene firm (Total Safety) for the purposes of
providing daily area air monitoring, final air clearances (PCM) and final report.
C. Replacement of all materials abated and demolished by Sitek.
II. PROCEDURES
Sitek Omni Services, LLC is a certified asbestos abatement (TDSHS License #80-
1070) and demolition contractor in Texas. All local, state (TDSHS) and federal
(NESHAPS, EPA and OSHA) codes regarding asbestos abatement and elevated
selective demolition shall be strictly implemented.
III. DISPOSAL
All asbestos containing material will be handled, transported and disposed of as per
federal, state and local regulations to an EPA approved landfill. Sitek Omni will
prepare waste manifest based on facility ownership entity information provided by
client.
IV. SCHEDULE
Sitek Omni proposes completion of listed abatement scope of work within a single
job site mobilization, consisting of approximately twelve (12) shifts, working
Monday—Friday, up to 10 hours per shift(7am—5:30pm).
Page 2 of 3
Sitek#20-04-01
leijitseit limrsl
�..i.ow
lit
V. PRICING
Lump sum price per listed abatement scope of work: $ 42,400.00
Pricing provided is valid for 90 calendar days from the date of this proposal.
VI. INSURANCE
Sitek Omni carries occurrence-type General Liability coverage totaling $3 million
per occurrence and $3 million general aggregate with an additional $10 million
umbrella. Sitek also carries a $2 million Pollution Liability policy. Sitek Omni's
program also includes Auto Liability, Employer's Liability and statutory limits for
Worker's Compensation. Liability and workers compensation policies are provided
through Starr Indemnity & Liability Company and Federal Insurance Company and
are AM Best Rated A+, XIV.
Floyd, we wish to thank you for your consideration and look forward to working with
you on this project. Should this proposal meet with your approval, please sign below,
and return via email or fax as a notice to proceed with the work.
Sincerely,
JW
Jon K. Woodard
Vice President—Sales
DWard@totalsafety.com
Note: Please sign as an authorization to proceed with the listed selective asbestos
abatement (vapor barrier mastic, windows and rooftop transite panels) on exterior
surfaces to facilitate planned renovations at the former Port Arthur News Building
located at 549 4th Street in Port Arthur, Texas and return via fax or email.
Name Date
Title
Page 3 of 3
Sitek#20-04-01