HomeMy WebLinkAboutPR 21677: CHANGE NO. 17 TO NO. 31 SETX CONSTRUCT, TRANSIT'S NEW MAINTENANCE BUILDING AND ELECTRIC CHARGING INFRASTRUCTURE • City of Port Arthur Transit Department Memorandum To: Ronald Burton,City Manager From: Ivan Mitchell,Transit Director 1\ Date: November 20,2020 Re: P.R 21677—Authorization to execute change orders No. 17 to No.31 with the Construction Managers of Southeast Texas(CMOST)to construct PAT's new maintenance building and electric charging infrastructure to a new contract amount not to exceed$3,774,691.51 Nature of Request: Proposed Resolution No. 21677 requests authorization for the City Manager to execute change orders No. 17 to No. 31 with Construction Managers of Southeast Texas (CMOST) to construct PAT's new maintenance facility and electric bus charging infrastructure. Background: Resolution No. 20-042 authorized the City Manager to execute a contract of$3,495,000.00 with the Construction Managers of Southeast Texas (CMOST) to construct PAT's new maintenance facility and electric bus charging infrastructure,and supply specified tools and shop equipment. In an effort to include Alternate No. 1 (inspection pit) and No. 2 (in-ground lift) in the project scope, PAT and its engineer (Huitt-Zollars) elected to consolidate project cost and value engineer (VE) CMOST's $3,495,000.00 base bid to a new total of$3,731,600.36 via Resolution No.20-080. As construction ensued design and material adjustments have occurred resulting in additional expenses and savings approved by City Council in Resolution No. 20-305. These expenses and savings in change orders No. 3 to No. 16 resulted in a net contract reduction of$88,259.87. Change orders No. 17 to No. 31 in P.R. No. 21677 involve additional expenses and cost savings following the approval of Resolution No. 20-305. This has resulted in a net project increase of$131,351.02 for a new contract amount of$3,774,691.51. A detailed breakdown of change order No. 17 to No.31 is provided in the packet. Recommendation: It is recommended that the City Council approve P.R. No. 21514, authorizing the City Manager to enter into change orders No. 17 to No. 31 with CMOST to construct PAT's new maintenance facility and electric bus charging infrastructure for a new contract amount not to exceed $3,774,691.51. Budgetary/Fiscal Effect: The Federal 5307 and 5339(b) funds for this project are 100%reimbursable in account 401-1509-561.82-00 with a local match of$58,700 required for the Federal 5339(c)funds. P.R. No. 21677 11/23/2020 IM RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO APPROVE CHANGE ORDERS NO. 17 TO NO. 31 WITH THE CONSTRUCTION MANAGERS OF SOUTHEAST TEXAS OF PORT ARTHUR, TEXAS TO CONSTRUCT PORT ARTHUR TRANSIT'S NEW MAINTENANCE BUILDING AND ELECTRIC CHARGING INFRASTRUCTURE TO A NEW CONTRACT AMOUNT NOT TO EXCEED $3,774,691.51; FUNDS AVAILABLE IN ACCOUNT 401-1509-561.82-00. WHEREAS, pursuant to Resolution No. 20-042, the City Council authorized the City Manager to enter into a contract with Construction Managers of Southeast Texas (CMOST)to construct PAT's new maintenance facility and electric bus charging infrastructure; and, WHERAS, pursuant to Resolution No. 20-080, the City Manager was authorized to execute Change Order No. 1 with CMOST which resulted in a savings of$154,199.64; and, WHERAS, pursuant to Resolution No. 20-305, the City Manager was authorized to execute Change Orders No. 3 to 16 with CMOST which resulted in a savings of$88,259.87; and, WHEREAS, subsequently PAT and its engineer (Huitt-Zollars) continue to work with CMOST on adjustments related to design, equipment, and materials resulting in additional expenses and savings which equates to a net increase of$131,351.02; and, WHEREAS, PAT is recommending that the City of Port Arthur by its City Manager approve change orders No. 17 to No. 31 with CMOST, as delineated in Exhibit "A" for a new contract amount not to exceed $3,774,691.51. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT,the facts and opinions in the preamble are true and correct. THAT, the City Manager is hereby authorized to enter into a change order with the Construction Managers of Southeast Texas (CMOST) of Port Arthur, Texas, to construct Port Arthur Transit's maintenance building and electric charging infrastructure, in an amount not to exceed $3,774,691.51, in substantially the same form as attached hereto as Exhibit"B". THAT, a copy of the caption of this Resolution be spread upon the Minutes of the City Council. I! - . P.R. No. 21677 11/23/2020 IM READ, ADOPTED AND APPROVED this day of A.D. 2020 at a Regular Meeting of the City of Port Arthur, Texas by the following vote: AYES: Mayor: , Councilmembers: , • NOES: . Thurman"Bill" Bartie, Mayor ATTEST: Sherri Bellard, City Secretary APPROVED AS TO FORM: 2/ (Ltal 11-7 kg# Val Tizen , City Attorney APPROVED FOR ADMINISTRATION: APPROVED AS TO AVAILABILITY OF FUNDS: 401-1509-561.82-00 'CAi� ---'-- p,_,_,____yi' Ronald Burton Kandy Danie City Manager Interim DirectoY of Finance e-. 1,/ / CA L Clifton Wil lams, CPPB Ivan Mitchell Purchasing Manger Transit Director Exhibits Are Available For Review In The City Secretary's Office