Loading...
HomeMy WebLinkAboutPR 21510: PORT ARTHUR TRANSIT'S MAINTENANCE EQUIPMENT PURCHASE City of Port Arthur Transit Department Memorandum To: Ron Burton,City Manager From: Ivan Mitchell,Transit Director Date: August 10,2020 Re: P.R.21510—Port Arthur Transit's Maintenance Equipment Purchase Nature of Request:Authorize the City Manager to enter into a contract with Reeder Distributor,Inc. of Fort Worth,Texas to purchase a mobile column lift,in-ground lift,catwalk,and air compressor for Port Arthur Transit's(PAT)new maintenance building. Background: In 2020,per Resolution No.20-042 the City Council authorized the City Manager to enter into a contract with Construction Managers of Southeast Texas(CMOST)to construct PAT's new maintenance facility and electric bus charging infrastructure. Per Resolution No. 20-080 the City Manager was authorized to execute change order No. 1 with CMOST. Change order No. 1 consisted of value-engineering(VE)by PAT and its engineer(Huitt-Zollars)that consolidated project cost resulting in a$154,199.64 reduction. The column lift is needed equipment, but was removed while PAT pursued alternate funding sources to purchase it. In February 2020,PAT applied to the 5307 Fleet Replacement Program which provides funds to maintain capital assets in a state of good repair. PAT was one of ten(10)Texas agencies to be selected and was awarded funding in the amount of$137,460.00. The funds are authorized to purchase the column lift as well as other equipment for the new maintenance building. The in-ground lift,catwalk,and air compressor purchase was authorized in Resolution No.20-042. With the award of additional 5307 funds in the amount of$137,460 for shop equipment,PAT will remove these three(3)items and purchase as a separate procurement using the recently awarded $137,460.00 as well as other existing funding sources. Recommendation: It is recommended Proposed Resolution No. 21510 be approved. This resolution would authorize the City Manager to enter into a contract with Reeder Distributor,Inc.of Fort Worth, Texas to purchase a mobile column lift,in-ground lift,catwalk,and air compressor for Port Arthur Transit's(PAT)new maintenance building in the amount of$177,057.97. Budgetary/Fiscal Effect: Funding to pay for the equipment is funded by a Federal Transit Administration(FTA)grant and state transportation credits in account number 401-1509-561-82-00. P.R. No. 21510 8/10/2020 IM RESOLUTION NO. A RESOLUTION AUTHORIZING THE PURCHASE OF A MOBILE COLUMN LIFT, IN-GROUND LIFT, CATWALK, AND AIR COMPRESSOR FOR PORT ARTHUR TRANSIT THROUGH BUYBOARD CONTRACT #551-17 WITH REEDER DISTRIBUTORS, INC. OF FORTH WORTH, TEXAS IN THE AMOUNT OF $177,057.97; FUNDS AVAILABLE IN ACCOUNT 401-1509-561.82-00. WHEREAS, pursuant to Resolution No. 20-042, the City Council authorized the City Manager to enter into a contract with Construction Managers of Southeast Texas (CMOST) to construct PAT's new maintenance facility and electric bus charging infrastructure; and, WHERAS, pursuant to Resolution No. 20-080, the City Manager was authorized to execute Change Order No. 1 with CMOST which resulted in a savings of$154,199.64 and included the removal of some shop equipment; and, WHEREAS, Port Arthur Transit (PAT) has been allotted new 5307 Fleet Replacement Program funds in the amount of$137,460.00 to supplement purchasing shop equipment that was removed in Change Order No. 1; and, WHEREAS, PAT obtained quotes from qualified vendors to purchase a mobile column lift, in-ground lift, catwalk, and air compressor as delineated in Exhibit"A"; and, WHEREAS, Reeder Distributors, Inc. submitted the lowest quote with their BuyBoard Contract#551-17 price; and, WHEREAS, pursuant to Resolution No. 02-341, the City entered into an interlocal agreement for cooperative purchasing with the Buyboard Cooperative Purchasing Program ("Buyboard"). NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT, the facts and opinions in the preamble are true and correct. THAT, the City Council authorizes the City Manager to purchase a mobile column lift, in-ground lift, catwalk, and air compressor for Port Arthur Transit's (PAT) new maintenance building from Reeder Distributors, Inc. of Fort Worth, Texas through BuyBoard in the amount of $177,057.97. P.R. No. 21510 8/10/2020 IM THAT, a copy of the caption of this Resolution be spread upon the Minutes of the City Council. READ,ADOPTED AND APPROVED this day of A.D. 2020 at a Regular Meeting of the City of Port Arthur, Texas by the following vote: AYES: Mayor: Councilmembers: NOES: Thurman "Bill" Bartie, Mayor ATTEST: Sherri Bellard, City Secretary OVED AS TO FORM: Val Tizeno, ity Attorney APPROVED FOR ADMINISTRATION: APPROVED AS TO AVAILABILITY OF FUNDS: 401-1509-561.82-00 CA Ron Burton anY d Dan 1 City Manager Interim Director of Finance '6 - L& Clifton Williams, CPPB Ivan Mitchell Purchasing Manger Transit Director P.R. No. 21510 8/10/2020 IM Exhibit "A" Quote Tabulation - Port Arthur Transit Maintenance Equipment VENDOR COLUMN LIFT IN-GROUND LIFT AIR COMPRESSOR CATWALK Reeder Distributors, Inc. $ 39,400.00 $ 110,611.00 $ 9,568.97 $ 17,478.00 Gray Manufacturing Company, Inc. $ 40,767.00 N/A N/A N/A Steril-Koni $ 44,119.78 $ 130,768.67 N/A N/A Rotary Lift $ 41,518.76 N/A N/A N/A Heavy Duty Lift Equipment, Inc. $46,300.00 $ 127,440.00 N/A N/A Texas Lift Service N/A $ 134,573.35 N/A N/A Arnold Oil Equipment Company N/A $ 172,155.75 N/A N/A Alcode Plumbing, LLC N/A N/A $ 16,400.00 N/A J.A.M. Breentag N/A N/A $ 10,200.56 $ 26,176.17 Beacon Equipment N/A N/A $ 10,188.00 $ 19,48C.00 * Please note we are estimating the purchase of miscellaneous equipment at a cost of around $25,000.00. ** The Reeder Distributors, Inc. price quotes are from the Texas Buyboard. P.R. No. 21510 8/10/2020 IM Exhibit "B" At EDER QUOTE TRIBUTOR5, INC. Sales,Service,Maintenance,Inspections,Installations,&Warranty Work Prepared For: Equipment Division City of Port Arthur-Transit 5450 Wilbarger St. Ivan Mitchell Fort Worth,TX 76119 344 Procter St. 817-429-5957 Port Arthur,TX 77640 www.ReederDistributors.com 409-983-8876 Quote Valid for 30 days L/F I Customer Reeder Sales Representative Mobile Phone Emaili Date Number fScott Clinch 682-429-1075 sclinch®rdinc.us 1 7/31/20 ZiTY PART# DESCRIPTION EACH LINE TOTAL AIR COMPRESSOR 1 SAY-92012FP Saylor Beall 20HP Air Compressor with 120 gal.Tank (460v 3ph). 5 9,568.97 $ 9,568.97 • LOCAL SUPPORT AND SERVICE PROVIDED BY: REEDER DISTRIBUTORS,INC.-SCOTT CLINCH REEDER DISTRIBUTORS,INC.-BUY BOARD NATIONAL CO.OP QUOTE: AUTOMOTIVE PARTS,FLUIDS,MAINTENANCE AND EQUIPMENT PROPOSAL#551-17 1 __. SUBTOTAL $ 9,568.97 $ 197.79 5 years Financing available.Si Buyout Lease to Own. Zero down,1st and last FREIGHT $ 239.22 4 years payments in advance. Payments based on subtotal,and do not include sales 8.25%SALES TAX NOT INCLUDED tax or freight. WAC.Other financing options are available. $ 308.12 3 years TOTAL INVESTMENT, $ 9,568.97 Accepted By: PO# -- Date: „, 4x THANK YOU FOR YOUR BUSINESS! ,;. • QUOTE i DI 7RlB R , IN . Sales,Service,Maintenance,Inspections,Installations,&Warranty Work Prepared For: Equipment Division City of Port Arthur-Transit 5,450 Wilbarger St. Ivan Mitchell Fort Worth,TX 76119 344 Procter St. 817-429-5957 Port Arthur,TX 77640 www.ReederDistri butors.corn 409-983-8876 Quote Valid for 30 days OF Customer Reeder Sales Representative Mobile Phone Email . Date Number Scott Clinch 682-429-1075 sclinch@rdinc.us 7/31/20 riTY PART# DESCRIPTION EACH LINE TOTAL LUBE PIT EQUIPMENT CATWALK 12 CT-96 Combination Track,96 tong. $ 200.00 $ 2,400.00 1 WP45-M-NS Work Platform,45',Metal Deck,No Stairs Catwalk Work Platform w/ handrails 451L $ 3,627.00 $ 3,627.00 2 OFR-4H-ABS Oil Fiter Dispensing Rack 4-tier(ceiling mount) $ 500.00 $ 1,000.00 2 TB-ABC-NT Tool Boards with Frame $ 345.00 $ 690.00 2 FS-AA-A Tech.Stool Stool Aluminum $ 238.00 $ 476.00 1 STA4-M405 Stair Assembly 40.5 w/handrails 4-Steps,5-Risers $ 595.00 S 595.00 5 DT-PVC Drip Tray,Polyvinyl Chloride Drip Catch Pan 81 $ 200.00 $ 1,000.00 PIT COVERS ft DRAIN PANS 8 4050/6000Y-A Pit Guards to fit a pit 44-8"long by 42-wide $ 310.00 $ 2,480.00 2 4050/3400Y Pit Guards to finish covering a pit 42"wide by 44-8"long $ 175.00 $ 350.00 10 No Step Sign Sign and hardware for pit covers $ 3.00 $ 30.00 1 LABOR Install S 100.00 $ 100.00 LOCAL SUPPORT AND SERVICE PROVIDED BY: REEDER DISTRIBUTORS,INC.-SCOTT CLINCH REEDER DISTRIBUTORS,INC.-BUY BOARD NATIONAL CO-OP QUOTE: AUTOMOTIVE PARTS,FLUIDS,MAINTENANCE AND EQUIPMENT PROPOSAL#551-17 1 LABOR LABOR,INSTALLATION OF GENERAL SHOP PIT EQUIPMENT $ 4,730.00 $ 4,730.00 SUBTOTAL $ 17,478.00 $ 361.27 5 years Financing available. $1 Buyout Lease to Own. Zero down,1st and last FREIGHT $ 436.95 4 years payments in advance. Payments based on subtotal,and do not include sales 8.25%SALES TAX NOT INCLUDED tax or freight. WAC. Other financing options are available. $ 562.79 3 years TOTAL INVESTMENT $ 17,478.00 Accepted By: P0,4 Date: THANK YOU FOR YOUR BUSINESS! 'Co `„ ros N.,:-.,... QUOTE TRIRUTORS; IN . Soles,Service,Maintenance,Inspections,Installations,h Warranty Work Prepared For: Equipment Division City of Port Arthur-Transit 5450 Wilbarger St. Josh Melling Fort Worth,TX 76119 344 Procter St. 817,429-5957 Port Arthur,TX 77640 www.ReederDistributors.com 409-983-8876 Quote Valid for 30 days L� Customer Number Reeder Sales Representative Mobile Phone Email Date Scott Clinch 682-429-1075 sclinch@rdinc.us 7/31/20 QTY PART# DESCRIPTION EACH LINE TOTAL 1 SK-ST1085-2FWA SET OF 4:STERTIL-KONI HEAVY DUTY MOBILE COLUMN LIFTS $ 38,900.00 $ 38,900.00 18,500 LBS.PER COLUMN=74,000 LBS.TOTAL LIFTING CAPACITY, 24 VOLTS DC BATTERY POWERED,COMPLETELY WIRELESS OPERATIONS, ADJUSTABLE FORKS, NEW"EBRIGHT CONTROL SYSTEM,CONTROL PANEL ON EACH COLUMN.ALI CERTIFIED! MADE IN USA! PRICE INCLUDES DELIVERY,SETUP AND TRAINING. LOCAL SUPPORT AND SERVICE PROVIDED BY: REEDER DISTRIBUTORS,INC.-SCOTT CLINCH REEDER DISTRIBUTORS,INC.-BUY BOARD NATIONAL CO-OP QUOTE: AUTOMOTIVE PARTS,FLUIDS,MAINTENANCE AND EQUIPMENT PROPOSAL#551-17 SUBTOTAL $ 38,900.00 $ 804.06 5 years Financing available.$1 Buyout Lease to Own. Zero down,1st and last FREIGHT $ 500.00 $ 972.50 4 years payments in advance. Payments based on subtotal,and do not include sales 8.25%SALES TAX NOT INCLUDED tax or freight. WAC. Other financing options are available. $ 1,252.58 3 years TOTAL INVESTMENT $ 39,400.00 Accepted By: P0# Date: THANK YOU FOR YOUR BUSINESS! FEDER QUOTE DI E1RIBU!C"..RS INC. Sales,Service,Maintenance,Inspections,Installations,&Warranty Work Prepared For: Equipment Division City of Port Arthur-Transit 5450 Wilbarger St. Ivan Mitchell Fort Worth,TX 76119 344 Procter St. 817-429-5957 Port Arthur,TX 776.40 www.ReederDistributors.com 409-983-8876 Quote Valid for 30 days LJF Customer Number Reeder Sales Representative Mobile Phone Email Date Scott Clinch 682-429-1075 sclinch@rdinc.us 8/9/20 QTY PART# DESCRIPTION EACH LINE TOTAL • SECTION 144500-VEHICLE LIFTS(ALL BUY AMERICA COMPLIANT) 1 SK-EC060-17 STERTIL-KONI ECO 60 IN-GROUND"SCISSOR STYLE HD VEHICLE UFT.60K CAPACITY $ 95,181.00 $ 95,181.00 1 SK-AS100-00 ECO ADAPTER STAND $ 1,100.00 $ 1,100.00 1 SK-RBV050-00 ECO WIRED REMOTE CONTROL FOR ECO 60 $ 2,830.00 $ 2,830.00 PRICE INCLUDES DELIVERY,SET UP,AND TRAINING. LOCAL SUPPORT AND SERVICE PROVIDED BY: REEDER DISTRIBUTORS,INC.-SCOTT CLINCH REEDER DISTRIBUTORS,INC.-BUY BOARD NATIONAL CO-OP QUOTE: AUTOMOTIVE PARTS,FLUIDS,MAINTENANCE AND EQUIPMENT PROPOSAL#551-17 1 INSTALLATION OF STERTIL-KONI LIFTS $ 10,000.00 5 10,000.00 SUBTOTAL $ 109,111.00 5 2,255.32 5 years Financing available.$1 Buyout Lease to Own. Zero down,1st and last FREIGHT $ 1,500.00 $ 2,727.78 4 years payments in advance. Payments based on subtotal,and do not include sales 8.25%SALES TAX NOT INCLUDED tax or freight. WAC. Other financing options are available. 5 3,513.37 3 years I TOTAL INVESTMENT $ 110,611.00 Accepted By: PO#-- Date: THANK YOU FOR YOUR BUSINESS!