Loading...
HomeMy WebLinkAboutPR 14783: TROY CONSTRUCTION - 27" SAN. SEWER REHAB BY REMOVAL & REPLACEMENT METHODMEMORANDUM CITY OF PORT ARTHUR UTILITY OPERATIONS DEPARTMENT TO: Stephen Fitzgibbons, City Manager / FROM: Kelly Eldridge, Director of Utility Operations f L~~~ d DATE: June 23, 2008 SUBJECT: Proposed Resolution No. 14783 COMMENTS RECOMMENDATION I recommend that the City Council approve Proposed Resolution No. 14783 authorizing the execution of a contract with Troy Construction, LLC, of Houston, Texas, in the amount of $207,850.00 for 27" Sanitary Sewer Rehabilitation by Removal and Replacement Method. BACKGROUND Last month, a contractor performed cleaning and television inspection of a 27" vitrified clay sewer pipe installed during the 1980's EPA Construction Grants Program. This inspection revealed several major failures that require(d) immediate excavation repair, and much more that will require sealing/lining in the neaz future. Last year just downstream of this section, we repaired a 30-foot long cave-in section at a cost of about $130,000. This project will replace about 500 feet ofpipe that is too deteriorated for in-situ rehabilitation (lining). Once these excavation repairs are complete, we will proceed with a project to line a substantial portion of the remainder of this long line. On June 18, 2008, we opened three bids for this work. Troy Construction, LLC, of Houston, Texas, submitted the lowest bid meeting the requirements of our advertised specifications and is therefore recommended for awazd. BUDGET/FISCAL EFFECT This project was estimated at $225,000. Funds aze available in Fund No. 426-1625-532.83-00, Project No. 426012. STAFF/EMPLOYEE EFFECT City staff designed and will oversee this project. SUMMARY I recommend that the City Council approve Proposed Resolution No. 14783 authorizing the execution of a contract with Troy Construction, LLC, of Houston, Texas, in the amount of $207,850.00 for 27" Sanitary Sewer Rehabilitation by Removal and Replacement Method. P.R. No. 14783 06-23-OS RESOLUTION NO. A RESOLUTION AWARDING A CONTRACT AND .AUTHORIZING THE EXECUTION OF SAID CONTRACT IN THE AMOUNT OF $207,850.00 FOR 27" SANITARY SEWER REHABILITATION BY REMOVAL AND REPLACEMENT METHOD BETWEEN THE CITY OF PORT ARTHUR AND TROY CONSTRUCTION, LLC, OF HOUSTON, TEXAS. ACCOUNT NO.426-1625-532.83-00, PROJECT NO.426012. WHEREAS, the City is currently under an Agreed Order with the TCEQ to analyze and rehabilitate its sanitary sewer system; and, WHEREAS, the City performed cleaning and television inspection of certain sewer lines to determine the best rehabilitation method; and, WHEREAS, the City of Port Arthur advertised and received three bids from contractors for 27" Sanitary Sewer Rehabilitation by Removal and Replacement Method; NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT the City Council of the, City of Port Arthur hereby awazds the contract for 27" Sanitary Sewer Rehabilitation by Removal and Replacement Method to the lowest bidder to-wit; Troy Construction, LLC, of Houston, Texas; and, THAT the City Manager of the City of Port Arthur is hereby authorized to execute on behalf of the City of Port Arthur a contract between the City of Port Arthur and Troy Construction, LLC in the amount of $207,850.00, a copy attached hereto as Exhibit "A"; and, THAT a copy of the Bid Tabulation is attached hereto as Exhibit "B"; and, THAT the contractor shall not proceed onany phase or segment of this work until a Notice to Proceed is issued; and, THAT the said contract is an exact duplicate of a City Standazd Form contract except for the changes (if any) shown in the Certificate of Standazd Form Contract, a copy of which is attached P.R. No. 14783 06-23-08 Page 2 of 3 hereto as Exhibit "C", and said changes are hereby approved; and, THAT a copy of the caption of this Resolution be spread upon the Minutes of the City Council; and, THAT the contractor shall sign the contract documents as well as this resolution agreeing to the terms hereof. READ, ADOPTED AND APPROVED THIS day of 2008 at a Regular Meeting of the City Council of the City of Port Arthur, Texas, by the following vote: AYES: Mayor Councihnembers: NOES: Deloris Prince Mayor ATTEST: Terri Hanks City Secretary APPROVED AS TO FORM: Mazk Sokolow ~ ~ /~ City Attorney C ~ '"~y~" ~~ P.R. No. 14783 06-23-08 Page 3 of 3 APPROVED FOR ADMINISTRATION: Stephen Fitzgibbons City Manager Kelly Eldridge Director of Utility Operations APPROVED AS TO AVAILABILITY OF FUNDS: (.~.CX.L Rebecca Underhill Director of Finance Account No.: 426-1625-532.83-00 Project No.: 426012 AGREED TO: roy Construction, LLC { Z 5~~~ Date Exhibit A is available for review in the City Secretary's Office EXHIBIT B CITY OF PORT ARTHUR BID SHFET llESCRIPTION: 27" SANITARY SEWER REHABILITATION BY REMOVAL AND REPLACEMENT METHOD DATE: JUNE 18, 2008 NAME OF BIDllER NAME OF BIDDF,R NAME OF BIDDER BRYSTAR "TROY CONSTRUCTION ALLCO, INC. CONTRACTING HOUSTON, TEXAS BEAUMONT, TEXAS EEAUMONT, TEXAS ITEM QTY UOM Description of work UNIT TOTAL UNIT TOTAL UNIT TOTAL LF 500 Remove 27" VCP and Rcplace w/ 27"PVC, $300.00 $150,000.00 $286.90 $143,450.00 $380.00 $190,000.00 I SDR-26, 15-20 ft. Deep Complete and Covered in Place EACH 3 Remove, Rcplace, Relocate 8xisling $7,000.00 $21,000.00 $9,625.00 $28,875.00 $14,500.00 $43,500.00 2 Manhole w/48" Diameter, New Fiber IasslS-20ftdee wm letcN lace LF 550 Trench Safety System, Full Depth Over 5 ft., $1.00 $550.00 $5.00 $2,750.00 $15.00 $8,250.00 3 All Excavation as Per OSHA Standards LS 1 Well pointing/Dewatcrvtg System $3,600.00 $3,600.00 $5,000.00 $5,000.00 $54,000.00 $54,000.00 4A Mobilisation And Set Up As Needed LF GW Well point Lengths, AllDcpthsasRequired $20.00 $12,000.00 $30.00 $18,000.00 $28.00 $16,800.00 4B in field EACH 4 Diversion/I3ypassPumpingw/one 8" $1,200.00 $4,800.00 $2,000AO $8,000.00 $8,500.00 $34,000.00 $ Additional Pump, Complete Set Up As re aired TON 100 Extra Cement Stabilized for Backfill $34.00 $3,400.00 $26.00 $2,600.00 $28.00 $2,800.00 ~ Where approved ~ 'I'ON 150 Extra Granular Rock or Approved Equal For $30.00 $4,500.00 $37.00 $S,SS0.00 $38.00 $5,700.00 i e beddin as re aired $ CY 20 Extra Concrete, 3000VSIWhereOrAs $150.00 $3,000.00 $85.00 $],700.00 $275.00 $5,500.00 a roved 9 LS I Cash allowance for lab tests, relocations, $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 as a roved er invoice b others TOTAL $207,850.00 $220,925.00 $365,550.00 DATE: PURCH BID Tf2: CITY OF PORT Ad2THIJR 444 4TII STREET P.O. BOX i0~1 PEIRT ARTIILIR, TEXAS 77640 Proposal of ~ ~~ ~r"'hT/w~'' ~0~, ~~ ~- (hereinafter called "BIRDER "), organized and existing under the laws of the State of , doing business as*'/i1(`( '~hT1wG]ar, LLL and acting by and through l/~y ni~>~; LLL to the City of Port Arthur, Texas (hereinafter called "OWt~TER"). , In compliance with your Advertisement for Bids, BIDDER hereby proposes to perform all work for the construction of 27 inch Sanitary Sewer Rehabilitation by Removal and Replacerree[et Method, in strict accordance with the Contract Documents, within the time set forth therein, and at the prices stated below, and to enter into Contract for same within the time specified in Contract Documents. By submission of this BID, each BIDDER certifies, and in the case of a joint BID, each party thereto certifies as to his own organization, that this BID has been arrived at independently, without consultation, communication, or agreement as to any matter relating to this BID with any other BIDDER or with any competitor. BIDDER hereby agrees to commence Work under this Contract on or before a date to be specified in the Notice to Proceed letter and to fully complete the Project within 45 consecutive calendar days as specified in the Notice to Proceed, including, but not limited to, all Saturdays, Sundays, and Federal, State, and City holidays thereafter. BIDDER further agrees to pay as liquidated damages, the sum of $500.00 fo but not limited to, all Saturdays, Sundays; Section 51 of the Genera] Conditions. Enclosed is bid security as required. reach consecutive calendar day thereafter including, and Federal, State and City holidays as provided in BIDDER achno•.vledges receipt of the following Addendum: (if issued and applicable) *Insert a corporation; a pyhnership, or ~ individual, as app!icabie. BIDDER agrees to perform all the work described in il]e Contract Documents for the following unit prices of lump sum: N/A D-1 EXHIBIT C (city of Port Arthur) .(Law Department) (Required Form) (7/8/88) (10/5/89) (3/15/90) (9-8-94) (p.2 Revised 9/18/90) CERTIFICATE OF STANDARD FORM CONTRACT FOR LAW DEPARTMENT REVIEW AND CITY COUNCIL AGENDA I certify that the contract (hereinafter called "said contract") affixed to the attached Proposed City Council Resolution No 14783 is an exact duplicate of an applicable standard form contract (the title of which is shown below) previously approved by the Law department and adopted as a standard form by City Council Resolution, except for the blanks that have been filled in with all necessary information and except for the changes described below. The title of the applicable standard form contract is: [] Federally Funded Construction Contract, Revised 1 /5/88, 7189, 8/89; 4/28/94 [X] Non-Federally Funded Construction Contract, Revised 1 /5/88, 7/89, 8/89; 4/28/94 [ ] Federal -Professional Services -Engineering Contract, Revised 1 /5/88, 5/89 (§10) 7/89/(§8); 10/89; 2/91 (§8) [ ] Non-federal -Professional Services -Engineering Contract, Revised 1 /5/88, 5/89(§10), 7/89(§8), 10/89; 2/91(§8) [ ] CDBG -Professional Services -Engineering Contract, Revised 1 /5/88, 5/89 (§10), 7/89(§8), 10/89; 2/91 (§8) [ ] Federal -Professional Services - Non-Engineering (Consultant) Contract, Revised 1 /5/88, 5/89 (§10), 7/89 (§8); 10/89; 2/91 (§8) [ ] Non-Federal -Professional Services - Non-Engineering (Consultant) Contract, Revised 1 /5/88, 5/89 (§10), 7/89 (§8); 10/89; 2/91 (§8) (] CDBG -Professional services - Non-Engineering (Consultant) Contract, Revised 1/5/88, 5/89 (§10), 7/89 (§8); 10/89; 2/91 (§8) [ ]Other Standard Form Contract, described as follows: The changes are as follows: (Put an "X" in the appropriate [ ]) [X] None. [ ] The following described provisions at the indicated page, section, etc. of the standard form have been deleted from said contract: Page 1 of 3 (p.2 Revised 9/18/90) (Certificate of Standard Form Contract, page 2) DELETIONS Page Number Where Deleted Provision Is Found On Standard Form None. Section or Paragraph No and Caption Which Contains Provision Deleted From Form Subsection or Subparagraph No. and Caption Which Contains Provision Deleted From Form Description of Provision Deleted [ ] The following described provisions at the indicated page, section, etc. of the standard form have been altered, modified, replaced or otherwise changed: ALTERATIONS, MODIFICATIONS, REPLACEMENTS, ETC. Page No. § or ¶ No. 8 Where Caption of Provision Found Standard Form on which Standard Form Contains Provision Sub § or Sub ¶ No. 8 Caption of Standard Form which Contains Provision Page 4 & caption sub § 8 caption, etc. of said contract Description which contains of altered, etc. provision; Provision 8 in Description of Standard Form Alteration etc. Page 2 of 3 p.3 Revised 9/18/90} (Certificate of Standard Form Contract, page 3) (] The following provisions have been added to Said Contract: Page, Section and Caption Subsection and Caption, etc. of Said Contract Which Contains the Added Provision and Description Thereof I further certify that said attached proposed City Council Resolution contains the following provision: 'That said contract is an exact duplicate of a City Standard Form Contract except for the changes described in the Certificate of Standard Form Contract, a copy of which is attached hereto as Exhibit "C" and is hereby incorporated by reference, and said changes are hereby approved." I understand that this certificate will be relied on by the Law Department in reviewing and approving (or rejecting) as to form and by the City Council ih reviewing and adopting (or rejecting) said Resolution and Contract. Signed this % 3.,d day of '~ un>; , 2008. lCe-~ f~~~ Department~l+ead Page 3 of 3