HomeMy WebLinkAboutPR 21658: EDC, CONTRACT WITH SITIK OMNI SERVICES, LLC P.R. No. 21658
11/4/2020 FB
RESOLUTION NO.
A RESOLUTION RATIFYING THE CONTRACT ENTERED INTO
BETWEEN THE CITY OF PORT ARTHUR SECTION 4A ECONOMIC
DEVELOPMENT CORPORATION AND SITEK OMNI SERVICES, LLC
FOR SELECTIVE ABATEMENT OF VARIOUS EXTERIOR ASBESTOS
CONTAINING MATERIAL AS NEEDED TO FACILITATE PLANNED
RENOVATIONS OF THE FORMER PORT ARTHUR NEWS BUILDING
LOCATED AT 549 4TH STREET IN PORT ARTHUR, TEXAS FOR THE
LUMP SUM AMOUNT OF $46,400.00; FUNDS AVAILABLE IN EDC
ACCOUNT NO. 305-1606-591.82-00
WHEREAS, Sitek Omni Services, LLC ("Sitek") submitted a proposal on September 10,
2020, consisting of the selective abatement of various exterior asbestos containing materials
(beyond those identified in previous Sitek Proposal #20-04-01, dated April 7, 2020) as needed to
facilitate planned renovations to the former Port Arthur News Building located at 549 4tn Street,
attached hereto as Exhibit"A"; and
WHEREAS, Sitek has successfully completed a previous contract to the complete
satisfaction of the PAEDC for asbestos, lead and mold abatement and interior demolition at the
former Port Arthur News Building; and
WHEREAS, Sitek prepared the exterior work area in accordance with Total Safety
Technical Specification, State (Texas DSHS) and Federal (EPA/OSHA) regulations regarding
the removal of exterior non-friable asbestos materials; and
WHEREAS, Sitek provided man-lifts as needed to access elevated materials scheduled
for abatement; and
WHEREAS, Sitek removed and grind down all uneven surfaces from the upper wall
sections along the South, East and West sides of the building not scheduled for complete removal
in order to facilitate the installation of new wall panels glued to exterior surface by the General
Contractor; and
WHEREAS, Sitek provided saw-cut of new window openings through brick walls
coated with vapor barrier mastic; and
WHEREAS, the cost for the removal of approximately 8,000 sq. ft. of brick coated with
asbestos containing vapor barrier mastic and the saw-cut of new window and doors was for the
lump sum price of$46,400.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF PORT ARTHUR, TEXAS:
Section 1. That the facts and opinions in the preamble are true and correct.
Section 2. That the City Council of the City of Port Arthur hereby ratifies the agreement
between PAEDC and Sitek Omni Services LLC for the lump sum price of $46,400 attached
hereto as Exhibit"A".
Section 3. That a copy of the caption be spread upon the minutes of the City Council.
READ, ADOPTED AND APPROVED on this day of A.D., 2020,
at a Meeting of the City Council of the City of Port Arthur, Texas, by the following vote:
AYES:
Mayor
Councilmembers
NOES:
Thurman Bartie,Mayor
ATTEST:
Sherri Bellard, City Secretary
APPROVED:
Floyd Batiste, PAEDC CEO
APPROVED AS TO FORM:
Guy N. Goodson, PAEDC Attorney
APPROVED AS TO FORM:
Valecia R. Tizeno, City Attorney
APPROVED AS TO THE AVAILABILITY OF FUNDS:
GA---- o
Kandy Daniel, I erim Finance Director
EXHIBIT "A"
i,
Sitek Omni
*Selective and Structural Demolition • TDSHS Asbestos License#80-1070
*Asbestos and Lead Abatement • TDSfS.MobiIlbmve#>311110el2$
*Hazardous and Mold Remediation • TDLR Mold license #RCO-1218
September 10, 2020
Mr. Floyd Batiste
Port Arthur Economic Development Corp.
501 Procter Street, Suite 100
Port Arthur, Texas 77640
(409) 963-0579
fbatiste@paedc.org
SUBJECT: Selective Asbestos Abatement Services
Former Port Arthur News Building in Port Arthur, TX
Sitek Omni Proposal#20-09-11
Mr. Batiste,
Sitek Omni Services, LLC (Sitek) submits the following proposal, consisting of the
selective abatement of various exterior asbestos containing materials (beyond those
identified in previous Sitek Proposal #20-04-01, dated April 7, 2020) as needed to
facilitate planned renovations to the Former Port Arthur News Building located at 549 4th
Street in Port Arthur, Texas.
I. SCOPE OF WORK
Sitek Responsibilities:
A. Preparation of the exterior regulated work areas in accordance with Total Safety
Technical Specifications, State (Texas DSHS) and Federal (EPAIOSHA)
regulations regarding the removal of exterior non-friable asbestos materials from
a public building scheduled for renovation.
B. Provide man-lifts as needed to access elevated materials scheduled for
abatement.
C. Remove and grind down all uneven surfaces (brick coated with asbestos
containing vapor barrier mastic)from the upper wall sections (from approx. 12'h
to roof) along the South, East and West sides of the building not scheduled for
complete removal (-8,000 SF) in order to facilitate the installation of new wall
panels glued to exterior surfaces by the General Contractor. This will be done
using boom lifts with enclosed work platforms within which chipping, chiseling
and grinding of materials will occur and be bagged as asbestos waste). Materials
will be kept wet to the extent possible during the removal and bagging processes.
D. Provide saw-cuts of new window (5 EA)/door (1 EA) openings (field marked
lay-outs by the General Contractor) through brick walls coated with vapor barrier
mastic.
E. OSHA required air monitoring of Sitek Omni employees in regulated areas.
1780 Roughneck Drive,Humble TX 77338
Office Phone:281-812-1461
Sitek Omni
hf
CLARIFICATIONS/QUALIFICATIONS:
A. Sitek will use the trucking company and licensed landfill of our choice for
demolition and construction debris.
B. The testing, removal, handling, transporting and disposing of any unforeseen
hazardous waste materials (excluding identified asbestos containing materials)
are excluded from this scope of work.
C. Dump fees for all waste generated are included in pricing.
D. The following potential work items are excluded from this proposal:
> Shoring;
> Removal of roofing materials;
> Provide temporary cones, signage and fencing as temporarily needed during
working hours to safely complete the exterior work along city streets;
> Site maintenance after Sitek demobilizes from the site;
> Field lay-outs of saw-cut openings for new window opening;
> Security of building(boarding of window openings);
> Installation of new panel support brackets into existing vapor barrier mastic;
> Payment and performance bonds.
Facility Owner Responsibilities:
A. Provide site access, electrical power supply, water supply, parking for Sitek
employees and Sitek-supplied waste trucks/dumpsters for the work.
B. Provide a third-party Industrial Hygiene firm (Total Safety) for the purposes of
providing daily area air monitoring, final air clearances (PCM)and final report.
C. Replacement of all materials abated and demolished by Sitek.
II. PROCEDURES
Sitek Omni Services, LLC is a certified asbestos abatement (TDSHS License #80-
1070) and demolition contractor in Texas. All local, state (TDSHS) and federal
(NESHAPS, EPA and OSHA) codes regarding asbestos abatement and elevated
selective demolition shall be strictly implemented.
III. DISPOSAL
All asbestos containing material will be handled, transported and disposed of as per
federal, state and local regulations to an EPA approved landfill. Sitek Omni will
prepare waste manifest based on facility ownership entity information provided by
client.
IV. SCHEDULE
Sitek Omni proposes completion of listed abatement scope of work within a single
job site mobilization, consisting of approximately twelve (13) shifts,working
Monday—Friday, up to 10 hours per shift(7am—5:30pm).
Page 2 of 3
Sitek#20-09-11
le* Omni
V. PRICING
Lump sum price per listed abatement scope of work: $ 46,400.00
Pricing provided is valid for 90 calendar days from the date of this proposal.
VI. INSURANCE
Sitek Omni carries occurrence-type General Liability coverage totaling $3 million
per occurrence and $3 million general aggregate with an additional $10 million
umbrella. Sitek also carries a $2 million Pollution Liability policy. Sitek Omni's
program also includes Auto Liability, Employer's Liability and statutory limits for
Worker's Compensation. Liability and workers compensation policies are provided
through Starr Indemnity & Liability Company and Federal Insurance Company and
are AM Best Rated A+, XIV.
Floyd, we wish to thank you for your consideration and look forward to working with
you on this project. Should this proposal meet with your approval, please sign below,
and return via email or fax as a notice to proceed with the work.
Sincerely,
JW
Jon K. Woodard
Vice President—Sales
DWard'ittotalsafety.com
Note: Please sign as an authorization to proceed with the listed selective asbestos
abatement (selective vapor barrier mastic to smooth exterior surfaces, windows
and door) on exterior surfaces to facilitate planned renovations at the former Port
Arthur News Building located at 549 4`" Street in Port Arthur, Texas and return
via fax or email.