HomeMy WebLinkAboutPR 21747: CHANGE ORDER #1 FOR THE WEST PORT ARTHUR ROAD ELEVATED STORAGE TANK ort rtlrtt1�
1,
INTEROFFICE MEMORANDUM
Date: January 29, 2021
To: The Honorable Mayor and City Council
Through: Ronald Burton, City Manager
From: Donnie Stanton, Interim Director of Water Utilities
RE: PR 21747–A&M Construction and Utilities—Change Order#1
{Project: West Port Arthur Road Elevated Storage Tank}
Introduction:
The intent of this Agenda Item is to seek City Council's approval of Change Order #1 for the
City of Port Arthur West Port Arthur Road Elevated Storage Tank with A&M Construction
and Utilities, Inc. as the contractor (project designed and managed by Schaumberg & Polk,
Inc.) On August 4, 2020, the Council passed Resolution No. 20-246, which awarded A&M
Construction and Utilities, Inc. with the construction phase of the West Port Arthur Road
Elevated Storage Tank contract, in the original contract amount of$635,800.00. Change Order
#1 has a net decrease of$18,000 on the total cost, by deducting $40,000.00 for lead abatement
and adding $22,000.00 for new six (6') foot tall chain link fence with three strands of barb
wire and twenty (20') foot double swing drive gate, resulting in a net decrease of$18,000.00
for a new contract amount of$617,800.00.
Background:
On August 4, 2020, the Council passed Resolution No. 20-246, which awarded A&M
Construction and Utilities, Inc. with the construction phase of the West Port Arthur Road
Elevated Storage Tank contract, in the original contract amount of$635,800.00.
Budget Impact:
Change Order #1, if passed by Council, will decrease the original contract amount by
$18,000.00 to a new contract amount of$617,800.00, without extending the completion date.
Funds are available in Account No. 405-1621-532.85-00, Water System; Project No. R19267.
Recommendation:
It is recommended that City Council adopt Proposed Resolution No. 21747, thereby decreasing
the contract amount by $18,000.00, to a new contract total of$617,800.00.
"Remember, we are here to serve the Citizens of Port Arthur"
P. R. No. 21747
01/29/2021 bw
Page 1 of 3
RESOLUTION NO.
A RESOLUTION AUTHORIZING THE CITY MANAGER
TO EXECUTE CHANGE ORDER #1 TO THE CONTRACT
BETWEEN THE CITY OF PORT ARTHUR AND A&M
CONSTRUCTION AND UTILITIES, INC. OF ROWLETT,
TEXAS FOR THE WEST PORT ARTHUR ROAD
ELEVATED STORAGE TANK PROJECT, DECREASING
THE CONTRACT AMOUNT BY $18,000.00, BRINGING
CONTRACT TOTAL TO $617,800.00; ACCOUNT NO. 405-
1621-532.85-00,WATER SYSTEM; PROJECT NO. R19267.
WHEREAS, pursuant to Resolution No. 20-246, City Council awarded a contract to
A&M Construction and Utilities, Inc. of Rowlett, Texas for the construction phase of the West
Port Arthur Road Elevated Water Storage Tank for the amount of$635,800.00, which includes a
base bid lead abatement item with an amount of$40,000.00; and,
WHEREAS, Change Order #1 reassigns a portion of the unused funds for lead
abatement to a new 6-foot-tall chain link fence with barbed wire and 20-foot double swing gate;
and,
WHEREAS, the contract amount would be a net decrease of $18,000.00, bringing the
new contract amount to $617,800.00; and,
WHEREAS, Schaumberg & Polk, Inc., Project Engineer, has submitted Change Order
#1 (attached hereto as Exhibit "A") to the construction of the West Port Arthur Road Elevated
Storage Tank, decreasing the contract amount by $18,000.00; and,
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF PORT ARTHUR:
P. R. No. 21747
01/29/2021 bw
Page 2 of 3
THAT, the facts and opinions in the preamble are true and correct; and,
THAT, the City Manager of the City of Port Arthur is hereby authorized and directed to
approve Change Order #1 to the contract with A&M Construction and Utilities, Inc. of Rowlett,
Texas of Rowlett, Texas, decreasing the contract by $18,000.00, to a new contract total of
$617,800.00.
THAT, a copy of the caption of this Resolution be spread upon the Minutes of the City
Council.
READ,ADOPTED, AND APPROVED THIS day of , 2021 at
a Regular Meeting of the City Council of the City of Port Arthur, Texas, by the following vote:
AYES: Mayor
Councilmembers
•
•
NOES:
Thurman"Bill" Bartie
Mayor
ATTEST: APPROVED AS TO FORM:
Sherri Bellard Valecia izeito
City Secretary City Attorney
P. R. No. 21747
01/29/2021 bw
Page 3 of 3
APPROVED FOR ADMINISTRATION:
Ronald Burton
City Manager
Donnie Stanton
Interim Director of Water Utilities
APPROVED AS TO AVAILABILITY
OF FUNDING:
nek„,0
Kandy D 'e1 Clifto Williams, CPPB
Director of Finance Purchasing Manager
Account No.: 405-1621-532.85-00;
Project R19267
EXHIBIT A
(Change Order 1)
APPROVAL OF CONTRACT CHANGE
CHANGE ORDER No.One(1)
DATE: January 29,2021
PROJECT: City of Port Athur
HWY73/SPUR 93 Elevated Storage Tank Rehabilitation
OWNER: City of Port Athur,Texas
444 46 Street
Port Arthur,Texas 77640
CONTRACTOR: A&M Construction and Utility,INC
4950 Grisham
Rowlett,Ttexas 75088
TO THE OWNER: Approval of the following contract change is requested.
Reason for Change: to add a new bid Item to remove and replace the existing site chain link fence with a new 6 ft tall chain link fence with 3
strands of barb wire and 20 ft double swing drive gate;and to delete Bid item 18 Lead Abatement.
ORIGINAL CONTRACT AMOUNT: $ 635,800.00
THIS CHANGE ORDER
18 Lead Abatement-DELETE 1 LS @$40,000.00/LS $ (40,000.00)
New Item
24 Remove and replace the existing site chain link fence with a new 6 ft tall chain fence with 3 strand barb wire and $ 22,000.00
20 ft double swing drive gate ADD 1 LS @$20,0000/LS
TOTAL AMOUNT OF THIS CHANGE ORDER: $ (18,000.00)
TOTAL REVISED CONTRACT AMOUNT INCLUDING THIS CHANGE ORDER: $ 617,800.00
CONTRACT TIME
Original Contract Time: 150 calendar days
Requested change In Contract Time 0 calendar days
Revised Contract Time per this Change Order 150 calendar days
CONDITION OF CHANGE:
"Contractor acknowledges and agrees that the adjustments in contract price and contract time stipulated in this Change Order represents full
compensation for all Increases and decreases in the cost of,and the time required to perform the entire work under the Contract arising directly
or indirectly from this Change Order and all previous Change Orders. Acceptance of this waiver constitutes an agreement between Owner and
Contractor that the Change Order represents an all inclusive,mutually agreed upon adjustment to the Contract,and that Contractor will waive all
rights to file a claim on this Change Order after it is properly executed."
RecomASended,•y: i f Approved by: Accept d• :
4fr ;
Schaumburg&•olk,Inc. City of Port Arthur A nstruction and Utility,INC
Engineer ` Owner Con ractor
Date: O�i//J�' 0f l Date: Date: 2/1/21