Loading...
HomeMy WebLinkAboutPR 11937:WATERLINE REHAB MEMORANDUM CITY OF PORT ARTHUR UTILITY OPERATIONS DEPARTMENT TO: FROM: DATE: SUBJECT: Steve Fitzgibbons, City Manager Daniel Shepherd, Director of Utility Operations September 23, 2002 Proposed Resolution No. 11937 COMMENTS RECOMMENDATION: I recommend that the City Council approve Proposed Resolution No. 11937 executing a construction contract with Allco, Inc., of Beaumont for $4,158,410.90 for water line rehabilitation. BACKGROUND: This water line rehabilitation project is part of the city-wide water system improvements plan. it includes the replacement of approximately 93,500 fee of the City's water lines with the greatest break frequency. On August 28, 2002, the City received four (4) sealed bids for this project. Allco, Inc., of Beaumont submitted the lowest bid for the project. Arceneaux & Gates Consulting Engineers have reviewed the bids and recommend that the City award to Alice, Inc. of Beaumont. The bid results are as follows: Contractor Mason Construction Orange, Texas Total Bid $4,591,491.85 AIlco, Inc. Beaumont, Texas $4,158,410.90 Excavators & Constructors Port Arthur, Texas $5,210,548.50 Brystar Contracting Beaumont, Texas $5,428,425.00 "Remember, we are here to serve the citizens of Port./lrlhur" Memo to Steve Fitzgibbons Page 2 of 2 BUDGET/FISCAL EFFECT: Funds for the Water Improvement Projects are budgeted in the City Water & Sewer CIP Fund No. 427- 1626-532.85-00. This project is budgeted at $4,500,000. The low bid of$4,158,410.90 is 7.5% below the budgeted amount. The Engineer's Estimate was approximately $5.4 million. Various alternates for material substitution were bid in order to determine the lowest and best possibility. Alternate F was selected due to the considerable savings ($209,115.50). Alternate F substitutes PVC pipe in place of HDPE pipe in one location along S.H. 87 toward Sabine. HDPE was specified in the base bid because in the long open area along S. H. 87, it was expected that HDPE would be less expensive. However PVC pipe was bid less by all contractors. PVC pipe is a good material selection in this application. Please note that Allco's bid was lo,vest in each alternate as well as the base bid. STAFF/EMPLOYEE EFFECT: City staffwill monitor this contract. SUMMARY: I recommend that the City Council approve Proposed Resolution No. 11937 authorizing execution of a construction contract with Allco, Inc. /ld "Remember we are here to serve the citizens of RESOLUTION NO. A RESOLUTION AWARDING A CONTRACT AND AUTHORIZING THE EXECUTION OF SAID CONTRACT IN THE AMOUNT OF $4,158,410.90 FOR WATER LINE REHABILITATION BETWEEN THE CITY OF PORT ARTHUR AND ALLCO, INC., OF BEAUMONT, TEXAS. ACCOUNT NO. 427-1626-532.85-00, PROJECT NO. 427005. P.R. No. 11937 09-18-02 DS/Id WHEREAS, the City of Port Arthur advertised and received bids from contractors for water main improvements; now therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT, the City Council of the City of Port Arthur hereby awards the contract for water main improvements with Alternate "F" to the lowest bidder to-wit: Allco, Inc., of Beaumont, Texas; and, THAT the City Manager of the City of Port Arthur is hereby authorized to execute on behalf of the City of Port Arthur a contract between the City of Port Arthur and Allco, Inc., in the amount of $4,158,410.90 a copy attached hereto as Exhibit "A"; and, THAT a copy of engineer's recommendation for awarding the contract to the lowest responsible bidder is attached hereto as Exhibit" B"; and, THAT the said contract is an exact duplicate of a City Standard Form contract except for the changes (if any) shown in the Certificate of Standard for Contract, a copy of which is attached hereto as Exhibit "C", and said changes are hereby approved; and, THAT a copy of the caption of this Resolution be spread upon the Minutes of the City Council. READ, ADOPTED AND APPROVED THIS day of ,2002 at a Regular Meeting of the City Council of the City of Port Arthur, Texas, by the following vote: AYES: Mayor Councilmembers P.R. No. 11937 09-18-02 DS/Id Page 2 of 2 NOES: " ATTEST: Evangeline Green City Secretary APPROVED: Steve Fitzgibbons City Manager APPROVED AS TO FORM: Mark Sokolow City Attorney APPROVED FOR ADMINISTRATION: Shep el'i'~ ~ ' Director of Utility Operations D~S TO AVAILABILITY OF FUNDS: Rebecca Underhill Director of Finance Oscar Ortiz Mayor P. R. No. 11937 Page 1 of I Exhibit A is available for review in the City Secretary's Office. ARCENEAUX & GATES Consulting Engineers, Inc. Engineers · Surveyors · Planners I;~hibit "g~ P. R. NO. 11937 Page 1 of 4 September 4, 2002 'Mr. Dan Shepherd Director of Water Utilities CITY OF PORT ARTHUR PO Box 1089 Port Arthur, Texas 77641-1089 RE: RECOMMENDATION OF AWARD OF CONTRACT City Of Port Arthur Water Line Rehabilitation Job No. 01-CPA-230 [Construction Phase No. 01-CPA-231] Dear Mr. Shepherd: On August 28, 2002 the City of Port Arthur received four (4) sealed bids for the construction project named above. Representatives of our firm and the City conducted the mandatory Pre-Bid meeting for this project. All firms that submitted bids were confirmed present at the Pre-Bid meeting. The bids were opened in our presence on August 28, 2002, and the results read aloud in the public bid opening. AIIco, Inc. of Beaumont, Texas, submitted the lowest Total Amount Bid. The Total Amount Bid, without Alternates was $4,367,526.40. There were a total of eight Alternates provided on the bid. Each of the eight alternates involved substitution of material only in order to obtain the greatest savings for the City of Port Arthur. The bids were analyzed for all possible combinations of alternates and it was found that AIIco, Inc. submitted the lowest, responsive Bid for all possible combinations (Total Amount Bid plus any combination of Alternates and/or Substitutions). A copy of the certified Bid Tabulation is enclosed for your information. We have reviewed the bids along with the alternates and determined that acceptance of Alternate "F" will provide the best value to the City. Alternate "F" substitutes C900 Polyvinyl Chloride (PVC) pipe for High-Density Polyethylene pipe (HDPE), including the associated valves and fittings, and will result in a $209,115.50 deduction in the Total Amount Bid by the Iow Bidder. The following is a summary of the Total Amount Bid including Alternate "F": AIIco, Inc.: $4,158,410.90 Mason Construction: $4,591,491.85 Excavators & Constructors: $5,210,548.50 Brystar Contracting: $5,428,425.00 One Turtle Creek Square 3501 Turtle Creek Ddve, Suite 102 Port Arthur, Texas 77642 (409) 724~7888 FAX (409) 724-1447 ~hibit ~13~ P, R. No. 11937 Page 2 of 4 Mr. Dan Shepherd City of Port Arthur September 4, 2002 Page Two We conducted a brief verification of the qualification statement prepared by the Iow bidder and find no discrepancies in the information submitted. We therefore recommend that the City award this contract to AIIco, Inc., the lowest responsive bidder on the basis of the Total Amount Bid including Alternate "F" in the amount of $4,158,410.90. Should you have any questions or require additional information, please contact our office. Very truly yours, ARCENEAUX & GATES CONSULTING ENGINEERS, INC. Presidenf/CEO Enclosure: Bid Tabulation I;;~hibit ~[l~ P. R. No. 11937 Page 3 of 4 B~D TABULATION For The Water Line Rehabilitation City of Port Arthur Job No. 01-CPA-230 BIDE OPENED: August 28, 2002 at 3:10 P.M. I~xhibit "B," P. R. No. 11937 Page 4 of 4 Total Water Line Items $ 4,312,739,40 $ 5,563,725.00 $ 4,771,682.00 $ 5,478,486.50 Total Supplemental Items $ 54,787.00 $ 71,870.00 $ 56,759.85 $ 55,662.00 Total Amount Bid $ 4,367,526.40 $ 5,635,695.00 $ 4,828,441.85 $ 5,534,t48.50 Total Amount Bid With Alternate "F" $ 4,t58,410.90 $ 5,428,425.00 $ 4,591,49t.86 $ 5,210,548.50 ~it "C" P. I~. No. 11937 Page 1 of 3 (City of Port Arthur) (Law Department) (Required Form) (7/8~88) (10/5/89) (3/15/90) (9-8-94) (p.2 Revised 9/18/90 I certify that the contract (hereinafter called "said contract") affixed to the attached Proposed City Council Resolution No 11937 is an exact dupLLcate of an applicable standard form contract (the title of which is shown below) previously approved by the Law department and adopted as a standard form by City Council Resolution, except for the blanks that have been filled in with all necessary information and except for the changes described be[ow. The title of the applicable standard form contract is: [ ] Federally Funded Construction Contract, Revised 1/5/88, 7/89, 8/89; 4/28/94 [X] Non-Federally Funded Construction Contract, Revised 1/5/88, 7/89, 8/89; 4/28/94 [ ] Federal - Professional Services - Engineering Contract, Revised 1/5/88, 5/89 (§10) 7/89/(§8); 10/89; 2/91 (§8) [ ] Non-Federal - Professional Services - Engineering Contract, Revised 1/5/88, 5/89(§10), 7/89(§8), 10/89; 2/91(§8) [ ] CDBG - Professional Services - Engineering Contract, Revised 1/5/88, 5/89 (§10), 7/89(§8), 10/89; 2/91 (§8) [ ] Federal - Professional Services - Non-Engineering (Consultant) Contract, Revised 1/5/88, 5/89 (§10), 7/89 (§8); 10/89; 2/91 (§8) [ ] Non-Federal - Professional Services - Non-EngineerLng (Consultant) Contract, Revised 1/5/88, 5/89 (§10), 7/89 (§8); 10/89; 2/91 (§8) [ ] CDBG - Professional servLces - Non-Engineering (Consultant) Contract, Revised 1/5/88, 5/89 (§10), 7/89 (§8); 10/89; 2/91 (§8) [ ] Other Standard Form Contract, described as follows: The changes are as follows: (Put an "X' in the appropriate [ ]) [X] None. [ ] The following described provisions at the indLcated page, section, etc. of the standard form have been deleted from said contract: Page 1 of 3 (p.2 Revised 9/18/90) (Certificate of Standard Form Contract, page 2) DElEtIONS Exhibit "C" P. R. No. 11937 Page 2 of 3 Page Number Where Deleted Provision Is Found On Standard Form None. Section or Paragraph No. and Caption Which Contains Provision Deleted From Form Subsection or Subparagraph No. and Caption Which Contains Provision Deleted From Form Description of Provision DeJeted [ ] The foLLowing described provisions at the indicated page, section, etc. of the standard form have been altered, modified, replaced or otherwise changed: ALTERATIONS, MO~IFI~ATIOtV$, REP/ACEMEItfT$, ETC. Sub § or Sub ¶ No. Page No. § or ¶ No. E Caption E Caption Description Where of of of Provision Found Standard Form which Standard Form Provision on Contains Provision which in Standard Form Contains Provision Standard Form Page § Et caption sub § ~ caption, etc. of said contract which contains altered, etc. provision; Et Description of Alteration etc. No Changes Page 2 of 3 p.3 Revised 9/18/90) (Certificate of Standard Form Contract, page 3) Exhibit "C" P. R. No. 11937 Page 3 of 3 [ ] The following provisions have been added to Said Contract: No Additions Page, Section and Caption Subsection and Caption, etc. of Said Contract Which Contains the Added Provision and OescriptJan Thereof I further certify that said attached proposed City Council Resolution contains the following provision: "That said contract is an exact duplicate of a City Standard Form Contract except for the changes described in the Certificate of Standard Form Contract, a copy of which is attached hereto as Exhibit "A" and is hereby incorporated by reference, and said changes are hereby approved." I understand that this certificate will be reLied on by the Law Department in reviewing and approving (or rejecting) as to form and by the City Council in reviewing and adopting (or rejecting) said Resolution and Contract. Signed this ~'~/~ day of ~'~. , 2002. ~'~epartment Head~"~- J Page 3 of 3