Public Works Department
MEMORANDUM pp
TO: Stephen Fitzgibbons, City Manager q /J ~it~~'
FROM: John A. Comeaux, P.E., Director of Public Works /~.~,
DATE: 29 April 2008 '~V _
RE: Streets Bond Projects
The projects we are recommending for the streets bonds will consist of projects outside the
ist of reconstruction or resurfacing by both
ill
cons
scope of the normal streets program and w
The recommended projects are as follows:
City crews and contractors.
Procter Street from 9"' Avenue to Stadium Road $287,500
(milling, concrete repair, HMAC)
Stadium Road from Lewis Drive to the south dead end $138,000
(milling,-concrete repair, HMAC)
S. i~t Avenue from the north dead end to the Texas Bayou bridge 475,200
$
(HMAC for industrial traffic). $546,350
Jade Avenue from ST 73 to FM .365
(milling and HMAC)
Lewis Drive from Stadium Road to 9th Avenue $
312,100
(milling, concrete repair, HMAC)
hnson Boulevard from US 69 to SH 347
J
i $210,000
o
mmv
J
(concrete repairs) $145,000
Gilham Circle
(milling, concrete repair, HMAC)
Thomas Boulevard from Woodworth Boulevard to 9"' Avenue
$255,500
(milling, concrete repair, HMAC)
90`" Street from US 69 to SETX Airport property -City share 55,000
$
(reconstruct as concrete roadway) $ 55,000
Old Yacht Club Road -last 1,000 feet
(HMAC for industrial traffic) $200,000
Anchor Drive Extension -City share of infrastructure
(construct new concrete roadway)
Tallow Woods Sect. 3subdivision -City share of infrastructure 200,000
$
(construct new streets and drainage)
Purchase of Newpurchase of Nevv E~uioment $ 60,000
Pothole Patcher $ 60,000
Used Concrete Truck
These equipment items will allow for better, more timely repairs and increased capability
and cost savings for concrete work.
1 of 2
Z:\engineer\documents\memos\Streets Bond.doc
Alternate Projects: $123,300
Austin Avenue from Gulfway Drive to 8`" Street
(concrete repair and HMAC overlay) $ 67,100
39`" Street from Memorial Boulevard to 5~' Avenue
(concrete repair and HMAC overlay)
Please call me if you require further information.
cc: Ross E. Blackketter, P. E., City Engineer/Asst. Director of Public Works
Paul Brown
JAC/reb
2of2
Z:\engineer\documents\memos\Streets Bond.doc
~`
CITY OF PORT ARTHUR
Public Works Department
MEMORANDUM ,,SS
i~ .G
TO: Stephen Ftzgibbons, City Manager
FROM: John A. Comeaux, P.E., Director of Public Works
DATE: 23 April 2008
RE: Drainage Bond Projects
The projects we are recommending for the drainage bonds are as follows:
Procter Street Storm Sewer from Duff Drive to Pecos Avenue $400,000
This project will consist of the construction a storm sewer trunk line as shown in the
Tumer, Collie & Braden Master Drainage Plan. The installation of this line will greatly
reduce the flooding problem that exists in the Lakeview area. Because of the size of the
required pipes, this work will be contracted out.
Vista Village Outfall Ditch $250,000
Complete the concrete .lining of the remaining .1,000 feet of the Vista Village outfall
ditch. Concrete lining the ditch will reduce the maintenance requirements allowing City
assets to be utilized in other areas. This will be done by a contractor.
Mauve Outfall Ditch $340,000
Widen the existing outfall ditch from Mauve Avenue to State Highway 73 to improve the
drainage in the- Palomar area. This project can be completed by City crews or
contractor.
2nd Avenue Storm Sewer from 11"' Street to i2d' Street $ 91,000
Replacing the existing pipes and catch basins with larger drains and inlets to City
standards to relieve local flooding conditions. This project will be accomplished by City
crews.
Lee Avenue Storm Sewer from Delaware Drive to lOd' Street $100,000
Replacing the existing pipes and catch basins with larger drains and inlets to City
standards to relieve local flooding conditions. This project will be accomplished by City
crews.
5"' Street Storm Sewer from Trinity Avenue to 13"' Avenue ROW $200,000
This project will consist of the construction a storm sewer trunk line as shown in the
Tumer, Collie 8c Braden Master Drainage Plan. The installation of this line will greatly
reduce the flooding problem that exists in the Lakeview area, and will be by City Crews.
Z:\engineer\documents\memos\Drainage Bond.doc
loft
Rev. Raymond Scott Ave. Storm Sewer from W 19"' Street to Thomas Blvd. $350,000
This project will consist of the construction a storm sewer trunk line to convey
stormwater from W. 19"' Street into the existing system south of Gulfway Drive. The
installation of this line will greatly reduce the flooding problem that exists in the
Westside. This project can be constructed by City crews or by contractor.
Purchase of New Track Gradall $250,000
Purchase of this equipment item will allow the construction of the above mentioned
projects by City crews. The current machine used for storm sewer construction is a
1993 XL4100 Gradall which is not capable of handling the load of the new construction
projects.
Please call me if you require further information.