HomeMy WebLinkAboutPR 21750: CHANGE ORDER CONTRACT WITH SETEX CONSTRUCTION CORP t•,tv n/ ort rthu�— ma, www.PortArthurTx.gov INTEROFFICE MEMORANDUM Date: January 12, 2021 To: The Honorable Mayor and City Council Through: Ron Burton, City Manager From: Alberto Elefano, Director of Public Works RE: P. R. No. 21750 Introduction: Approval of Proposed Resolution No. 21750 authorizing the City Manager to execute a change order to the contract with SETEX Construction Corp. of Port Arthur, Texas for the Sabine Pass area ditch cleanout in an amount not to exceed of$14,707.00. Background: This change order will allow for the rental of additional equipment needed in the area between Hwy 87 and the Sabine Pass High School football field. The ground in this area was too soft, not allowing for the use of dump trucks and other heavy equipment. Additional equipment will have to be rented, i.e.,tracks and a marsh dump buggy, in order to clean this area. Budget Impact: Funds are provided in Account No. 001-1204-531.34-00, Public Works Department Drainage Division— Drainage Maintenance. Recommendation: It is recommended that City Council authorize the City Manager to approve P. R. No. 21750, as discussed and/or outline above. /aw "Remember,we are here to serve the Citizens of Port Arthur" P.O.Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8101 X FAX 409.982.6743 P. R. 21750 1/12/21 - aw RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDER NO. 1 TO THE CONTRACT WITH SETEX CONSTRUCTION CORP. OF PORT ARTHUR, TEXAS, FOR THE SABINE PASS AREA DITCH CLEANOUT INCREASING THE CONTRACT AMOUNT BY $14,707.00 TO A NEW CONTRACT TOTAL OF $80,302.31. FUNDING AVAILABLE IN PUBLIC WORKS DEPARTMENT DRAINAGE DIVISION—DRAINAGE MAINTENANCE ACCOUNT—001-1204- 531.34-00. WHEREAS, on October 13, 2020, per Resolution No. 20-345, the City Council awarded a contract for the Sabine Pass area ditch cleanout to SETEX Construction Corp. of Port Arthur, Texas, in the amount of$65,595.31; and, WHEREAS, during construction of the project, it was determined that the ground in the area between Hwy 87 and the Sabine Pass High School football field was too soft to maintain heavy equipment requiring additional rental equipment to complete the project; and, WHEREAS, SETEX Construction Corp. has submitted Change Order No. 1,Exhibit"A", for the project and the Public Works Department staff recommends approval; now therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT,the facts and opinions in the preamble are true and correct; and, THAT, the City Manager of the City of Port Arthur is hereby authorized and directed to execute, on behalf of the City of Port Arthur, Change Order No. 1 to the contract between the City of Port Arthur and SETEX Construction Corp. increasing the contract amount $14,707.00. to a new total of$80,302.31; and, THAT, a copy of the caption of this Resolution be spread upon the Minutes of the City Council. P. R. 21750 1/12/21 - aw READ, ADOPTED, AND APPROVED this the day of , A.D. 2021 at a meeting of the City of Port Arthur, Texas by the following vote: AYES: Mayor Councilmembers: Noes: Thurman Bill Bartie Mayor ATTEST: APP OVED AS TO FORM: (it& ct-A— 4_,Aays Sherri Bellard alecia Tizeno City Secretary City Attorney APPROVED FOR ADMINISTRATION: APPROVED AS TO AVAILABILITY OF FUNDS: / Ron Burton Kandy Daniel City Manager Director of Finance Alberto Elefano Clifton Williams Director of Public Works Purchasing Manager P. R. 21750 1/12/21 - aw Exhibit A • SETE)çCONSTRUCTION CORP Sabine Pass 'Strength in Construction' Select Ditch Clean Out Change Proposal No.1 January 6,2021 Project: "City of Port Arthur-Sabine Pass Select Ditch Clean Out" Subject: "Proposal Letter-Change Proposal No. 1" Mr Clifton Williams This will serve as our proposal to Excavate, Grade and Remove sediment build up on both sides of the 700 ft ditch discussed. Sediment, Grass & Debris will be moved to a Location Across 11"'Ave. Costs include supervision insurance, material, labor and equipment A Proposed Exclusions: • Moving any City Water/Sewer Tap • Gas lines • Bores for water or Sewer across road ways • Sales Tax • Hydroseeding or Sod Replacement • The scope of work under this contract expressly does NOT include investigation, detection, abatement,replacement, removal or detoxification of a Hazardous Environmental Condition. • 'Hazardous Environmental Condition" means any type or form of Chemicals, Oils, Sewage, asbestos, lead or Petroleum byproducts. • Performance and payment bonds. • Unforeseen items beyond scope/underground obstructions. Total Proposed Cost $ 14,707.00 We estimate approximately(5)working days' total duration. We trust the proposal meets with your approval and please advise us accordingly. Respectfully Submitted. DJ Robinson SETEX Construction Corp. Established 1990 • CHANGE ORDER NO. 1 ORIGINAL AGREEMENT DATE:November 18, 2020 PROJECT DESCRIPTION: Sabine Pass Area Ditch Cleanout CHANGE IN SCOPE: Excavate,Grade and Remove sediment build up on both sides of the 700 ft ditch near Sabine Pass School CHANGE TO CONTRACT AMOUNT: ORIGINAL CONTRACT PRICE:$65,595.31 CURRENT CONTRACT PRICE(adjusted by previous CHANGE ORDER):$65,595.31 The Contract Amount due to this CHANGE ORDER will increase by: $14,707.00 The new CONTRACT AMOUNT including the CHANGE ORDER will be: $80,302.31 ORIGINAL CONTRACT DAYS: 90 NEW CONTRACT DAYS:90 SIGNED AND AGREED TO on the_day of , 2021. SETEX CONSTRUCTION CORP. Print Name: Title: SIGNED AND AGREED TO on the_day of , 2021. CITY OF PORT ARTHUR BY: RON BURTON, CITY MANAGER