Loading...
HomeMy WebLinkAbout(5) Pipebursting SummaryPipe Bursting Summary Water Utilities Department Wastewater Conveyance Division Donnie Stanton 1 Status Report Location/Area # of feet run # of taps installed # of manholes installed Sabine Pass 3,058 10 3 Dequeen 2,540 64 8 Jade 1,000 14 2 Lakeshore 2,420 65 1 Gulfway 400 5 0 Dryden 1,200 17 2 Total 10,618 175 16 2 UPCOMING PROJECTS In 3 months S. 12th Ave. 400’ S. 13th Ave. 400’ Hwy 87, from S. 11th Ave. west 1,500’ Total 3 Month Goal ~2,300’ In 6 months Tremont, Hwy 87 to S. 11th Ave. 500’ Pearl, Hwy 87 to S. 14th Ave. 2,200’ Total 6 Month Goal ~2,700’ Total Goal ~5,000’ 3