Loading...
HomeMy WebLinkAboutPR 21656 SEWER FORCE MAIN REPLACEMENT Ergs City of City �� hl t ry ft ,- Texas INTEROFFICE MEMORANDUM UTILITY OPERATIONS DEPARTMENT-ADMINISTRATION Date: November 4, 2020 To: Ronald Burton, City Manager From: Donnie Stanton, Interim Director of Utilities RE: Proposed Resolution No. 21656—Sewer Force Main Replacement Nature of the Request: The Sanitary Sewer Force Main coming from the El Vista Lift Station has reached the end of its life expectancy and breaks often,causing a potential health risk. The Force Main currently travels along a pipeline right of way and along a section of the LNVA freshwater canal, so alternate routes will be investigated. The intent of this Resolution is to seek City Council's approval to enter into a contract with Arceneaux, Wilson & Cole, LLC to engineer as well as manage the construction phase of the El Vista Force Main Replacement Project. The engineering phases of this project has a total design period of ten (10) months and a construction period of nine (9) months for a total project duration of nineteen (19) months. The design phase of this project is $78,405.00 and the construction phase of this project is $26,250.00 for a total projected budgetary impact of $104,655.00. Funding is available in Utilities Account No. 405-1621-532.83-00, Sewer System. AWC is one of the engineering firms pre-qualified through the RFQ process and approved by council Resolution No. 19-315. Bucket Considerations: The design phase of this project is $78,405.00 and the construction phase of this project is $26,250.00 for a total projected budgetary impact of$104,655.00. Funding is available in Utilities Account No. 405-1621-532.83-00, Sewer System. Recommendation: I recommend that the City Council approve Proposed Resolution No. 21656 to authorize the execution of a contract in the amount of$104,655.00 for the replacement of the sewer force main in El Vista. P.R. 21656 11/4/20 bw Page 1 of 3 RESOLUTION NO. A RESOLUTION AWARDING A CONTRACT AND AUTHORIZING THE CITY MANAGER TO EXECUTE A CONTRACT WITH ARCENEAUX, WILSON & COLE, LLC OF PORT ARTHUR, TEXAS WITH A PROJECTED BUDGETARY IMPACT OF$104,655.00 FOR THE REPLACEMENT OF EL VISTA SEWER FORCE MAIN; FUNDING IS AVAILABLE IN UTILTIIES ACCOUNT NO. 405-1621-532.83-00, SEWER SYSTEM. WHEREAS, the El Vista force main is on the capital improvements project list for fiscal year 2021; and, WHEREAS, per Res. 19-315, Arceneaux, Wilson & Cole, LLC was one of the pre- qualified engineering firms for providing professional engineering services for utility projects through an RFQ selection process in Council Resolution 19-315 (Exhibit"A"); and, WHEREAS, also per Res. 19-315, City Manager was authorized by Council to negotiate the contract for Engineering Services for Utility Projects; and, WHEREAS,Arceneaux, Wilson & Cole, LLC of Port Arthur, Texas has negotiated with the City Manager and provided a quote in the amount of $104,655.00 (see Exhibit "B") for engineering design and construction services, which has been evaluated by the Water Utilities staff. NOW THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT, the facts and opinions in the preamble are true and correct; and, THAT, the City Council of the City of Port Arthur hereby awards the contract for the El Vista sewer force main to Arceneaux, Wilson & Cole, LLC of Port Arthur, Texas for the amount of$104,655.00 for engineering design and construction services; and, P.R. 21656 11/4/20 bw Page 2 of 3 THAT, the City Manager of the City of Port Arthur is hereby authorized and directed to execute, on behalf of the City, a contract between the City of Port Arthur and Arceneaux, Wilson & Cole, LLC of Port Arthur, Texas for the amount of$104,655.00 for the El Vista sewer force main in substantially the same form as attached hereto as Exhibit"B"; and, THAT, a copy of the caption of this Resolution be spread upon the Minutes of the City Council. READ, ADOPTED,AND APPROVED this the_day of , A.D. 2020 at a meeting of the City of Port Arthur, Texas by the following vote: Ayes: Mayor: Councilmembers: Noes: Thurman"Bill" Bartie, Mayor ATTEST: Sherri Bellard, City Secretary APPROVED AS TO FORM: APPROVED FOR ADMINISTRATION: Valecia Tizeno Ron Burton City Attorney City Manager Donald Stanton Interim Utilities Director P.R. 21656 11/4/20 bw Page 3 of 3 APPROVED AS FOR AVAILABILITY OF FUNDS: Kandy Daniel Interim Director of Finance e/ 4/ (i/j1141,- Clifton illiams, CPPB Purchasing Manager Exhibit "A" y 4 u C C v o N C W w u `� 4 ¢ z o ei Z, U el C C p V . O c.cz `n 7 ef C 4 W et a vu uC et L ul • oo et Q4 x c a W . 0 �c x cn C L r C O al C O dti • � v 0.1 za • '� .� al a .. W W O _ R C .> ce O E U y a.. cn z c o 2C — c w t::: C @ V O a V) � x o W 4 F csi , 1 0. L • 00 o o alc n t U •c U u C co u -C 0. 0 a d 0 tr t.' U V 0 V V V y L 1. OC T O 0. R. F F si..) 14 Ilir S - C! ' ,TT r„ V ll‘. • tj ry d • 'Elti 7 M M N W `o U Z a F r. o O• e� e� ...I eq es.) N o L'. f.2.0 IQ. O ".E. `� °� y n crs M u .� O a G V. G C o W L4 G > ": 0 V C.) a C7 .. .n N Q zo F O O .n _ y N b M 04 TT b0 C N L 1 at O 0 uo O O G' . 00 O H O Q+ M N y 1 al O al U r .S c o V O 0. o N 6 0 c v 0 V c7 s N 25 'o .o a a` a. F E� a >. Exhibit "B" AtraibilkAOC VO YAW ARCENEAUX WILSON&COLE engineering!surveying I planning November 2, 2020 Mr. Donald Stanton City of Port Arthur 444 4the Street Port Arthur,TX 77642 RE: PROPOSAL FOR ENGINEERING SERVICES for El Vista Force Main Replacement Dear Mr. Stanton, Thank you for the opportunity to assist you on t -ment Project.This project will be for the design of a rer from the El Vista Lift Station to the discharge Road. The approximate length of the prof' scope of work for this proposal is based route as well as investigating possible on our understanding of the project wL in and design this project as requested. We prof._ low. SCOPE OF SERVICES: Preliminary Design Phase: 1. Engineer will evaluate existing El Vista Lift Station set . . area to determine required pumping capacity to verify sizing of force main. 2. Engineer will evaluate pipe materials and provide a recommendation to the City. 3. Engineer will investigate and provide an alternate route for the replacement force main.This will include modifying segments of existing force main alignment as well as a complete rerouting of the force main. 4. Upon completion of routing study engineer will provide a written report to City and provide an Opinion of Probable Cost (OPC)for each alternative route presented. 409.724.7888 2901 Turtle Creek Dr.,Suite 320 Port Arthur,TX 77642 Engineering Surveying awceng.com F-16194 10194049 A•mAk awe v.pir Detailed Design Phase: 1. Engineer shall provide a topographic survey of proposed alignment for force main replacement.This includes a sub-surface utility investigation to identify potential conflicts with pipelines,water distribution system, drainage system, etc. 2. Engineer shall provide a geotechnical investigation of soil conditions of site/route to aid in design of new force main. 3. Engineer will apply for on behalf of the City, all permits required for construction based on the proposed alignment for the replacement force main. Permitting agencies include TXDOT, UPRR, LNVA, DD7 and numerous pipeline operators. 4. Engineer shall provide detailed engineered plans and specifications for a new force main. Engineering design plans shall include: a) Plan and profile of proposed force main. b) Horizontal directional drill plans and profile (HDD) if applicable. c) Detailed plan and profile of critical crossings identified in subsurface utility investigation and at permitted crossings. d) Details for tie in at El Vista Sanitary Sewer Lift Station. e) Provide horizontal and vertical control for construction. 5. Provide detailed construction cost estimates at 30°%o,60°%o,90°%o and 100% drawing submission. 3. Prepare Project Manual with technical specifications, bid forms etc. Bidding & Construction Phase: 1. Assist in the preparation of formal contract documents and bidding. 2. Engineer shall attend Owners Pre-Bid meeting. 3. Engineer shall answer any questions during bidding, prepare and distribute addenda, if necessary. 4. Engineer shall assist the Owner in tabulating the bids. 5. Engineer shall prepare a Letter of Recommendation to the Owner for award of the construction contract. 6. Engineer shall assist the Owner in conducting a pre-construction conference. 7. Engineer shall provide a construction inspector during construction. 8. Engineer shall review and approve monthly pay requests submitted by the contractor. 9. Engineer shall review and approve construction submittals. *Ix iliac _' 10. Engineer shall review and respond to RFI's. 11. Engineer shall prepare change orders and required documentation for Owners approval. 12. Engineer shall prepare project closeout documentation including "Record of Construction Drawings" based on mark-ups supplied by the contractor. SERVICES NOT A PART OF OUR SCOPE OF WORK Services specifically excluded from our proposed Scope of Services include, but are not necessarily limited to the following: 1. Construction Staking. 2. Fees for permitting. 3. Testing, advertising,etc.for TPDES permit. 4. Design for trench safety. 5. Surveys for property acquisition. 6. Surveys for permanent and/or working easements. 7. Title research fees. 8. Environmental Services including but not limited to the following: a) Threatened and endangered species surveys. b) Waters of the US. Determination. c) Wetland Delineations. d) USACE permitting and/or coordination. e) Lead paint evaluation and abatement. f) Preparation and/or application for SW3P permit. PROFESSIONAL FEE Based upon our scope of work and understanding of the project, we propose to be compensated based on a not to exceed fee of$104,655.00 for our services. Preliminary Design Phase $ 37,355.00 Detailed Design Phase $ 41,050.00 Construction Phase $ 26,250.00 TOTAL FEE $ 104,655.00 coffic TfAl fir We recommend a design period of 6-months to perform the Preliminary Design Phase, 4-months for the Detailed Design Phase and 9-months for the Construction Phase,for a total project duration of 19-months. We look forward to your review of our proposal. If you have any questions or need additional information, please contact me. Very truly yours, ARCENEAUX WILSON & COLE LLC Joe M. ilson,Jr., PE President