HomeMy WebLinkAboutPR 21551: RATIFICATION OF EMERGENCY REPAIRS TO WATER MAIN ON WEST PORT ARTHUR ROAD , , ,._ _, 4 City of 41 or trt Teras INTEROFFICE MEMORANDUM Date: October 6, 2020 To: The Honorable Mayor and City Council Through: Ronald Burton, City Manager From: Donnie Stanton, Interim Director of Utilities RE: PR 21551 - Ratification of Emergency Repairs to Water Main on West Port Arthur Road Introduction: The intent of this Agenda Item is to seek City Council's ratification for City Manager's emergency approval for repair of the road way on West Port Arthur Road. Due to a water leak under West Port Arthur Road (Spur 93), City Staff had to excavate under the State Roadway to make repairs. Brystar Contracting, Inc. was hired to assist the Water Distribution Division in the replacement of a road due to TXDOT requirement for the state roadway to be replaced by a State Certified Contractor. Crabtree Barricades was hired due to the State of Texas requirement for a State Certified Contractor for a barricade system. City Staff made the actual repair of the water leak and also prepared the site for the state certified contractor to replace the road. Background: On August 31, 2020,the water main on West Port Arthur Road ruptured. Emergency approval was given by the City Manager to hire a contractor to assist in repairs of the road. Brystar Contacting, Inc. and Crabtree Barricade, both of Beaumont, Texas, were hired for the barricading of the area and for the road repair. Budget Impact: The budgetary impact for this road way repair is to be $85,000.00. The cost for the Barricade Rental was $11,300.00. The total amount spent on contractors for this repair was $96,300.00. This repair will come from account no. 410-1253-532.36-00, Streets. Recommendation: It is recommended that City Council approve PR 21551, ratifying the emergency repairs to the road on West Port Arthur Road. "Remember,we are here to serve the Citizens of Port Arthur" P.R. No.21551 10/6/20 bw Page 1 of 2 RESOLUTION NO. A RESOLUTION REQUESTING THAT CITY COUNCIL RATIFY THE CITY MANAGER'S DECISION FOR THE EMERGENCY REPAIRS TO THE WATER TRANSMISSION MAIN ON WEST PORT ARTHUR ROAD FOR UTILITIES OPERATIONS DEPARTMENT BY BRYSTAR CONTRACTING, INC. FOR $85,000.00 AND CRABTREE BARRICADES FOR $11,300.00, BOTH COMPANIES OF BEAUMONT, TEXAS, WITH A TOTAL BUDGETARY IMPACT OF $96,300.00, ACCT NO. 410- 1253-532.36-00, STREETS. WHEREAS, on August 31, 2020, a rupture was discovered in a water transmission main on West Port Arthur Road; and, WHEREAS,this water transmission main was repaired by City Forces; and, WHEREAS,Texas Department of Transportation(TXDOT)required that a State Certified Contractor be used for both barricading the work area as well as replacing the road; and, WHEREAS, emergency approval was authorized by the City Manager to hire Brystar Contracting and Crabtree Barricades for the necessary road work and barricade system; and, WHEREAS, pursuant to Section 252.022(a)(2) this purchase is authorized because of a public calamity that requires the immediate appropriation of money to relieve the necessity of the municipality's residents or to preserve the property of the municipality; and, WHEREAS, it is further authorized pursuant to Section 252.022(a)(3) because of unforeseen damage to public machinery, equipment, or other property; and, WHEREAS, the maximum total budgetary impact for the repair of the water line is $96,300: Brystar Contracting $85,000.00; Crabtree Barricades $11,300.00; and, WHEREAS,City Manager approved proceeding with these repairs on an emergency basis (Exhibit A). NOW THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: P. R. No.21551 10/6/20 Page 2 of 2 THAT, in order to protect the health and safety of our citizens, the City Council hereby approves and ratifies the expense of the emergency repairs to the Water Transmission Main on West Port Arthur Road with a total budgetary impact of$96,300.00; and, THAT, a copy of the caption of this resolution be spread upon the minutes of the City Council. READ, ADOPTED, AND APPROVED THIS day of 2020 at a Regular Meeting of the City Council of the City of Port Arthur, Texas, by the following vote: AYES: Mayor Councilmembers: NOES: Thurman"Bill" Bartie Mayor ATTEST: APPROVED AS TO FORM: fiat, bLyi3 Sherri Bellard Valecia T zeno ,`L City Secretary City Attorney APPROVED: FOR ADMINISTRATION: APPROVED AS TO AVAILABILITY OF FUNDS: Ronald Burton Kandy Daniel City Manager Interim Director of Finance &A-1,/.1LL Donnie Stanton Clifton Williams, CPPB Interim Director of Utilities Purchasing Manager EXHIBIT "A" (Emergency Authorization) Ciry of \ l \\ ) ort rthu�- Teras INTEROFFICE MEMORANDUM Date: August 31, 2020 To: Ron Burton, City Manager From: Donnie Stanton, Interim Director of Utilities RE: Approval for Emergency Repair to 6" Water Main on West Port Arthur Road. A leak has been discovered on the 6" water main on West Port Arthur Road (Spur 93 — State Hwy). Immediate repair is necessary due to risk of damage to the Highway and danger to traffic. The repair will require a State Approved barricade system to be put in place by a State Certified Contractor (Crabtree Barricade). City Forces will perform the repair to the water main. The section of road will also have to be put back by a State Certified Contractor(Brystar). Emergency approval is requested of the City Manager to hire necessary contractors to comply with TXDOT State Standards. Original estimates are in excess of $50,000 (Acct. #410-1253-532.35-00). A more accurate estimate will soon be available. A proposed resolution will be presented to City Council for ratification. I, Ron Burton, hereby,approve the emergency repair of the 6" water main on West Port Arthur Road. �,_ 417i0lirr Ron Burton Scott Moore City Manager Assistant City Manager "Remember,we are here to serve the Citizens of Port Arthur" EXHIBIT "B" (Brystar Invoice#5600) Invoice OR R 8385 Chemical Road Beaumont, TX 77705 Invoice Number CONTRACTING, INC. Phone: (409)842-6768 5600 Fax: (409)842-1215 Invoice Date f 10/5/2020 Bill To: CITY OF PORT ARTHUR Re: EMER REPAIR 6" WATER MAIN P.O. BOX 1089 WEST PORT ARTHUR ROAD PORT ARTHUR, TX 77641-1089 Job No I Customer Job No 1 Customer P_O Payment Terms I Due Date 2020335 221512 Net 30 Days 11/4/2020 Quantity . Description U/M Rate/Unit Price EMERGENCY REPAIR TO 6"WATER MAIN ON WEST PORT ARTHUR ROAD 1.00 MOB/DEMOB OF EQUIPMENT LS 5,000.00 5,000.00 80.00 SAW CUT EXISTING CONCRETE LF 25.00 2,000.00 5.00 BCI DAILY CREW RATE DY 4,550.00 22,750.00 97.64 CEMENT STABILIZED SAND 7% TN 55.00 5,370.00 86.00 CEMENT STABILIZED BASE 12" SY 145.00 12,470.00 86.00 ACP TY D BOND BREAKER W/PRIME 1" SY 85.00 7,310.00 86.00 10" CONCRETE PAVING HES SY 350.00 30,100.00 Subtotal $ 85,000.00 Sales Tax (if applicable) $ 0.00 Total Due $ 85,000.00 Thank you for your business! (0 v) O CO co C) r) lit C C, V V p W H C7 N O N HN I-- 0 a CZ L Q v, 0 C) 0 O caL a O CO N u) C CO CO O) c 0 I,- Nct 715 0 Q• N N W r L x F 17) W_ O C) (L -`\I/(y`ac E 5 e L �c cnd O ` y O a m o Cr) Z J O _ C ~ z Q �, O O P m N O O z O in O z -N O O L() o _.. F— N z c N O z N ` C >- z C 0 a < _ LL W V, C CO o il' 0 NT CL v N W o x i Q e— ,,, O c- a cu (T) 0 < wo 3 >+ - c >, O a cL ca -E a0i CO r r` N Ii -3 0_ O d _) O D 3 U 5 2 4._ r O o o Y 3 x x r ^ s 3 1- x X 3 C QJ a O C Cr) L w O F. •—• O C W Ce -.„ p - E O v N C W o CO O c9 > x u 3 0 C o z C `.. a) U O 5 ce H 0_ .`. CO m Y U 1 a 1 RR E rn cn O Cf) u, o 0 o E W CT a-) o ✓ '� O m r' C %/ N a O V ' CVI N O .`•- v W C3 O C I~ CI) 1.0 O L x Ws o N .,-- • O co O U u O o a O CO 0 L -` c0 < O O O r O_ W u m 0 C O) 0 C N N 0 r O CV n a 1, r/ cL Z oOp V, i. - � C CU 7 C6 > a o E cu 0 o a) ci) y T cace �n N U O L a N E (B N L V W cL O O L O O C > m U O O _J U > 0 0 LCI_ - CO u) v v o u) co o u--) c co cnco o N CO ti v cv o o rn NCO O I— co � O ca Qas o 0 0 m a oO co O!" c o N o N W D C) Lf) ,7 CU u /('O� ,,:r N N LL - V a) U ` r r :� -o N o !\1 N j ca u w iii 2 E 0 o O N x % o Z J 0 mw O cco cn O O 0 i= = O O CO O z0_ O Or--r-- R- C am) N 2 z N o Q1 C >- z C 0 d r-- .N 0 °` n o 0 0O W 0 N LU o W = Q a) > O ce 0 1 =1111111•VI MININNIM OV H a a -IO N ci o O J O CL Ug O El s C v 3 to r- _ y t 0) I F- U U 3 a. u — .o f o C a O w m U NO • d a 2 ca ca > • N W Q d CO L- N 1 o w, //O\1 0 v 2 C ('i) o 0 0 - `e• W Vi cti O N L ry-� N N j a CD Q (� to cn O > to ami L f,, ce 0 ..��: /�y./� cn �^o o VTA co oa `� �, O o c u) z r _ W C: N a O CO O cn 0 0 o me -0 0 o o ` ca y o o _� o o_ caw a 0!� Oc rnoco cN (N O o o i V a 0 0 m zCip'') C O D (a N a O _N U o O7 O nn M 3 0 �_ O .0 > mU Cl.) +_- o --i o > O o as co M O co CO O V C V7 O to O M W }— M r-- N .. p N a O O f- ( -0 O a. CO r -3 } OU 000 O ca "' C_ : N [fTa- Niu1-7 /^O N N Cu ^ a) p It.1 _U I-- O O N 1 ae U) 2 n-� o 02 v a L Y x O U O O a) m Z 0F`. Z O � °' o z _ o g > O O o p0 OO iO O do uN o o O Z Cl) U Q ^ 0 C Z ¢ C 0 �^L G N ,-- O K .� 0 rn U 0 O W o UN W o cc a- Q a� > O 0 c o a`) i- _ m �, C . .6 Q ca ca a v L N w -, a o O _1 O iz D 3 0 U o o 0 o 3 v_ x Y x I CI_ U' CI3 ^ x f r F- U U 0 C (I) 2 O C `O O C3) 0 ~ _ O C v W — o ;l 0 az> E '5 U N C d Z Cl) (d CDN MS U) c W CO d CO C - n >. CV +-' O 0 CC u C N CJ U ..) w ca co U \ n o_ w CIS CO z N Oif) cn U oco E >, O Cn fll g O .0 C .. L S O D O uCL x 4 O d m N O `, tasCO MM c; Ncz, O co o 'n0U 0 = O N o o co O raw m C 0) O co N N O N m 0 - Z O O 0 O _ N u_ CL • N "" 41.„ . . L. O C IL Jd 0 o > m 0 L) x '= 0 0 > 0 0 dd 0 to v (--) u) d o N- W) C LC) LC") o Ln o c-) Co (13 FO- MN r p N Q N QD CO -0 Q t. a >- It"" L Q u) CD 0 o O Cil -O v Co CO a) r D �o No 715 u O N N r c_ Y W ..- :./ 1-, Q) ,= O -et V) " O M a) CO t- cn E O el) to _ -o a) O L x `i' ^ O `z a) 0 C a) c r•- v C3HZ J O � s o z Ay, o o l4 LO O N 0 O N z 'a o i n U e Cl) O z Cl) u < C) C > Z z C 0 Q. < .co o ¢ = c� U 0 0 0 0 . W o 0 O ,,; aC 1:3 m 7,) � a >% O �< _ O a) O N d d 0 d O U r_ o 2 O <r. O _ < Y c ,-- w L ti • I— U v o C N a v — O % O C d O o C u W _ _ O a ,. o n Q01 as.) um ON CD o W N^^ d W Oryry Q o z goo c (h a) U o W W a) o LL face o O , W LO U VI co r ` r � a �, N U) < Ntior cz o c M _ u, WIB U (N O to O U - -o 0 CL O O O p C c0 4 mg NEP O N - - O 0) O 0 C w o m [� c C co e- ON m O %71 �I o 0 0 m o L._ N LL - „`^i C a) D ca a) p ¢ O E a) U O 01 > u, - u, rimikili -V ON r -0 coE co �-. -.c ¢ ✓ cu p D a) ` a) o .= > mo r N U) N v c-) cn co O O Lt) cc, v v (n0 CO d Ni N O CO i- co a O cco ca r 73 } Q 6/) 0 0 0 0 (a v m co a) C ti CO CO 1--- CN cf ^O N c 2 W ll ` c n . . a) 1 W y a a) (u - NE O O c0 a m c A �0 1- Z _J 0 CC m x r Z L. A O _ c0 CO O (c7 v) -a O r Q zO O ch R o F- ~ i o N z RN, u � co ✓>- Z x C 0 a. a r '� r 0 S c D c, U W O o LY W 8 N W o r ce i Q r -o, ate) W C a)^W 0LO r (7 C > Q Q Q 0al 73 Q) CO L'' N ate. a_ 0 0 -J 0 CY 0 3 0 LI 4— 2 o = <' 0 O C x C ,-- (7 CU r h- x L , m i-- U U • 3 c a) �: O C C1) d { I o s — O c O Q a C N cn c a_ mODco .\.Y uO .+ c z Ca) U O - a i+ cti 'n cl) ,_ oxt7 us co_ > - U 1 a u i) N a d Tvl (n 0 ti W co O C � co (n D L x WF 0 N r- n p O CD cn O U O — "O O 0 1] aU 0 N O a O O (0 c -> c O ✓ 0 c O O co N N 0 c- OCG N m O z 0 0 0 m n i L a_ Z '1, 411111:iC Q) O O Y O E a) U p 7, m a) 0.) a) O . > mO v D 0 > 0 0 Cl_ CI_ 1 CD m N N O GO O O CO W C tf) N- C0 0 O N CO CO F- M (N 0 .O O LC) N ,- O F- co -a O c. " r ON 0 0 0 Ca L 0 N N CL (") u 0 k� "O Q) C6 i- `I V)cn to N > E O O C C6 Cr) u Q el ,_ mtO P Z 0 O (1.) m Z a O (13- N O -4' o FOo O O N CV i5-o Q1 C > z .N C I— 0 U 00 C) V 6:' o O w : U1 0 L ' Q e- O vi a) .> 0 O a) • t; -a O O F- >t C S+ .0 0 Q- to aso CO - 1 ti 0 >,z ' `0 Y C - N- 3 f` x J .0 u) r 1 f"' I- U U 3 O CN a u +� 0 1 O C Q) ,_ O z = O C a_ O a C = (J N CW al [0 f6 0 00 > X N U W Q d coC cn ( a f+ > 0 0 0 -0M ° r uz o O : V V) ti (NI LU in '— O - s CD� C tt") rte- co GO O O -o O (3.) (a r' - 0 O O O 0 To D ' O a) C V N. CO 0 V N N v a) o rl a a) CISE = °' •> E o (/3 -o a`) a) Y Q o o ) < ''fU` � m c� � z —) OX z 0 t9 co O „ z a O . O O o z N o 0 } z C I- O i CO LL W en 0 Ov C3 1,..L - Q •o ami 2 I- = Q) . O s a) C '6 0 U /— C 0 Q RI CO D O a a) co v; O N a_ 0 O O U 5 o O 0 0 > Y c C �� ;7 F. CO h- .7.N J N J I—• x ~ _U V 3 c a) c Q) a S 3 O C E �. O >_W E a c) LN c ,^ S o 2 CS) co O R > Z C NJz W a m o D n z `t a U o CO a O a) i (n N o Lc- d N ��-. (U m - (.) a 0 U52 o c .: L to o a o u O w m r' a. 0 'a �, N W CO O C til D _C '�!� u I o NO (J) 0 0 U co O 0 in O d C) O O .0 '- ca < O N to 0 CO .o > W C- a m /R C Q) O 00 (N (N 0 Om CO z CO c‘j OOp m a III ria: eu En o s o > m O = O _1 U > 0 0 d0_ ( L CO u) O N CO Cl) N O (7) CU C ti N- 0) CO O O o CA N O O O c'') r e- O f"" f, -0 CD C.1 c'3 ,e" MI } Qco 00 o 0 f° 'O O Vt CD CO" * C v v O : rn LU co co o M N t •M ,_) p W U a) CQ H I- CU , E 6 v cn N -0 0 U r O le w O CL7 O O as a Q) m `V} Cif Z J O � W s z >.. 0 1 O N zz Cl) F- c'')C'') z N 0 u Q) } 2 O 0 ' Q Cl)• O ~ V Uo W o L Q CD co LT c a) > Q O _ OC -.0 0 ° c0 a) -o OCn N a o C3 J O CC U 4- 0- o Y = C ¶ Ct N. N- 2 I X i I— i- C a) J ....; — o z O C a u > y O .. E = U N C / cc- 3 _ ¢ V y co n. m C 0) y,,� ..+ O = _0 I v C T C U 0 as V \ W H co r a) L ca N G ce 0- " C6 m > - v a O lw O r c. N N O , fA a) L t of o O " C a , oa 0 v O dm p I- N 3 LLU `- d. O cO ON 0 0 as COflit CO') O co N N C1 r' O m O z o O 0 O ` N L_ eL H W � 0 a) . . o o p p a) co o E a) 7 a) T c cc, > o > CC) O 0 _ 0 J 0 > O CI � L 1-- 0 r 0 U) Cr) CO O N O N CO C Cr) CO O O u? cy — O Q O N N I- ).- h.. a) M r o 0 o O -(7;D co co O a) c o co o c 7 N N O ^O '4' N Na_ ,- L.L L W /- a) V H W Lo- (1) N C U) D a) ...) L x O a C\NU Z J O f: j W z - O O p O O P_ N O (n u O C >- z = H d • '' N E W c 41 O o T Ce 1 C.) CD W o WW Q 0 (B7 O a) (n O N a -)a . o 0 . i O I U s O ti9, - 3 C r-- (C F- w I— H U V C a) nYj .: — o v 1 C Q) ly O0 • .O C a N 52 E U ON d 52 O d 4--• N .., m a U) Li c i ›>. (V C 0 7 dco 0 a C (_) Q to (13 m ca F-- c z Qi -- NOc Ua) i O 5 C V) V in O d com N O D u co ON ' C N_ co N 7 L �"' 0 N CO � N 0 0 C_; j a r n' O Cfl O .0 ` @ W O 3o co co .a.- r_. °> w o a Q) O co N N 0 N O O 2 0 0 0 3 f ;jj Tini U 7) L -0 u) E (6 T U O. > CO U 0J 0 > 0 o aa , EXHIBIT "C" (Crabtree Invoice#27407) Crabtree Barricade Systems, Inc INVOICE P.O. BoxInvoice Number: 27407 TX Beaumont,,TX 77720 Invoice Date: Oct 6, 2020 Page: 1 Voice: 409-842-5010 Duplicate Fax: 409-842-0593 Bill To: Ship to: CITY OF PORT ARTHUR CITY OF PORT ARTHUR P.O. BOX 1089 EMERGENCY CLOSURE PORT ARTHUR,TX 77640 WEST PA ROAD USA Customer ID Customer PO Payment Terms 200 221393 Net30 Days Sales Rep ID Shipping Method Ship Date 1 Due Date Airborne 11/5/20 Quantity Item 1 Description I Unit Price Amount 1.00 41080 LAST HALF OF WORK ZONE& 9,350.00 9,350.00 PERMANENT PAVEMENT MARKINGS 1.00 41000 REMOVAL OF EMERGENCY LANE 1,950.00 1,950.00 CLOSURE Subtotal 11,300.00 Sales Tax Total Invoice Amount 11,300.00 Check/Credit Memo No: Payment/Credit Applied TOTAL 11,300.00