Loading...
HomeMy WebLinkAboutPR 14744: ALLCO, INC. - WT SYSTEM IMPROVEMENTS @ NEW PAISD HIGH SCHOOL .. MEMORANDUM CITY OF PORT ARTHUR UTILITY OPERATIONS DEPARTMENT TO: Stephen Fitzgibbons, City Manager FROM: Kelly Eldridge, Director of Utility Operations ' ~!, j G~'~ ~ .. DATE: June 3, 2008 SUBJECT: Proposed Resolution No. 14744 C®MMENTS RECOMMENDATION ' I recommend that the City Council approve Proposed Resolution No. 14744, which accepts the Engineer's Certificate of Completion, Contractor's Certificate of Guazantee, and Contractor's Certificate and Release from Allco, Inc. for the completion of public water system improvements to serve the new PAISD High School. BACKGROUND The PAISD developed a tract of land for the new High School~on Sgt. Lucian Adams Dr. between U.S. 69 and 9e' Avenue. The PAISD has already granted the City easements for these utilities. Their contractor, Allco, Inc., subsequently performed this work in accordance with City Standards and the improvements are readyfor acceptance by the City. --- BUDGET/FISCAL EFFECT None. STAFF/EMPLOYEE EFFECT City staff attended the Final Inspection of these utilities to verify conformance with City Standazds. SUMMARY Approval of Proposed Resolution No. 14'744 is recommended. P.R. No. 14744 06/03/08 RESOLUTION NO. A RESOLUTION AUTHORIZING ACCEPTANCE OF AN ENGINEER'S CERTIFICATE OF COMPLETION, CONTRACTOR'S 'CERTIFICATE AND RELEASE AND CONTRACTOR'S CERTIFICATE OF GUARANTEE FROM ALLCO, INC. FOR THE COMPLETION OF PUBLIC IMPROVEMENTS (PUBLIC WATER SYSTEM) TO SERVE THE PAISD NEW MEMORIAL HIGH SCHOOL, AND AUTHORIZING THE CITY MANAGER TO SIGN THE CERTIFICATE OF ACCEPTANCE ON BEHALF OF THE CITY OF PORT ARTHUR, TEXAS. WHEREAS, the PAISD planned and developed a tract of land for the purpose of constructing a new High School campus; and, WHEREAS, the PAISD granted utility easements for these public improvements; and, WHEREAS, the PAISD contracted with Allco, Inc. for construction of the public water system throughout this development; and, WHEREAS, the City has received an Engineer's Certificate of Completion dated May 15 2008 from John Holm, P.E. of Fittz & Shipman Consulting Engineers, certifying that the water system in the project has been completed according to City Standazds, copy attached hereto and made a part hereof as Exhibit A, together with a Contractor's Certificate and Release (Exhibit B) and a Contractor's Certificate of Guazantee (Exhibit C) executed by Joseph Ping, Project Manager, of Allco, Inc.; NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: -^ Section 1. That the City Manager of the City of Port Arthur is hereby authorized to P.R. No. 14744 06/03/08 Page 2 execute on behalf of the City of Port Arthur a Certificate of Acceptance (Exhibit D) for the completion of the public water and sewer infrastructure. Section 2. That a copy of the caption of this Resolution be spread upon the Minutes of the City Council. READ, ADOPTED AND APPROVED TffiS day of , 2008 at a Regulaz Meeting ofthe City Council of the City of Port Arthur, Texas, by the following vote: AYES: Mayor _ Councihnembers NOES: Deloris-Prince Mayor ATTEST: APPROVEDnAS~TO FORM: ~(/ Terri Hanks Mark Sokolow / ~ / City Secretary City Attorney C ~-~-~~~ APPROVED: Stephen Fitzgibbons elly EI •idge City Manager Directoc of Utility Operations EXHIBIT A CERTIFICATION OF COMPLETION Date: Mati 15, 2008 Project:. Port Arthur Independent School District ' Port Arthur High School ' 9`~ Avenue and Sgt. Adams Drive To: Owner -City of Port Arthur Contractor: Allco, Inc. GENTLEMEN: I HEREBY CERTIFY THAT 8 inch water line project was installed between July 27, 2007 and May 9, 2008, that the project was under peiiodic inspection during construction by Fittz & Shipman.. Inc., Project Manager,>and inspected full time by Joe.Garreft; resident inspector for the project, To the best of my knowledge, this project was constructed substantially in accordance with the plans and specifications,,and that record documents were submitted. to the City of Port Arthur Water Lirie Standards. Submitted: FITTZ & SHIPMAN, INC. d . 1405 Cornerstone Court Beaumont, Texas 77706 EXHIBIT B CONTRACTOR'S CERTIFICATE OF GUARANTEE FROM:_Al i cn (Name of Contractor) TO: City of Port Arthur (Local Public Agent) REFERENCE CONTRACT NO. N/A ENTERED INTO THE 28th DAY OF March .2007 ,BETWEEN THE Port Arthur Independent School District AND Allco OF Beaumont Texac l~~ ~ r) (STATE) FOR THE OF THE port .Arthur High .School _._ ----- (Name of Project) LOCATED IN THE CITY OF PORT ARTHUR, TEXAS: KNOW ALL MEN BY THESE PRESENTS• _81ico - -~_ ~ _ ~ does hereby guarantee all of the work done under the above referenced contract to be free from faulty materials in every particular, and free from improper workmanship, and against injury from proper and usual wear; and agrees to replace or re-execute without cost to the Owner such v/ork as may be found to be improper or imperfect, and to make good all damage caused to other work or materials, due to such required. replacement or re-execution. 2. This guarantee shall cover a period of one (1) year from the date of acceptance of all +A~ork under this Contract, as evidenced by Fittz s, Shipman, Inc. of Beaumont, Texas Engineer's final certificate 3. This Certificate is given in connection of the final payment under the contract betweenthe~,~ pAISD ana AllrO and with the knowledge that it will be relied upon in making such payment and that such payment would not be made except upon the truth of the matter contained in this affidavit. Page 1 of 2 IN WITNESS WHEREOF, the undersigned has signed and sealed this instrument this 8th day of _, 20_p_e_. ( Pro' ct an er s-- L (Signa re.an Title o fficer) SEAL) ~~~, pig , being frst duly svaorn on oath, deposes and says, (Affiant) first, that he is the pro3P~r rranagPr of the r______~.,~*~n company . (Title) (Name of Company) second, that he has read the foregoing certificate by him subscribed as Y Project Manager (Title) _ Allco, Inc. (Name of Company) of the construction company Affiant further states that the matters and things stated herein are true. (Affiant) Subscribed and sworn to before me this ~3 ~` day of pia ~m ~ . My commission expires .~ ~ Za/ ~.. (Dat ) „~,,.,,,, ~~~ (Notary) ,A~ ~;; REBECCA L. PELLERIN "~ MY COMMISSION E%PIRES ;~Sti'{, May 9, 2012 Page 2 of 2 EXHIBIT C CONTRACTOR'S CERTIFICATE OF GUARANTEE FROM: A.1 i-~_ _ (Name of Contractor} TO: City of Port Arthur (Local Public Agent) REFERENCE CONTRACT NO. N/A ENTERED INTO THE 28th DAY OF March..2007 ,BETWEEN THE Port Arthur Independent School District AND Allco OF Beaumont:. Texas (CITY) {STATE) FOR THE (Name ns) OF THE Port Arthur High School (Name of Project) LOCATED 1N THE CITY OF PORT ARTHUR, TEXAS: KNOW ALL MEN BY THESE PRESENTS• 1 A ~' cc does hereby guarantee all of the work done under the above referenced contract to be free from faulty materials in every particular, and free from improper workmanship, and against injury from proper and usual wear; and agrees to replace or re-execute without cost. to the Owner such work as may be found to be improper or imperfect, and to make good all damage caused to other work or materials, due to such required replacement or re-execution. 2. This guarantee shall cover a period of one (1) year from the date of acceptance of all ~~~ork under this Contract, as evidenced by Fittz ~ shipman, Inc. of beaumont, fiexas Engineers final certificate 3. This Certificate is .given in connection of the final payment under the contract between the~~~ pAISD ana Ali o and with the knowledge that it will be relied upon in making such payment and that such payment would not be made except upon the truth of the matter contained in this affidavit. Page 1 of 2 IN WITNESS WHEREOF, the undersigned has signed and sealed this instrument this 8th day of 20 na . EAL) Pro ct a er L- "' (Signa re a . Title Officer) iu h p • ,being first my sworn on oath, deposes and says, (Affiant) first, that he is the pr~3P~+ Manartar of the ~ r +-+~n company (Title) (Name of Company) second, that he has read the foregoing certificate by him subscribed as Project Manager of the construction company (Title) Allco, Inc.. (Name of Company) F Affiant further states that the, matters and things stated herein are true. (Affiant) Subscribed and sworn to befcre.rrle this /3~ day of 2~4 0200 My commission expires ~ 0 (Date) ~+"~ ~a- REBECCALPELLERIN "= MV COM1IMISSION EXPIRES. ~~•'v'r,'•aR'' Mey9,2012- ~~~ ~~~ (Notary) Page 2 of 2 EXHIBIT D CERTIFICATE OFACCEPTANCE FOR Construction of the Public Water System to Serve the PAISD High School Campus at Sgt. Lucian Adams Dr. & 9`h Avenue IN THE CITY OF PORT ARTHUR TO: Allco, Inc. &PAISD Gentlemen: This is to certify that the City of Port Arthur, Texas, accepts the completion of the public water system for the above development on the basis of the Engineer's Certificate of Completion, the Contractor's Certificate of Guarantee, and the Contractor's Certificate and Release, executed by Joseph Ping, Project Manager, of Allco, Inc. 4 Stephen Fitzgibbons City Manager ATTEST: Terri Hanks City Secretary