Loading...
HomeMy WebLinkAboutPR 11976:ENGINEERING SERVICES MEMORANDUM CITY OF PORT ARTHUR UTILITY OPERATIONS DEPARTMENT TO: Steve Fitzgibbons, City Manager FROM: Daniel Shepherd, Director of Utility Operations DATE: October 17, 2002 SUBJECT: Proposed Resolution No. 11976 COMMENTS RECOMMENDATION: I recommend that the City Council approve Proposed Resolution No. 11976 authorizing a contract with Don S. Reichle & Associates, Inc., for engineering services not to exceed $126,700 related to rehabilitation of the Highway 365 and Thomas Boulevard elevated storage tanks. BACKGROUND: The Highway 365 elevated storage tank was built in 1951; the Thomas Boulevard tank was built in 1966. They were last rehabilitated in 1985 and 1991, respectively. Rehabilitation of these tanks is included in the current CIP budget. This contract will authorize Don S. Reichle & Associates, Inc., to perform the engineering services related to rehabilitation of the elevated storage tanks. These tanks have been cited by TNRCC as deficiencies requiring rehabilitation. Don S. Reichle & Associates, Inc. is a relatively small, but highly specialized, tank consttlting engineering firm located in Nederland. Don S. Reichle & Associates, Inc. has provided this type of work for the City of Port Arthur since the mid-1970's. They performed the last inspection and rehabilitation of these tanks. BUDGET/FISCAL EFFECT: The Highway 365 elevated storage tank rehabilitation project is budgeted in Account No. 419-1622-531.53- 00, Project 419202. The Thomas Boulevard elevated storage tank rehabilitation is budgeted in Account No. 427-1626-532.53-00, Project No. 427007. STAFF/EMPLOYEE EFFECT: City staff will monitor this contract. SUMMARY: I recommend that the City Council approve Proposed Resolution No. l 1976 authorizing execution o f an engineering contract with Don S. Reichle & Associates~ [nc. /Id "Remember we are here to serve the citizens of P.R. No. 11976 10/17/02-cs RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE A CONTRACT BETWEEN THE CITY OF PORT ARTHUR AND DON S. REICHLE & ASSOCIATES, INC., FOR ENGINEERING SERVICES, NOI TO EXCEED $126,700, RELATED TO REHABILITATION OF THE HIGHWAY 365 AND THE THOMAS BOULEVARD ELEVATED STORAGE TANKS. ACCOUNT NO. 419-1622-531.53~00, PROJECT NO. 419202 AND ACCOUNT NO. 427-1626-532.53-00 PROJECT NO. 427007. WHEREAS, the City of Port Arthur has received a proposal from DON S. REICHLE & ASSOCIATES, INC., for engineering services related to rehabilitation of the Highway 365 and Thomas Boulevard elevated storage tanks and evaluation for compliance with the cmvent TNRCC rules and regulations in the amount of $126,700; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT the engineering contract is attached hereto as Exhibit "A", with DON S. REICHLE & ASSOCIATES, INC. for engineering services related to the Highway 365 and Thomas Boulevard elevated storage tanks; and, THAT the total cost for this engineering service is of One hundred twenty-six thousand seven hundred and no/100 Dollars ($126,700); and, THAT the City Manager of the City of Port Arthur is hereby authorized and directed to execute on behalf of the City of Port Arthur, a contract (Exhibit "A") between the City of Port Arthur and DON S. REICHLE & ASSOCIATES, INC.; and, P. R. ]No. 11976 Page 2 of 2 THAT said Contract is an exact duplicate of a City Standard Form contract except for the changes described in the Certificate of Standard Form (Exhibit "B"), a copy of which is attached hereto, and said changes are approved; and, THAT a copy of the caption of this Resolution be spread upon the Minutes of the City Council. READ, ADOPTED AND APPROVED THIS day of Regular Meeting of the City Council of the City of Port Arthur, Texas, by the following vote: AYES: Mayor Councilmembers ,2002 at a NOES: ATTEST: Evangeline Green, City Secretary APPROVED: Steve Fitzgibbons, City Manager APPROVED AS TO FORM: Mark Sokolow. City Attorney Oscar Ortiz, Mayor ,,~-I~PROVED AS TO AVAILABILITY OF Rebecca Underhill, Director of Finance APPROVED FOR ADM1NISSRA~gN: __ '/-~¢'~niel Shepherd, Dir.~-T~or o f Utility Operations Exhibit "A" P, I~. No. 1197§ Page 1 of 1 Exhibit "A" is available for review in the City Secretary's office. (City of Port Arthur) (Law Department) (Required Form) (718188) (1015189) (3/15/90) (9-8-94} {p.2 Revised 9/18/90) P.R. No. 11976 Page 1 of 3 I certify that the contract (hereinafter catLed "said contract") affixed to the attached Proposed City Councit ResoLution No 11976 is an exact dupticate of an appticabte standard form contract (the due of which is shown betow) previously approved by the Law.department and adopted as a standard form by City Council. Resotution, except for the btanks that have been fried in with att necessary information and except for the changes described betow. The title of the applicable standard form contract is: [ ] FederaLLy Funded Construction Contract, Revised 1/5/88, 7/89, 8/89; 4/28/94 [ ] Non-FederaLLy Funded Construction Contract, Revised 1/5/88, 7/89, 8/89; 4/28/94 [ ]Federat - Professional Services - Engineering Contract, Revised 1/5/88, 5/89 (§10) 7/89/(§8); 10/89; 2/91 (§8) tX] Non-FederaL- Professional Services - Engineering Contract, Revised 1/5/88, 5/89(§10), 7/89(§8), 10/89; 2/91(§8) [ ] CDBG -Professionat Services - Engineering Contract, Revised 1/5/88, 5/89 (§10), 7/89(§8), 10189; 2/91 (§8) [ ] Federal -Professionat Services - Non-Engineering (Consuttant) Contract, Revised 1/5/88, 5/89 (§10), 7/89 (§8); 10/89; 2/91 (§8) [ ] Non-FederaL - Professionat Services - Non-Engineering (ConsuLtant) Contract, Revised 1/5/88, 5/89 (§10), 7/89 (§8); 10/89; 2/91 (§8) [ ] CDBG -Professionat services - Non-Engineering (Consuttant) Contract, Revised 1/5/88, 5/89 (§10), 7/89 (§8); 10/89; 2/91 (§8) [ ] Other Standard Form Contract, described as follows: The changes are as follows: (Put an "X" in the appropriate [ ]) [ ] None. [X] The foLLowing described provisions at the indicated page, section, etc. of the standard form have been deleted from said contract: Page 1 of 3 (p.2 Revised 9/18/90) (Certificate of Standard Form Contract, page lii hibit "iii" P. R. No. 1'1976 Page 2 of 3 Page Number Where Deleted Provision Is Found On Standard Form Section or Paragraph No. and Caption Which Contains Provision Deleted From Form Subsection or Subparagraph No. and Caption Which Contains Provision Deleted From Form Description of Provision Deleted Page 2 Preliminary Phase Items 1, 3, 4, 5 Basic Services Items 1-7 Page 2 Desitin Phase Basic Services Page 3 Construction Phase items 1-11 Basic Services [X] The following described provisions at the indicated page, section, etc. of the standard form have been altered, modified, replaced or otherwise changed: Sub § or Sub ¶ No. Page No. § or ¶ No. & Caption & Caption Description Where of of of Provision Found Standard Form which Standard Form Provision on Contains Provision which in ~Standard Form Contains Provision Standard Form Page § E caption sub § E caption, etc. of said contract which contains altered, etc. provision; E Description of Alteration etc. Page 6 Compensation and method of payment A. Compensation Paragraph 2 "It is agreed that totaL." Including subcontracted engineering services (Inctuding pretiminary phase onty) Page 2 of 3 E l ibit "§" P. R. No. tt97G Page 3 of 3 p.3 Revised 9/18/90) (Certificate of Standard Form Contract, page 3) [ ] The following provisions have been added to Said Contract: Page, Seclio# aad £aplion Suhsetlioa and CaplJo#, otc, of Said No Additions I further certify that said attached proposed City Council Resolution contains the following provision: "That said contract is an exact duplicate of a City Standard Form Contract except for the changes described in the Certificate of Standard Form Contract, a copy of which is attached hereto as Exhibit "A" and is hereby incorporated by reference, and said changes are hereby approved." I understand that this certificate wiLL be relied on by the Law Department in reviewing and approving (or rejecting) as to form and by the City Coundt in reviewing and adopting (or rejecting) said Resolution and Contract. Signedthis Z"D' dayof _//~/..,~/,,.-.~ ,2002.. Page 3 of 3