Loading...
HomeMy WebLinkAboutPR 21688: ELECTRICAL TRANSFER STATION REPAIRS AT THE WATER PURIFICATION PLANT City of o,-r rthu�� Texas INTEROFFICE MEMORANDUM Date: March 23, 2021 To: The Honorable Mayor and City Council Through: Ronald Burton, City Manager From: Donnie Stanton, Interim Director of Utilities RE: PR 21688—Electrical Transfer Station Repairs at the Water Purification Plant Introduction: The intent of this Agenda Item is to seek City Council's ratification for the emergency repair of the electrical transfer station at the Water Purification Plant at 1101 H.O. Mills Boulevard. The electrical transfer station provides power to the Water Purification Plant and was damaged by a power surge to the plant. The plant could not purify water without electricity at this point. Emergency authorization from the City Manager was sought due to the critical nature of the electrical transfer station in the Water Purification process, for the protection of public health and safety. Peak Engineering of Port Neches, Texas, was chosen to do the repairs and provide generators in the amount of$66,463.86. This is considered to be a fair and reasonable price for the required work. Budgeted funds are available in Account No. 410-1252-532.42-00, Equipment Maintenance. Background: The electrical transfer station provides power to the Water Purification Plant at 1101 H.O. Mills Boulevard and was damaged by a power surge to the plant, detailed as follows: On February 10, 2021 at approximately 7:45am it was noted that part of the facility had lost power and the breakers inside the 15kV switchgear that distributes power to the facility had tripped open on a ground fault. Peak Engineering was called out on site to investigate,and it was noted that both feeder breakers that feed power to the new substation at the high service building and the new MCC building had tripped. Since both feeders were energized but only one of them had load, this was an indication that a fault had occurred on a common location for both feeders. "Remember,we are here to serve the Citizens of Port Arthur" C'i h'rr J nr4t7r Texas After tracing out the two feeders, we found the 15kV transfer switch at the new MCC building (TS2) had faulted on the load bus interconnecting the two 15kV load interrupter switches. It is believed this fault occurred on the bus insulator between phase A and phase B and could be due to manufacture defect and/or high moisture content. With this piece of equipment being a custom engineered item, it was noted that repair would not be completed in a timely manner, and a generator was called out to back feed power to the MCC building until the parts could be sourced to repair TS2. Also,the feeders for TS2 were disconnected allowing the energization of TS l and providing additional variable speed high service pumps on standby. For contingency plans, it was agreed to have a second generator on stand-by at the Houston yard dedicated to the Water Purification Plant. After the power was restored and generator and equipment operation were verified, we started dismantling the damaged pieces of TS2 while noting required replacement parts. On February 11, 2021, Peak Engineering was working with the switch manufacturer to develop a detailed list of replacement parts/lead times to have all this information by February 12,2021. Disassembly of TS2 was completed and TS 1 was evaluated in detail and cleaned. It was noted TS 1 did not show the same signs of moisture intrusion as TS2. Also, during our investigation, it was noted the space heaters in both TS1 and TS2 were not operating properly. Per the City's request due to the winter storm arriving, Peek Engineering put the plan into motion to relocate the standby generator from the Houston yard to the Water Plant to allow for more reliability in the event the existing generator fails. The second generator was on site February 12, 2021 at approximately 8am. Budget Impact: Funding in the amount of$66,463.86 is available for the above mentioned repairs and generators in Account No. 410-1252-532.42-00, Equipment Maintenance. Recommendation: It is recommended that City Council approve P. R. No. 21688, ratifying the emergency repair of the electrical transfer station and backup generators at the Water Purification Plant. "Remember, we are here to serve the Citizens of Port Arthur" P.R. No. 21688 3/23/21 bw Page 1 of 2 RESOLUTION NO. A RESOLUTION REQUESTING THAT CITY COUNCIL RATIFY THE CITY MANAGER'S DECISION FOR THE EMERGENCY REPAIRS TO THE ELECTRICAL TRANSFER STATION AND PROVIDE GENERATORS AT THE WATER PURIFICATION PLANT BY PEAK ENGINEERING OF PORT NECHES, TEXAS WITH A TOTAL BUDGETARY IMPACT OF $66,463.86, ACCOUNT NO. 410-1252-532.42- 00, EQUIPMENT MAINTENANCE. WHEREAS, the electrical transfer station provides power to the Water Purification Plant at 1101 H.O. Mills Boulevard and was damaged by a power surge to the plant on February 10, 2021, which caused immediate public health and safety concerns; and, WHEREAS, this electrical transfer station was repaired and generators were provided by Peak Engineering of Port Neches, Texas, under emergency conditions authorized by the City Manager; and, WHEREAS, pursuant to Section 252.022(a)(2) this purchase is authorized because of a public calamity that requires the immediate appropriation of money to relieve the necessity of the municipality's residents or to preserve the property of the municipality; and, WHEREAS, it is further authorized pursuant to Section 252.022(a)(3) because of unforeseen damage to public machinery, equipment, or other property; and, WHEREAS,the total budgetary impact for the repair of the electrical transfer station and provide generators is $66,463.86; and, WHEREAS,City Manager approved proceeding with these repairs on an emergency basis (Exhibit A). NOW THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT, in order to protect the health and safety of our citizens, the City Council hereby approves and ratifies the expense of the emergency repairs to the electrical transfer station and provide generators with a total budgetary impact of$66,463.86 (Exhibit B); and, P. R. No. 21688 3/23/21 bw Page 2 of 2 THAT, funding is available in Account No. 410-1252-532.42-00, Equipment Maintenance; and, THAT, a copy of the caption of this resolution be spread upon the minutes of the City Council. READ, ADOPTED, AND APPROVED THIS day of 2021 at a Regular Meeting of the City Council of the City of Port Arthur, Texas,by the following vote: AYES: Mayor Councilmembers: NOES: Thurman"Bill"Bartie Mayor ATTEST: APPROVED AS TO FORM: L� hJ2144,-/el Sherri Bellard alecia Ti eno City Secretary City Attorney APPROVED: FOR ADMINISTRATION: APPROVED AS TO AVAILABILITY OF FUNDS: Ronald Burton Kandy Dan' 1 City Manager Interim Director of Finance I // Donnie Stanton Clifton Williams, CPP: Interim Director of Utilities Purchasing Manager EXHIBIT "A" itIV°"! r I/;-11'1" INTEROFFICE MEMORANDUM Date: February 10, 2021 To: Ron Burton, City Manager From: Donnie Stanton, Interim Director of Utilities RE: Approval for Emergency Repairs to Water Plant An electrical surge damaged the transfer switch at the Water Plant on Hwy 73. This surge knocked out power to the main plant and the damage to the transfer switch prevents us from running the generator. The combined cost of repairs by Peak Electrical, LLC and generator rental from Stewart & Stevenson is estimated to be $30,000. The Utilities Department is renting a 500kW 480 volt generator from Stewart& Stevenson to run the plant. Multiple bids were not solicited due to Local Government Code allowances to preserve Public Health and Safety from emergency conditions. This is a potential direct threat to the health and safety of the citizens of Port Arthur. Pursuant to Section 252.022(a)(2) this purchase is authorized because of a public calamity that requires the immediate appropriation of money to relieve the necessity of the municipality's residents or to preserve the property of the municipality. It is further authorized pursuant to Section 252.022(a)(3) because of unforeseen damage to public machinery, equipment, or other property. Emergency approval is requested of the City Manager to hire a contractor, Peak Electrical Engineering,to troubleshoot and make emergency repairs. A proposed resolution will be presented to City Council for ratification. Account number is 410- 1252-532.42-00, Equipment Maintenance. I, Ron Burt"'.pprove the emergency repair to the Water Plant. id I I eitt\ Ron Burton City Mana.• "Remember,we are here to serve the Citizens of Port Arthur" EXHIBIT "B" PEAKPO Box 969 Invoice Port Neches, TX 77651 ENGINEERING •Co"etr,x Phone: (409)729-2226 Date Invoice# 3 19,2021 4450 Bill To Ship To City of Port Arthur City of Port Arthur PO Box 1089 1101 H.O.Mills Road Accounts Payable Port Arthur,TX 77640 Port Arthur,TX 77641 S.O. No. P.O.No. Terms Due Date Other l2l-l0; 222938 Net 30 4,18;2021 15KV LIS Fault Item Description Ordered Prey. lnvoi... Invoiced Rate Amount Equipment AC voltage detector 1 0 1 69.00 69.00 Equipment 5kV Megger 1 0 1 262.20 262.20 Equipment 320kW Generator 2 0 2 4,450.17 8,900.34 Equipment 4/0 AWG,50'cables with pigtails 2 0 2 207.00 414.00 Equipment Standby 320kW generator 2 0 2 1,670.15 3,340.30 Equipment Adjustment for Generator Rentals for monthly 1 0 1 9,925.32 9,925.32 instead of weekly. Also include freight, maintenance,and fuel. MMR to provide support labor to Water Treatment Plant 15kV LIS Fault project. Technical Serv... MMR Time for 2/10/2021 and 2/11/2021. 1 0 I 2,080.30 2,080.30 Technical Serv... MMR Time for 3/1/2021-3/4/2021 1 0 1 10,454.23 10,454.23 Technical Serv... ERS to test 15kV LIS switch 1 0 1 1,933.15 1,933.15 Equipment Fuses and Fuse Clips 1 0 1 4,160.67 4,160.67 Equipment Materials: 1 0 1 3,042.38 3,042.38 Terminal Strips Wire Insulators Micarta Board Equipment Materials: 1 0 1 226.73 226.73 Plastic Tape Lectra Clean Red Urethane Coating Silicone Tape Equipment Bus Sections 1 0 1 2,049.17 2,049.17 Equipment (12)6"Red insulators 1 0 1 286.07 286.07 Subtotal Sales Tax (8.25%) Total Payments/Credits Balance Due Page 1 969 PEAK P Box Invoice Port Neches, TX 77651 I• h: N ING Phone: (409)729-2226 Date Invoice# 3/19/2021 445(1 Bill To Ship To City of Port Arthur City of Port Arthur PO Box 1089 1101 H.O.Mills Road Accounts Payable Port Arthur,TX 77640 Port Arthur,TX 77641 S.O. No. P.O. No. Terms Due Date Other 121-10 222938 Net 30 4 IS 2021 15KV LIS Fault Rem Description Ordered Prey. Invoi... Invoiced Rate Amount Senior Engine... Josh Landry Reg his 2/10/2021-2/12/2021 Site 24 0 24 140.00 3.360.00 visit to troubleshoot tripped 15kV switchgear breakers. Identify fault on load bus of T2 15kV LIS transfer switch. Isolate T2 from power distributions system and re-energize TI. Source generator for T2 substation and assist with set up and connection to MCC via generator breaker. Work with switch manufacture to establish detail bill of material to replace material in equipment that was damaged form fault. Prepare event summary,plan for repairs, and estimate. Identify material that can be sourced from other suppliers and OEM to shorten lead times. Identify fuse and fuse holders as longest lead item. Submit two options for repairs that include material sourced from manufacture and other suppliers. Start working with other suppliers for sourcing parts and equipment. Subtotal Sales Tax (8.25%) Total Payments/Credits Balance Due Page 2 p EnK PO Box 969 Invoice Port Neches, TX 77651 ENGINEERING Engineers•Constructors Phone: (409)729-2226 Date Invoice# 3/19/2021 Bill To Ship To City of Port Arthur City of Port Arthur PO Box 1089 1101 H.O.Mills Road Accounts Payable Port Arthur,TX 77640 Port Arthur,TX 77641 S.O. No. P.O.No. Terms Due Date Other 121-107 222938 Net 30 4/18/2021 15KV LIS Fault • Item Description Ordered Prey. Invoi... Invoiced Rate Amount Senior Project... Kirk Wyble Reg hrs 2/10/2021 and 2/12/2021 30 0 30 120.00 3,600.00 Called out to find the cause of a ground fault on both 15kV feeders to the new MCC at High Service building and the new MCC for the new train. I found serious ground fault indications at LS2 which is the 15kV transfer switch at the new train building. It appeared,upon further inspection that the heat strips were not protecting the interior of the switch and caused a 30kV fault in the switch. We proceeded to isolate the feeder from LS1 to LS2 and re-energized LS1 to enable operations to use HSP-2 and HSP-6 if needed. We were given approval to disassemble LS2 and remove all affected parts and start a clean up to asses all damage needed to be replaced. A material list was generated and submitted to various vendors. Material has been ordered,but due to the weather delivery could be slow. Senior Enginee... Josh Landry Reg hrs 2/15/2021-2/19/2021 13 0 13 140.00 1,820.00 Work on specifications for replacement material in medium voltage load interrupter switch that was damaged during the fault. Verify other manufacture options match same specifications as originally equipped for medium voltage EJO fuses,live parts of fuse holder,heater circuit wire,barriers,low voltage cable,polymer insulators,and porcelain insulators. Subtotal Sales Tax (8.25%) Total Payments/Credits Balance Due Page 3 P EnK PO Box 969 Invoice Port Neches, TX 77651 ENGINEERING En •c nsti,,tors Phone: (409)729-2226 Date Invoice# 19 2021 4450 Bill To Ship To City of Port Arthur City of Port Arthur PO Box 1089 1 101 H.O.Mills Road Accounts Payable Port Arthur,TX 77640 Port Arthur,TX 77641 S.O. No. P.O. No. Terms Due Date Other 121-107 222918 Net 30 4118,2021 15KV LIS Fault Item Description Ordered Prey. lnvoi... Invoiced Rate Amount Senior Project... Kirk Wyllie Reg hrs 2 16 2021 Traveled to S 0 8 120.00 960.00 facility and confirmed insulators,micarta board and buss pieces were correct due to the drawings that had been provided by the manufacturer. Contacted the insulator and micarta board vendor to proceed with the order. Delivered buss pieces to vendor for replacement. Expecting material to be delivered week of 2/21/2021. Confirmation will be provided after shipping. Senior Project... Kirk Wyble Reg firs 2/22/2021,2/23/2021,and 20 0 2ll 120.00 2,400.00 2/26/2021 Started receiving material and transporting what had been delivered. Still waiting on some material that is due at the end of the week. Contacted MMR superintendent to confirm that we could start with repairs on Monday 3/1.Rented megger and tested existing cables from LS1 to LS2. Both sets megged out ok and the cables to LS2 were secured in LS1 so that the power could be energized for operation of HSP2 and 6. Gathered all remaining material and took it out to jobsite. Verified MMR would be able to start work on Monday. Subtotal Sales Tax (8.25%) Total Payments/Credits Balance Due Page 4 P EnK PO Box 969 Invoice Port Neches, TX 77651 E N G I N E E R. I N nvineerv•C'.nnstnctrnv Phone: (409)729-2226 Date Invoice# 3 19 2021 4450 Bill To Ship To City of Port Arthur City of Port Arthur PO Box 1089 1101 H.O.Mills Road Accounts Payable Port Arthur,TX 77640 Port Arthur,TX 77641 S.O. No. P.O. No. Terms Due Date Other 121-107 222938 Net 30 4 18 202 1 15KV LIS Fault • Item Description Ordered Prey. lnvoi... Invoiced Rate Amount Senior Enginee... Josh Landry Reg hrs 3 1 2021 and 3/4/2021 13 0 13 140.00 1_`t2onu Coordinate testing requirements and scope of work with testing group. Site visit to test re-assembly of 15kV load interrupter switch per NETA acceptance and maintenance testing. Perform insulation resistance on linel,line2, and load bus and identify B-phase values were below NETA acceptance values. Investigate line 1 and line 2 bus and identify insulators and bus boots showed signs of tracking and corona. Determine 12 insulators on both line bus sides required replacing. Source new insulators and material to repair. Replace insulators,clean porcelain with Collinite,and sealed glastic. Confirmed switch tested within NETA acceptable values. Test 15kV cables feed A, feed B,and transformer 1600 feeder and confirm values above NETA acceptable values. Assist with energizing and verify operation of equipment with substation power. Subtotal Sales Tax (8.25%) Total Payments/Credits Balance Due Page 5 PEAKPO Box 969 Invoice Port Neches, TX 77651 ENGINEERING Imp •Con strKt Phone: (409)729-2226 Date Invoice# H 21)21 445n Bill To Ship To City of Port Arthur City of Port Arthur PO Box 1089 1 101 H.O.Mills Road Accounts Payable Port Arthur,TX 77640 Port Arthur,TX 77641 S.O. No. P.O. No. Terms Due Date Other 222938 Net 30 4;18/2021 15KV LIS Fault Item Description Ordered Prey. Invoi... Invoiced Rate Amount Senior Project... Kirk Wyble Reg hrs 3/1/2021-3/4/2021 40 0 40 120.00 4,800.00 Isolated TS2 and TS1 so that MMR could begin installing new parts into the switch. Energized TS 1 so that the plant could run HSP2 or 6 if needed. Bus bar,insulators,and micarta board were installed. Called in a MMR hand to install stress cones on the feeder to transformer TR1600. Vertiv began testing the entire switch and found other issues,involving moisture,that would cause problems later in the future. It was decided to correct all issues at this time due to the fact the switch was de-energized and parts were available. Upper bus bars and insulators were removed,cleaned and new insulators were installed. Testing was started again and all parameters were met. TS1 and TS2 were terminated and energized. Rotation was checked and everything looked good. System was turned over to plant personnel. Senior Enginee... Josh Landry Reg hrs 3/9/2021 and 3/10/2021 4 i i 4 140.00 560.00 Coordinate pick up and delivery of two generators. Review and comment on rental quantity and duration. Review and comment on preliminary testing report. Prepare final project summary and submit. Subtotal $66,463.86 Sales Tax (8.25%) $o.00 Total $66,463.86 Payments/Credits $0.00 Balance Due $66,463.86 Page 6