Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
(5) Pipebursting Summary
Pipe Bursting Summary Water Utilities Department Wastewater Conveyance Division Donnie Stanton 1 Status Report Location/Area # of feet run # of taps installed # of manholes installed Sabine Pass 3,058 10 3 Dequeen 2,540 64 8 Jade 1,000 14 2 Lakeshore 2,420 65 1 Gulfway 400 5 0 Dryden 1,200 17 2 Total 10,618 175 16 2 UPCOMING PROJECTS In 3 months S. 12th Ave. 400’ S. 13th Ave. 400’ Hwy 87, from S. 11th Ave. west 1,500’ Total 3 Month Goal ~2,300’ In 6 months Tremont, Hwy 87 to S. 11th Ave. 500’ Pearl, Hwy 87 to S. 14th Ave. 2,200’ Total 6 Month Goal ~2,700’ Total Goal ~5,000’ 3